Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

XKO86

Members
  • Content Count

    1
  • Joined

  • Last visited

Community Reputation

1 Neutral

About XKO86

  • Rank
    Newbie

Previous Fields

  • Gender
    Male
  1. Hi people, I recently bought a resale unit at Choa Chu Kang and I've gone to several IDs for quotation. Below is the quotation that I got and I am seriously considering this ID. Hope that I can get some opinions from you guys as I am a first time home owner. A Demolition Works 1 To supply labour to dismantle existing top & bottom kitchen cabinets. 2 To supply labour to hack off existing both floor and wall tiles in common and master bathroom together with dismantling of existing bathroom accessories. Lump Sum: $2100 B Kitchen Works 1 To fabricate and install proposed finger-groove casement door top & bottom kitchen cabinet in selected laminate finishing c/w internal PVC finishing as per design. **Free Dish Rack **Soft closing system for all cabinet **ABS trimming for all door edges **Light holder with LED lighting Amount: $4500 2 To supply and install proposed Quartz worktop. Amount: $1900 3 To supply and install proposed white spray-paint tempered glass backing inbetween top & bottom cabinet. Amount: $1440 4 To supply and install proposed kitchen sink and tap c/w installing of piping. Amount: $305 5 To supply and install proposed kitchen hod and stove c/w installation of gas from PUB. Amount: $2250 6 To supply labour to relocate existing powerpoints. Amount: $160 C Common Bathroom Works 1 To supply and lay waterproofing @ common bathroom. Amount: $65 2 To supply and lay proposed selected anti-slip homogenous floor and ceramic wall tiles. Amount: $1135 3 To fabricate and install proposed suspended finger groove casement vanity in selected laminate finishing c/w internal PVC finishing and solid worktop. Amount: $560 4 To fabricate and install proposed top mirror come with wooden backing and cove lighting effect. Amount: $310 5 To supply and install toilet accessories ( Sink & tap, WC, spray gun, water heater, showerhose, toilet paper holder ). Amount: $920 6 To supply and install proposed tempered glass showerscreen c/w 01 nos of swing door. Amount: $640 D Master Bathroom 1 To supply and lay waterproofing @ common bathroom. Amount: $65 2 To supply and lay proposed selected anti-slip homogenous floor and ceramic wall tiles. Amount: $1135 3 To fabricate and install proposed suspended finger groove casement vanity in selected laminate finishing c/w internal PVC finishing and solid worktop. Amount: $840 4 To fabricate and install proposed top mirror come with wooden backing and cove lighting effect. Amount: $385 5 To supply and install toilet accessories ( Sink & tap, WC, spray gun, water heater, showerhose, toilet paper holder ). Amount: $920 6 To supply and install proposed tempered glass showerscreen c/w 01 nos of swing door. Amount: $640 E Miscellaneous Works 1 To apply for hacking and renovation permit from HDB.Amount: $280 2 To supply & lay corrugated protection paper @ all working areas. Amount: $200 3 Labour to provide haulage and clearing of debris.Amount: $200 4 To supply labour to paint whole unit. (4+1 colour)Amount: $1400 5 To supply labour for general cleaning before handing.Amount: $250 F Cabinet Door Works 1 To fabricate and install proposed cabinet door in selected laminate finishing at proposed area. Amount: $800 G Professional services 1 Design concept 2 Site Supervision Lump Sum: $600 Grand Total: $24,000
×