Hi All, I am a first time buyer and very lost on renovation. So appreciate advice if these items are reasonable. Kitchen Area:1. To do base for kitchen cabinet. - $400.00 2. "Supply & install one set kitchen cabinet with selected laminate & abs trimming up & downest 22ft c/w s. steel dish rack at right wall kitchen". - $2,640.00 3. Supply & install Quartz top for cabinet est 11ft at right wall kitchen area. - $1,320.00 4. Supply & install kitchen cabinet at left wall kitchen up & down est 15ft. - $1,800.00 5. Supply & install 4ft Quartz table top at left wall kitchen. - $480.00 6. To do sink support at kitchen sink area. - $750.00 7. Eletrical point at kitchen & change est 2 pcs wall tiles. - $200.00 8. Connection for kitchen sink. - $100.00 9. Supply & install tempred glass backing at cabinet area est 15ft. - $900.00 Remarks : If only cooker area $180 KITCHEN YARD: 1. Supply & install aluminium 3 track sliding window c/w aluminium grills LIVING & DINING AREA:1. Supply & install false ceiling at main entrance , dining area & walk-way c/w curtain pelmet at window living with one side L-box. - $1,100.00 Remarks : If living need cove light design + $ 300 2. To do looping point est 10 nos with labour installation down light & one ceiling fan. - $420.00 Remarks : If have cove light add 4 point +$ 140 3. Supply & install one nos 4ft full height shoe rack with design at entrance. - $1,200.00 4. Supply & install tv feature wall c/w console with design est 11ft. - $3,520.00 Remarks : If 8ft $ 2560 5. Install one nos scv point , 2 double point & main control at tv area. - $180.00 MASTER BEDROOM: 1. Supply & install one nos 6.5ft sliding wardrobe. - $1,885.00 BEDROOM 2: 1. Supply & install one nos 5.5 sliding wardrobe at room 2. - $1,595.00 2 TOILET:1. Supply labour to install 2 toilet assoseries & one heater tank. - $160.00 2. Supply & install one nos bi-fold door at master toilet. - $220.00 3. Supply & install cabinet at vanity master toilet. - $300.00 4. To do one kerd at master toilet. - $120.00 5. Supply & install one nos 10mm tempred glass shower screen at m.toilet. $450.00 6. To do one L-shape kerd at c.toilet. - $120.00 7. Supply & install L-shape shower screen at c.toilet. - $680.00 OTHER:1. To do whole house painting ( original paint ). - $1,250.00 2. Haulage & debris. - $250.00 3. wash & clean up window. - $180.00 4. Supply labour to install 3 bedroom light , balcony , 2 toilet light. - $80.00 5. Supply & install living & 3 bedroom grills est 95sqft. - $665.00 Total $ 23,615.00