tension_z
Members-
Content Count
473 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by tension_z
-
hi, can u PM me how much u pay for the bed? Cos I ordered one as well.
-
those who bought 40" or 42" LCD TV, are your house 4rm or 5rm? will it be like "too near"? my reno.havent start. Have to wait till christmas sale or end of year sale then can buy....
-
hey thanks, actually how does the ID ask for 20% commission?
-
wow, alister, can i use your surname as well? Going to buy lights soon.
-
hi, i think it is reasonable. My reno. cost is 28k. I have : 1.homo tiles for living and 2 bedrooms, and bombshelter ( a little diff from u) 2.Laminate flooring for MBR 3.NO PLATFORM. cos i was quoted a near $2000 for it with storage, I strike it off. 4. Vanity in the masterroom toilet 5. Featured wall and TV console 6. Shoe cabinets and Mirror Featured wall 7. Kitchen Cabinet only 8. HAck Wall for WIW(a little diff from u) 9. Overlaying of 1 toilet flooring 10. No Grills ( a little diff from u) 11. Build in Wardrobe for bedroom 2. 12. False Ceiling 13. Include painting and some plumbing works and installation of toilet accessories. so do you think you are "chopped"?
-
how much did u buy for ur LCD TV? Which model. how many inch?
-
hi, does ur 24k quote include hacking of wall or overlaying of toilet? or any additional things other than the basics?
-
anyone here bought LCD TV from SITEX? I am thinking of buying one from there but my ID is "taking his own sweet time" to renovate. Do you think I should wait for the Christmas sale, year end sale or even the Chinese New yr sale?
-
ok, thanks for the info, cos i read from forum somewhere that this is a clause to protect ourselves if the reno works delay for too long, say more than 4 months. Pray that that there is no major hiccups...
-
hi all, for those who already signed for the contract, did the ID state in the contract the targetted date of completion? ie if delay for a day, company have to refund a certain amt. of $ per day?
-
hi all, ask you a question about renovation quote? is $28,000 very ex. for a 4 rm 90 m2 flat? This amount included the gst, all flooring, hack a wall, build a walk in wardrobe, 1 additional wardrobe, false ceilings, paint whole house, bomb shelter feature wall with storage, living room tv feature wall with storage, overlay tiles for 1 toilet plumbing works etc... is it on the high side? I know my descrption is quite vague. can i know how much does u guys spend on reno for ur flat?
-
hi, for those who already signed with your ID, how long does ur ID take to do the 3d drawing of your house? do they show you the 3d before renovating?
-
pure designer will either take $1000 cash, doing the planning and 3d drawings for you, or take 10 % of the total reno. price. This is what I heard from my friend who used to be an interior designer. I didn't ask her to do for me, too close friends, she hard to earn , I hard to comment or bargain. :]
-
Hi Gad man, Is this a good deal? Samsung LA-40R81BX 40" LCD TV Now $3,599 (U.P: $3,799) FREE! • Philips 32" LCD TV (worth $1,199) • Samsung free gift (worth $599) -> duno what this is...
-
hi there, do u think you can put up your floor plan here? i am always curious to see how a 75 m2 looked like.
-
hey thanks for all the reply with regards with the feature wall. at least I knw I am not being conned. next is, who is doing a platform in the MBR here? what is the price range?
-
hi I am also doing a feature wall to cover the bomb shelter. ID quote me from 1000- 1900, is that normal? the expensive range is one with storage.
-
Some info. Pls comment on quote. New Standard Flat ( no flooring done except for kitchen, and toilet) Flat size : 90 m2 hacking works 1 hacking of exisiting L3ft at master bedrm $270 (exclude P.E fees) Tiling works 1 Plaster smooth affected wall after hacking at master bedrm $110 2 Construct L4.5ft concrete sink support by using 63mm hollow blocks and 300mm x 300mm homogenous tiles $850 3 Construct cement base for fridge ,kitchen cabinet and washing machine $390 4 Supply and lay homogenous tiles at bomb shelter $260 5 Supply and lay homogenous tiles **** and dining area $1850 Laminated Floor board 1 Supply and install selected laminated floor board at 3 bedroom including skirting $1620 (Range of Power Dekor laminated floor board to be selected) Ceiling and Partition works 1 Supply and install flat false ceiling **** and passage to bedrms $730 2 Supply and install flat false ceiling at walk in wardrobe $120 3 Supply and install L14ft x H 8 ft pained partition wall for walk -in wardrobe at master bedrm $560 4 Supply and install L box ( depth 450 mm) at master bedroom $280 (note: price of L box exclude curtain pelmet Glass works Supply and install 2 no. of W 3 ft x H 6 ft x 10 mm fixed tempered clear glass at master bathroom $250 Plumbing works 1 Extend exisiting pipe to new kitchen sink position $80 2 Install 1 no. of kitchen sink and tap including connecting inlet and outlet pipes $150 3 Install 1 no. of storage heater $90 Install 2 sets of bathroom accessories $60 Carpentry works Living Room 1 Supply and install L8ft full ht storage cabinet cum wall feature at household shelter entrance in selected laminate finishes $1760 2 Supply and install L 6 ft TV console in selected laminate finishes $ 780 3 Supply and install L 6 ft x H 8ft TV feature wall in selected laminate finishes c/w groove line or stainless steel inlay design $1440 Kitchen 1 Supply and install L 15.5 ft top + L 8.5 ft bottom kitchen cabinet using laminated doors c/w ABS trimming, selected handles, cutlery and drainage tray $2880 2 Supply and install L 13 ft Montelli solid surface worktop $ 1040 3 Supply and install 1 no. of L 4 ft X H 8 ft sliding doors by selected laminates c/w top sliding track $880 Master Bedroom 1 Supply and install 6 x vertical poles + 6 x haging rods + 8 x L3ft shelves + 1 x 3 tier drawer $1800 2 Supply and install L9ft study ledge in selected finishes $540 3 Supply and install 1 no. of L3ft x H7ft sliding doors by using selected laminates c/w top sliding track $780 Electrical Works 1 Shift and relocate 3 nos. of existing light point at bedrm 2 and living with installation @$30 per point $90 2 wire and install 10 nos of light points @ $55 per point $550 3 installation of 7 nos. of ceiling lights $ 70 4 add one single socket @ $45 per pt at fridge area $ 45 5 Add direct switch at cooker area $ 75 Misc 1 Painiting of walls and ceilings for whole house by using ICI emulsion paints (pentalite series) $1150 2Provide proetction cardboard and general washing $300 Total= $21850 Hi people, any comments about the items in the qutation above? basically, I am just doing an extra Walk in wardrobe, other than that, it is quite basic. is there any hidden items that are not in the quotation? any items overcharged? Thanks in adv.
-
hmm, any $ paid to him? I don't understand how an agreement can be done without signature. Since he is recommended your sis in law, see how he fare for the time being. if he doesn't produce, then tell him that you are engaging another contractor since he is so busy. I m in blk D.
-
did he give u a valid reason for the delay? when you signed for the contract, did you state the date of completion?
-
I have heard of part time cleaner, they count their salary by per trip. Usually it is $50-$100 per trip, 4 hours a session, depending on how big your house is and how detail you want them to clean. but not really worth it. because a maid's salary now is about 300-350 ..last time used to be 280-320... and the maid is with you everyday. of cos' I haven't add govt levy+ maid's makan+ other misc expenses. to maintain a maid, you will need to fork out at least a $1000 (assuming $320 pay+ $280 levy + $300 makan + $100 unforseenable expenses like fall sick, buy toiletries etc = about $1000)
-
welcome congee77