Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

waterfly

Members
  • Content Count

    7
  • Joined

  • Last visited

Community Reputation

3 Neutral

About waterfly

  • Rank
    Member

Previous Fields

  • Gender
    Male
  1. 1.1 - To install power source to 1 No x Emergency Light 1.2 - To supply and install 8 Nos x Powerpoints (double points) 1.3 - To supply labour and material to connect electricity from riser c/w meter at unit's riser 1.4 - To supply and install earth bond in unit 1.5 - To supply LEW for electrical drawings and endorsements(CS3/5) 1.6 - To supply and install electrical cable PVC casing (2"x3") 1.7 - To supply and install 1 No x Main DB in unit (Single Phase) (24 unit size) 1.8 - To supply and install 2 Nos x AirCon Isolator(Single phase 30Amp) 1.9 - Supply and installation of AIRCON Toshiba RAVSM1403AT-SG & RAV-SM1404UT-E Electrical Diagram as follows: https://drive.google.com/file/d/0B70gizvpQZwHemhKcUQtX01ldXcwUmtZZ3F4cVE2X0hwLTQ0/edit?usp=sharing Sketch of layout as follows: https://drive.google.com/a/wholesalesg.com/file/d/0B70gizvpQZwHTkdiTmQ5ZkdsSDA/edit?usp=sharing Room Size is 8m by 14m. No Partitions seperating all points. All installations within same room / area
  2. If any one has a decent and fairly priced electrician to recomend please send me his contact. Need to do up DB box and electricals for my office. Had taken qotes from 2 contractors, and they are asking $90 and $78 per double socket electrical point. i beleive this is high in reference from the othe forum posts? Much appreciated!
  3. go to courts or one of those big stalls and ask for quotations instead. they usually bundle everything into a sale
  4. friend of mine does this at his stall: 2 fans total. Stall front ------------------ | F2 | | | | | | | ----------------- F1 O Stall Rear (open up) Not sure if your stall config is similar, but basically the Fan1 Blows towards Fan 2, and Fan 2 blows towards O. I thought it was pretty ingenius, the place was pretty decent for all the cooking going on.
  5. Same strata unit, but sublet out to differrent companies..
  6. Hey Spencer, Appreciate if you could share the electricians contact. Thanks!
  7. As listed above, need recomendations for reliable and fair contractors. NO ID NEEDED. https://docs.google.com/document/d/1kNpzbPh9qTjF5A_W81JeQpEOOK0bt7wF1IyOkemS-fs/edit?usp=sharing https://docs.google.com/document/d/1UMkg48t9ccW_yJl-7nWp6bCqw_0Sw9GREQLfpOdrTO4/edit?usp=sharing Things that i require: 1. Partition walls needed to be build in RED 2. 6 internal doors 3. carpet on upper mezzanine 4. mezzanine to be built. Need contractors to quote estimates on the image above. Ground area is about 980sqft Ceiling height is 5.5m
×