kmpm
Members-
Content Count
5 -
Joined
-
Last visited
Community Reputation
0 NeutralAbout kmpm
-
Rank
Member
Previous Fields
-
Gender
Male
Recent Profile Visitors
377 profile views
-
Summit Design Studio
kmpm replied to rosliluxe's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
Usually I never give any testimonial or complaints unless necessary, since this is our first home (4rm resale flat) and we are very satisfied and happy with the work delivered by Carol Lim from Summit Dezign Studio Pte ltd. It was a like time racing for us to choose the right ID as we need to move out from existing rented flat as soon as possible (as our son need to start the school soon in our new place and avoid unnecessary rental cost). Initially received recommended ID from our property agent but the proposal is not interactive, checked in this forum and found couple of IDs. Few reasons why we decided with Carol Lim Recommended by my friend She can commit on the short timeline on our requirement – she did it! The proposal is the best as far as I have received from other IDs, where all the details have been highlighted – you will see all the cost everywhere but this is very helpful for us to short listed the renovation priority Communication, very responsive – can be done with WA group (with my wife as well) and she will entertain your message until midnight Space planning – very open, since I like to plan the layout on my own, she will try to accommodate my plan and share her input as well Budget – you got what you paid. I have a short budget, but will her proposal, I can utilize the budget wisely Work Masonry: very neat and professionally done, overlay of bathroom floor tiles has good water flow. Full renovation in the master bathroom was done perfectly as same as 3D drawing.Painting: Paint job was standard, this because of the short timeline for painter to paint the whole house within 2 days as we need to move in in the 3rd day. Painter was able to come and touch up a few times towards the end of the project.Glasswork, door-work and laminate floor: Overall good job, love my new floor and shower glass so much. The PD-Door in both bathrooms is just great, thanks to Carol had informed us to use this instead of bi-fold door.Plumbing: Both bathrooms are problem free up to nowCarpentry: We love the most with the carpentry; the results are just reflected as per 3D drawing. Planned to get 2nd and 3rd bedroom built-in cupboard with her in futureElectrical: Installation is very neat. Some issued with the HS's light. Initialy I thought I purchased the light and was asking her why the light is not install. Without doubts, she asked the electrician to get the new one and install. But, when we both checked on the my fitting purchased bill, actually no light for HS been purchased. paiseh, have complained to her, but she happyly responded that the light FOC for me. waw so great! And the electrician is very friendly also, as we need to drill some AC remote to the wall, he happily do it with smile.Overall:Project handover period on time as scheduleWe have moved in for 2 months and so far no rectifications required, except the ceiling fan (is not related to the renovation). But when we told her last night about this problem, she responded very quickly and help me to follow-up with the electrical shopDetails: HDB 4A, 95 sqm Received Key: 10 July 2015 Renovation started – 11 July, end 14 Aug 2015PM me for her contact and photo Regards, KmPm -
hi Aron, please quote me - supplying and replacing existing sys 2 to sys 4 - inverter system: 9/9/12/24 - any brands: ME, Panasonic, Daikin? or else that can be considered. - available date as the renovation starts on 13 July thanks
-
Ceiling Fans & Downlights...etc - Trusted Supplier Since 2011
kmpm replied to bro's topic in Electronics & Electricals
Hi bro, Any good recommendation, I was looking for 4 ceiling fans for 3 bedrooms and living are for my 4 room HDB. Planning to have L-box false ceiling. - come with remote - good air flow - should go metal or plastic? - without light - cheapest and the best Thanks!- 2,867 replies
-
- onsite visit
- installation
- (and 8 more)
-
Aircon Installation Best Price
kmpm replied to AirconBestValue's topic in RenoTalk Member Privileges
hi, can you quote me for supplying and replacing the existing sys 2 to sys 4? 1) 2x9K BTU / 12KBTU / 24K BTU 2) energy saving 3/4 ticks 3) info detail such as warranty, insulation, pipes, gas thanks, -
Summit Design Studio
kmpm replied to rosliluxe's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
Hi Can someone please help to pm me carol contact?