udtdvr
Members-
Content Count
23 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by udtdvr
-
">http://http://http://http://http://http://http://
-
">http://http://s1095.photobucket.com/user/7udtdvr/media/255/20141018_122835.jpg.html'>
-
">http:// As of today..will upload more pics when is more ready.
-
">http://http://s1095.photobucket.com/user/7udtdvr/media/255/20141003_173431.jpg.html'>
-
">http://http://s1095.photobucket.com/user/7udtdvr/media/255/20141003_173441.jpg.html'>
-
">http://http://s1095.photobucket.com/user/7udtdvr/media/255/20141002_123257.jpg.html'>
-
">http://http://s1095.photobucket.com/user/7udtdvr/media/255/20141002_122146.jpg.html'>
-
">http://http://s1095.photobucket.com/user/7udtdvr/media/255/20140927_173129.jpg.html'> Works resume on monday..
-
MBR Toilet ">http://http://http://
-
">http://http:// Kitchen before and after hacking
-
">http://http://s1095.photobucket.com/user/7udtdvr/media/255/20140922_191911.jpg.html'> this whole piece of internal wall still waiting for hdb's approval to hack off..two weeks already sigh...
-
">http://http://s1095.photobucket.com/user/7udtdvr/media/255/20140924_120111.jpg.html'> after chip off the tiles
-
No la juat 104 m2 ..the two common room and hall is quite big but MBR is smaller compare to my previous 4A flat 100m2.
-
still trying..
-
cant continue upload rest of the pics...why??
-
">http:// Wall tiles in living hall to be chip off.
-
will be start the reno on 23rd so one more week to count down..hope everything goes smoothly.
-
Hi forumers Getting my keys on 22nd this month.Already engaged one contractor to settle those priority things that have to do first due to limited time frame(1 month max) for me to do the renovation before moving in. Below are the quotation after negotiation. Hack and Redo whole MBR toilet..supply and install WC..Basin and accessories-$4000 overlay common toilet floor only..supply and install WC. .basin and accessories-$1000 a)Hack and redo kitchen flooring. b) Dismantle kitchen cabinet demolish concrete basin and cooking area and one bedroom wardrobe. c)Create Base for kitchen cabinet..fridge..washing machine. d)built half wall to divide washing machine and cabinet. e)Hack off wall between hall and kitchen to make it open concept. f)chip wall tiles at partial living hall's wall and make good. above items (a to f) -$5800 Total $10800.
-
">http://>
-
http://renotalk.com/forum/uploads/gallery_63683_3_90009.png
-
Hi forumers Can pls give opinion on below quotation. Thanks and appreciate. Hack and Redo whole MBR toilet..supply and install WC..Basin and accessories-$4000 overlay common toilet floor only..supply and install WC. .basin and accessories-$1000 a)Hack and redo kitchen flooring b) Dismantle kitchen cabinet demolish concrete basin and cooking area and one wardrobe. c)Create Base for kitchen cabinet..fridge..washing machine. d)built half wall to divide washing machine and cabinet e)Hack off wall between hall and kitchen to make it open concept. f)chip wall tiles at partial living hall wall and make good. above items a to f-$5800 Total $10800.