Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

h4happy

Members
  • Content Count

    2,843
  • Joined

  • Last visited

Everything posted by h4happy

  1. I also not sure. I think the kitchen tiles and wiring still have some outstanding. But my guessing is once windows are installed and the paint are up and the internal are up, the inspectors will come and inspect all the units. That will take at least 1 month plus (as blk25b has the most units). So maybe by end of dec 07, the inspections will be complete and then hand over the keys to the hdb. After that, hdb will give out batch by batch probably around Mid Jan to end of Feb or maybe even early mar 08.
  2. Saw both side painted orange colour this late afternoon. I think the paint will be up by another 1 or 2 weeks. After that, inspection, and get ready for the key, probably around Jan to Feb 08.
  3. Hi BIN Count me in. Eager to see how your new home look like. But better if almost renovation is completed lah. Good luck! Remember to post your reno photos... Those waiting to collect key needs inspiration! Hi CINDY Congrat!! Now you really look forward to your renovation! When is my turn???
  4. Hi Xlan Thanks for sharing your present photos. In no time, your present house will be demolished. And it is right to take some photos. Hey, maybe you can frame it up and hang on your new home. I intend to do that. One photo each for living room, kitchen, bedroom and hang it on the new house. How is your renovation going on? Any pics???? Good luck!
  5. I dont have one. I try to take one maybe this weekend.
  6. Maybe when everybody is shifted in, we can organised a evening jog to mount faber. I remembered when I was young, jog to the mount faber at least once a week. The night view is fanstantic. Now....dont know whether can jog and reach mount faber or not! hehehehe.... Anyway, we have a roof top garden....I might make it a habit to job there at least once or twice a week. Dont need to job at the road side.
  7. Hi Zlia You can see my blog....(somewhere in the middle) about the placement of the stove for 4 and 5 room. 4 room just beside fridge area (about 3.2 ft, I think is enough for the stove. 5 room same as 4 room (abt 3.2 ft but is somewhere in the middle).
  8. Hi Applie Can take photos in their shop? They wont scold you for doing that? How about IMM shops, I saw a few a want, but dare not take any photos. HAPPY
  9. One thing bear in mind: Do not rush on your renovation. Better ask your id/contractor first. I think for your case, can make it lah, Next year Feb is CNY right? So got 3 month plus, enough lah! But if start on Dec 07...might a bit tight as most malaysian taking long CNY break.
  10. Hi VINCE I am not sure, just went up the overhead bridge and quickly snap one of this photo. How I wish they can construct a swimming pool solely for us and fends up. I dont mind pay monthly maintenance..... Just a dream.
  11. Hi Cindy Sure! No problem...go ahead! Btw, your id ever tell you the cost of per electirical point, etc...?
  12. Me cannot, short! Cannot jump. Knee cap painful when raining, age catching up lah.
  13. HI GAD, No lah, my kids studying Moral Child at JM....just a walking distance to our new flats.... I will post more if you like it. HAPPY
  14. Beside Blk25B: playground and basketball court.
  15. Windows installed...but not paint yet....long way to go.... Beside Blk25B: playground and basketball court.
  16. Yeah, my neighbour told me he also bought 2 compressor, 2 to 1 and 2 to 1. More powerful.
  17. I think should be lah...hehehehehe... Cos got this floor plan from one of the id....he told me the present master floorplan is not accurate.
  18. Hi DORCAS & ONE Yeah, only see the floor plan, play around with it...
  19. Hi Bernice What kitchen top you use? How much? Is it expensive? Thanks! HAPPY
  20. Cant get what you say... Oh yeah should be in meter. But the floor plan stated all in mm... Do be careful...the floorplan might out of measurement.
  21. Yes SUM....a very good point. Go to your nearest contractor if they provide a very low cost. Easy to find them, knock on their door every morning...hahahaha.... Morning cannot find them, go afternoon, afternoon cannot find them, go at evening or at night.... They sure dare not anyhow do!
  22. Oh sorry I think wrong measurement. Take ruler and 1.8cm = 1800mm 1800mm / 305 = 5.9 feet 0.7cm = 700mm 700mm / 305 = 2.3 feet
  23. Is it 3.6 (42inc) ft by 2.6ft (30 inc)?? Base on the floor plan.
×