Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

msbean

Members
  • Content Count

    218
  • Joined

  • Last visited

Everything posted by msbean

  1. HDB just call up me , abit disppointment he say my cases will ask the JM contractor to settle , and I say I duN see any work going on . Cant HDB do something to it . he say there is a lot of defect going on so the contractor maybe accumlate all defect and then use a tobala . I tell him I have 2 week nvr go down JM , I really worry my unit flood a not . call him better go chase them to act fast They say they are looking into this matters . think in charges of our place like is HDB officer Tan and chia ma . Think if u all have defect better email to HDB so they know there is problem there . They will call u in 1-2 days
  2. Ya write in maybe the best way , but I have email to HDB too , think they scare to reply me to start my reno as I ask is the rectify done ? . Anyone in this forum and in our JM good in english maybe can write a letter and we also sign as below . Problem is sent to who har > Town concil , HDB or MP (heehee our MP is Lee leh )
  3. wao kao exterior wall crack sound scary leh , dunno how many crack inside and we cant see with our own eye
  4. OMG same cases as my watermarks, better check today JM also rain very heavily
  5. YA i also very pek chek and worry , as I also dun hv naked eye to see all fault , Only can see those very obvious . I already 2 week ever go down already , dunno this week I go down will see what haiz haiz . I see soo many defect ,abit worry I have not check those also etc , plug , pipe
  6. Better to play safe (take photo of the defect )fax to them and email to both HDB and Contractor . I feel contractor dun show much care on our defect like sit there wait for thing to happen . All complain to HDB so HDB will know there is something wrong wif our area and hope they will action . (NO choice I have lost my patient with the contractor ) Normally the HDB officer will call u the nxt day . I so angry until I challenge the officer ask him this question " How u all rectifiy fault har " can repair my choke sink without going into my hse " and "rectifiy the watermarks without using a Botola is it " > he say that the only way the contractor have to rectifiy the fault for watermarks outside the building , they cant do nothing . I tell him u better check it out with the contractor . For me I waiting for a Black and white (by email) to tell me I can reno and rectify work is done . (delaying my reno sianz sianz)
  7. waa youralso very serious ,haiz haiz , die I nvr check the elect plug and the pipe also . Velynn your pipe do you have any picture to show ?? U mean the pipe burst and water leak out isit
  8. YA la we pay more than 1/4 of the million , and we have sooo many problem , isit we are part of the unlucky one , I wonder is there other unit have problem but they are not active in forums like us . Today rain whole day , I worry my Bedroom will flood (faint) .
  9. Ya either u call or email straight to HDB at bbmadmin@hdb.gov.sg and CC to the contractor at bmrc36@eptc.sg It better to give HDB so they will go down see and chase the contractor . is it there is gondola at Blk 196, but I never see them in my blk . what are the contractor doing . really worry . Happy u better take some picture for proof and keep it if future need it . by the way where is MBR wc ? What can the contractor do for my basin if it is choke har ? They duN need go in my unit one to fit it one isit heehee No one fit a appointment with me and they say they rectify . Power sia Word is more power than action . The word can make my sink choke . Wa kao very pek chek
  10. Oh mostly using them , now only need to change some item in the quote , this sat I go select tiles lor
  11. Getting impatient with the HDB Contractor . I dun see any work being done in our blk for this few week after the complain . I never see any tombola being hang and worker doing the repair work outside . Anyone see the 'Tombola" ?? The only reply from the contractor lady is they will do they will do the rectify work . should I start reno 1st ?
  12. waaa thank jacky , the guidelines I see until "gong gong " Mean if I want hack someway need to hv HDB approval right , so any charges for the paperwork ?? My bomb shelter door I wont remove after so many "man fan " issue and the sliding door cost me 780 A door leh . if next time shift hse I wont want to carry the door to my "future new hse "
  13. Sianz Sianz My ID say cant hack as there is HDB wall tiles there and need to wait 5 year .(she dun dare to do it ) If she hack ever kana fine I pay lor .
  14. I dun hv false ceiling or platform , where can I hide ??
  15. Dunno yet leh , actually I still dunno where and what to start , today meet my ID to see have artwork and design 1st . I only know she call as use water tank me also changing the SCV point too , good question tonight i ask my ID how . ANyone remove the bomb shelter door har ? as my ID say if I want to cover the bomb shelter actually i can remove the door and keep the door inside (as when you sell away yr unit need to put back the door only) . The only problem you have to find a place for the bomb shelter door .
  16. Woo have not start ,already need to spent money on bill . scare me , I only use my toilet for one time only leh .
  17. woo bathtub me also feel like having t , but i scare the bathtub put in our toilet like need small small type . End up if i put water in the bathtub and i jump in prehap all the water will flow out lor .
  18. I will go see my design artwork this week yeah yeah
  19. prehap I Also will do the same so the living sunlight can shine to kitchen else my kitchen very dark But only can hack abit right as the electricity box is behid and the kitchen there have some switches ?? If can hack more better heehee , I keep thinking how to make my kitchen look brighten
  20. [Kitchen entrance Did you hack abit on the entrance of the kitchen ?
  21. ALL neighbour if you all hv defect , like watermark or other pls report to HDB bukit merah better . As the officer from HDB tell me contractor never tell them hv watermarks also in other unit . They dUnno abt this watermarks issue . IMPORTANT " 27B IS THE CONTRACTOR NOT HDB " He say the contractor need to work and rectify , else cant hang over . Now I scare the contractor want easy job and get money fast fast so never report to HDB . Report pls attach the photo as proof will be better
×