Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

milko7

Members
  • Content Count

    2
  • Joined

  • Last visited

Everything posted by milko7

  1. Hi Sheridan, Thanks for the advise. My flat is a standard 4rm so the size is 92sqm. We will only be doing the living area and also 3 bedrooms. HDB will do the cement screed for us.
  2. Dear Renotalkers, We know nuts about renovation costings, thus seeking advise here from expert to advise us if the quote provided to us from ID is reasonable or not. Many thanks in advance! (Standard 4 room BTO with cement screed provided by HDB in living area & 3 bedrooms) Preliminaries Supply labour & material to provide general cleaning upon completion to whole premise - $200 Supply labour & material to lay corrugated papers protection for whole house - $150 Provide Haulage & Debris charges for whole premise - $300 Transport & supply of sand & cement including uploading of materials - $500Masonry Works Supply labour & material to construct kerb at MBR bathroom & common bathroom area - $200 Supply labour & material to construct kitchen, washing machine & refridgerator base with tiles finish - $450Vinyl Flooring Supply labour & material to lay vinyl flooring at MBR - $1,500 Supply labour & material to lay vinyl flooring at common bedroom 2 & 3 - $2,100 Supply labour & material to lay vinyl flooring at liv-ing area - $2,450Glass Work Supply & Install 1 fixed x 1 casement clear glass shower screen at MBR bathroom - $650 Supply & Install 2 fixed x 2 sliding clear glass shower screen at common bathroom - $750 Supply & Install clear glass casement door at Kitchen entrance - $650Plumbing Supply labour to install 1 x handspray to both bathroom - $50 Supply labour to install 1 set of bathroom accessories each at both bathroom - FOC Supply labour to install kitchen sink c/w inlet & outlet piping at kitchen area - $90 Supply labour to connect washing machine inlet & outlet piping at kitchen area - $90 Supply labour to install storage heater - $120 Supply labour to install basin at MBR bathroom - $80Ceiling & Partition Work Construct false ceiling and L box ceiling c/w aclove light holder at liv-ing area - $ 1,600 Construct 2 sided partition wall at liv-ing area (around the main door size, full height) - $300Carpentry Work - Living Area (All casement doors c/w motionless mechanism & ABS Trimming) Supply labour to install L6ft design full height feature wall and laminate finish - $1,440 Supply labour to install L6ft design TV console and laminate finish - $780 Supply labour to install L3.5ft full height shoe cabinet and laminate finish - $880MBR Supply labour to install full height 8ft design casement wardrobe and laminate finish - $ 2,100Common Bedroom 2 Supply labour to install full height 6ft design casement wardrobe and laminate finish - $1,400Kitchen Area Supply labour & material to install design kitchen cabinet with laminate finish (Top: 21.5ft, Bottom: 21.5ft) - $5,360 Supply labour & material to install 1 x Flip-Up glass panel c/w dish tray - FOC Supply labour & material to install L21.5ft solid surface on top of bottom kitchen cabinet - $1,650MBR Bathroom Supply labour & material to install L3.5ft mirror storage cabinet with laminate finish - $560 Supply labour & material to install L3.5ft vanity with laminate finish - $560 Supply labour & material to install L3.5ft solid surface on vanity - FOCWindows & Grills (HDB Approved) Supply labour & material to install height 1.2m aluminium window grill for whole unit - $1,800 Supply labour & material to install sliding window at service yard - $650Painting Work Supply labour & material to paint whole premise using Nippon Paint (5 +1 colour) - $1,350Total: $30,760 (no gst) Your advise is greatly appreciated!!
×