Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Angelwrath

Members
  • Content Count

    581
  • Joined

  • Last visited

Everything posted by Angelwrath

  1. by right the keys are labelled leh.
  2. lol. ya i admit my ID quite fast. chop chop only but i still cant wait for me to see the finished product. 1 day finish electrical works 1 day finish false ceilings 2 days finish all tilings 1 day finish all the plumbling and install them liao ETA is one month finish liao, applefreak think u better rush ur contractor wor. they gonna do the platform structure today. Stay in tune for more pics
  3. I bought all my lights for $3.2k from Premier lightings at geylang 1 Living room Crystal floral light 1 Dining room Hanging light x 3 2 Bathroom Round Hamburger Lights 1 Master Bedroom round stringed light 1 Master Bedroom Walkway Milo tin Lights 2 Kitchen rectangular Lights 1 Storeroom Round Hamburger lights 1 Cosy corner birdnest x3 lights 2 Bedroom Square lights 2 kitchen cabinet PLC tube light 16 Downlights It overshot our budget and i think it's more on the pricey side lor. like kenna katuk.
  4. all the keys should be handed over after the sign here sign there leh. anyway the gas and water supplies also on the same day leh.
  5. candyprincess, albert, ur flats are completely new one is it? thus they do all the rectification together? town council closed down?! how can?! lol
  6. I also want to spam chop! my 1st spam chop! Congrats on ur new place! Is this Mr. Lim same as the one others have mention in another thread?
  7. yup, the one i told u guys in the other sembawang thread. orange walls, yellow floor tiles and blue WC, basin. =.= Will be changing the bi-fold door though. Yup, so far so good. hopefully it continues.. LoL =) Thanks thanks! 28/8/07 =)
  8. MBR L-box Living room L-box / Gap for curtain track False ceiling MBR toilet, dafault basin removed Rain shower installed Close up of tiles and skirting ok, that's all i have for today. taken yesterday night. somehow my pics turn out to be purplish, dont know why. the air-con piping will be up by today, will take more pics when i go up to the new place. Meanwhile, enjoy the holiday and long weekend for some. 20 more days till handover! Happy National Day! =)
  9. Day 7 of reno Storage heater up Common toilet Plumbling and lighting points for shadow lighting done. Tap for washer extended Tiled washer and fridge base Close up shot of my living room homogenous tile around $22k so far. How abt urs? and who's ur ID?
  10. More pics for the pixfreak! =) Day 3 of reno Washer and fridge base Electrical points in MBR Citygas HHS Protection Layer Trade tool
  11. OOHHH, Applefreak so smart. should really rename to pixfreak le. LOL here it goes, the floor plan =)
  12. Is it true that u cant attend ur friend's wedding if urs is 3 months before/after hers? She say will crash. I think it's crap lor.
  13. Uhm I'm on another singapore server so dont know him. LoL. myabe i go his server disturb him, lol ai yoooooooooooooooooooooo, Donut so cute!!!! especially the showered Donut. I also want...... !!
  14. Ok lunch time, post more later =) still cannot upload PDF leh, cannot print screen also
  15. MBR Bedroom 2 Bedroom 3 / Study room Living room windows si bei sian my flat's view is the opposite block, so near mine somemore. Before buying i thought it faces the open field. Well nvm, at least my MBR's side view can still see the field. Pardon my bad photography too. LoL. suppose to take walls then send to ICI ask to them for colour advices. So envious of small of you guys here, got full length windows!
  16. Testing testing. The permit Yay it worked! Here comes more. My tiny living room Our new kitchen tiles from HDB, main door Platform and bedrooms screeded. TV feature wall will be here too. Narrow kitchen passageway, after HDB hacked the old floor tiles
  17. Wah wah wah, thanks for all the warm welcome and my t-blog get to grace all the 1st time spam choppers. LoL I'm trying to upload the floor plan and the 3D drawings leh, but they are in PDF format. anyone know how I can upload those?
  18. Hello peeps! I've been lurking around looking at people's nice nice home for some time le, think it's time to start our own. hiak hiak hiak. Gotta our keys on 12th July, renovation going on now. ID officially started work on the 1st of August. Now is to figure out how to upload PDF file and pics.. Hmm..... Akan datang..
  19. lightings below the suspended cabinets, cause it will cast a shadow on the kitchen floor tiles. getting black solid surface, initially wanted white but will be weird if we having red and black cabinets lor.
  20. I agree about poh joo. I ordered on a saturday and they can deliver on the next working day. only con is their payment terms. LoL
  21. ME ME ME. me and hubby WoW addict. which server is Ran on?
  22. ROFL, therat u very funny. I really laugh out loud. i think my colleagues think i go ki seow liao.
  23. same as me! im gonna get black and red glossy cabinets too, with shadow lighting.
×