Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

popeye gal

Members
  • Content Count

    185
  • Joined

  • Last visited

Everything posted by popeye gal

  1. Nice curtain .. may i know where you bought it?
  2. I also have problem with my feature wall Backing. Think after all, i had a lesson. further nor matter how nice or beautiful it is. Should not do any feature wall, if wanted really need conceal or cover with laminte.
  3. Nivek, just bought im starting off with hts 3100. Think will receive by end of the mth. How you find that model? Need Advise from Experts thanks..
  4. Yah. think some of the neighbours also still waiting... they said need 3 mth to order the Door (from the date we send our defectlist to hdb) yah yah wouldn't believe that kind of story Think it's their way of saying so that the owner wouldn't want to wait so long and they can save Their cost damage... For me as long as they change a new want for me within the 3 mths i ok with it. At Least it's New..
  5. If they(contractor) dun't do work and keep delaying, send Your Defects list (things not solve yet) Again to HDB. Then the contractor will call you in two or three working day.. Ask them to gave you a deadline by when can they fix the Problem. Im still waiting for my Main Door to be change, which the 3 months deadline of waiting going to reach. will call chase them.
  6. Im also using allbest, glad the they did a great job. after hearding so much bad comment on the forum. But have't install the interior Unit yet. the Chelsea so good services ah... can save some bus fare too..
  7. They had replacement the protection film for my window panel. Now im also waiting for my main door replacement.
  8. Just reply you.. ooo.. same Layout.. Which blk?
  9. Dun't know ne.. think he mean will scratch in long term bah.. Dun't want My house to be in dark tone.. like white.. as it will look more spaceious But think my furniture mostly will be in dark tone..
  10. Picture Was Defected Glass panel, The hdb had send the contractor to change the "protection film" Not that the Glass got Defect. *note for all neighbours, The contractor said that we can't use newpaper for cleaning as there is a protection film, will have scratch mark.
  11. After revising About 5 or 6 times. Finally, my 3D Drawing is out... For the Window Glass panel, The Photo was the Defect... The hdb had send the contractor to change the "protection film" Not that the Glass got Defect. *note for all neighbours, The contractor said that we can't use newpaper for cleaning as there is a protection film, will have scratch mark.
  12. jjcian, you would at home today ah? Just back from my house, was there almost the whole day.. Cuz lighting install today. if know, you would at home can go there... hehehe.. Btw, do you had Bedframe for your bed? in your picture shown like dun't have.
  13. Which Dealer? Can PM me? If i wait till Mid year sales, May the price Drop abit.. $953 was a abit steep.
  14. sportster, We are all waiting for it to launch, so you Reserve the fridge?
  15. Nikon supporter too... Beginner D40X
  16. Hahaha... Already told you that our ceiling design is the same... hehehe..
  17. Thanks.. Ceiling Work Done.. Just Have't install all the Downlight...
  18. Long time not update... Painting in process...
  19. Forget to ask you where/how much you bought your Couch? Can PM too
  20. If it aligned, the lighting may not be bright enough right? For my L-Box, was intending to put two downlight at each L-box.. But in the end, my downlight point was about 17nos + 3nos Masterbedrm. !!
  21. hi NiVleK, Can i know your L-box( near the Dining Area), is it align with the HHS Wall?
  22. hi, do anyone know the Dimension for the 403V & 363V? Any Differ from the 402V & 362V? Need to comfrim the Dimension...
  23. wah... so fast in the process.. hope to see the finishing work...
×