msbean
Members-
Content Count
218 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by msbean
-
At last have some picture to make my own blog (yet to complete my reno ) Living Room MBR How to hide that ugly air con trucking !!!!!! HELP My Bedroom 1 and 2 Bedroom 1 and 2 Light My Toilet Kitchen My cute little light for Kitchen and toilet ( I love it most as it small and this bright
-
how to go that garden , I never know abt the garden sia
-
wat u mean the light at the basketball court never switch off one (after 10pm) because normally after 10pm hv to be auto switch off leh
-
Linggie , so sorry my side the electrican have finish his part when only be here again when the carpenter work is up . (ard 2-3 week later)
-
happy I will be in JM tommor (sun) ard 430 ,will u be there too
-
anyone have the gate uncle hp , as I want to increase my gate weld .
-
My also it normal my is full of toilet paper so end up I have to find a rob (I use the broom stick ) to poke the choke side so all paper can go thought , heehee abit disgusting la . So if u are using a lot of toilet paper hv to make sure inbetween of your "big business" flush a few time 1st
-
I just start my flooring today so happy after all the defect being settle , at last . Hope can finish around end of may or early may Hope this week they duN do too fast heehee else I cant take b4 and after picture
-
Onepostwonder and Dneo Can I join for the gathering too ? If yes I arrived around 705pm as I dismiss 6.30pm u all must wait for me leh
-
Thx Cindy , I will extra careful after your advise .
-
Nemofc do you have the uncle Hp number , I think of putting also as our area is having some broke in cases . Gate weld is the round round one is it ? Anyone can show me which part is that ? Pai she pai she bobo girl I dunno how to spell gondola
-
Hi very nice decals sia , how much is that ?
-
at last sat meet up with the main contractor to fix my basin and the socket . so happy the defect list almost done . The worker say sunday(today) if no rain they already schedules the "tobola" to fix the watermark outside . Hi neighbour if you see any "tobola" outside 25B tell me ok . One question I give my number lock number to the conrtactor so once they fix up I need to change the number for secuity reason ma ?
-
Ls2 Id
msbean replied to NiVleK's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
How your meet up , everything fine ? -
Thx very much crazycar I have to go down and figure it out to make myself clear . u change your basin and toilet bowl har
-
-
I can The main contractor but is a lady name alice answer , she talk like very YA YA leh . say we received your form only on 7/3 still early la , I say I sent in very early is your problem as HDB nvr submit early to u , I say so Now what can I do to rush your work done asap . Me also Karine call me to call Ms Eng , Now i need to go buy a lock so that contractor can go in , happy your lock go where buy one , I see yesterday u have a big lock with chain outside your gate .(problem is why never lock har yesterday around 5pm)
-
The main contractor call me put my key with 27B . so mean I need to buy a lock or just give them my master key ?? If buy a lock how big is the diameter of the lock ( i never go measure )
-
I just call up 27B branch to chase my issue . Karin say watermark settle , normally defect will take 2-3week , same old thing call me start work 1st
-
Yesterday I go back check all my plug and go around pluging in a 3 pin plug , aiya I find defect again so sianz of this . The socket is not seal/connected properly until the whole socket can be taken out and and see the holes inside . I alot of plug like nvr put enuogh silicon to seal in between the plug and the wall Wao Kao I no eye to see the defect so disappointed very very TL 1st question the HDB sink - if I have a ring drop inside the sink how am I going to take it out har ?? Big question as yesterday I think how and finding any screws on pipe cant find leh ? becos the sink below is a sink base already 2nd Question : Main door do it have magnet lock behid (else the main door keep closing if and I need someone to stand and hold on it while I outside) Becos of bedroom door all have it .
-
Aiya They dun dare as your cases have cash concern , not just normal work can handle it .
-
Hope HDB /Contractor will pay the 25% else BO HUA and Not worth it is not your problem ma
-
aiyo so serious 200+ leh , I see forums more and more worry and I still no time go see see , This sat after my selection of tiles I will go down check .
-
Ya scare next tIme no one want to buy our flat , haiz haiz problem Now only hope HDB can solve the problem
-
I think head MP is MR Lee Kwan Yew http://www.tptc.org.sg/meetmp.html