Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

eR1c

Members
  • Content Count

    338
  • Joined

  • Last visited

Everything posted by eR1c

  1. think u have to rewire his circuitry to be always "on" lor...
  2. This is the typical asian chinese guy mentality lor... always that female cannot perform better than guy....
  3. eR1c

    My New Home

    Coz i was so upset yesterday that i go hard time sleeping.... Anyway, for the MBR toilet, the holes drilled is in between tiles, so maybe after taking the screws out, can cover up and still not so obvious, plus, by shifting the mirror down, hopefully, it can cover the previous holes. For the Water heater in the common toilet, the holes drill is on the tiles itself... My contractor promise to rectify the problem and i will go and see again lor... if the hole is not visible, i still ok with it, but if still can see the hole, i will ask them to replace those tiles lor.... sigh..... !! today, if got time, sure will rush down there to see see again....
  4. eR1c

    My New Home

    Next, i went to the common toilet, and again another problem. The instant water heater and the 2 way tap! They are in the wrong position!!! The water heater was supposed to be near the toilet windows! coz my toilet door will open towards left, so if the heater and tap is there, my door will surely hit it!! I told my contractor about this last sat when doing the electrical marking! How can this be wrong???? i was so upset. I quickly made a call to my contractor! Then i was told that there was no other tap liao... all taps have been used! But i remember wanted a normal lever basin tap for the common toilet. I called the Sanitary Shop and after going thru the invoice, found out that the tap was missed out in the invoice! That's why, when they install the taps, they cannot find other tap, so they just anyhow install the taps.... and that happened to be the wrong tap. I mean, they could have call me to verify with me! So i made an order for the lever basin tap and ask them to send to my contractor who will come down to replace the wrong taps!! And also the chrome water trap will be pass to them to replace as well. My Contractor also said will change the piping to chrome color lor.... And then the master bedroom toilet glass shelf and mirror..... They have to be shifted! The glass shelf and mirror are just tooo high becoz of the kitchen tap!! I told my contractor i want it to be lowered. and i dun want to see the previously drilled holes.... My contractor told me to marked out the height of the glass shelf and mirror on the wall and they will change the height. So i made the marking with masking tape. Hopefully, this shifting for mirror will cover the wrong holes for the glass shelf... Now the Common toilet water heater and the tap, my Contractor said will change the location to my new marking.. I was worried with the old holes.... but my contractor said i will not see the old holes lor... hopefully, there better be a way to cover it, else i will definitely ask them to change the tiles there... The toilet bowl for the common toilet was installed. and everything seems ok with it... This toilet bowl is the velin brand and came with a soft close design. Then i checked the Master Bedroom toilet water heater's water pressure. And i got a surprise. The water that came out from the shower head was **** weak!! I was wondering how come like this. Went to the common toilet and try the heater there.. The output was ok. I was trying to figure out why the master bedroom water toilet was so weak?... I try the taps in the master bedroom toilet and the water output was all ok. So i took out the shower head and see the water that came out from the hose, it seems ok... So i went to the common toilet, took out the shower head and installed it in the master bedroom toilet and viola, the water output was ok! This shows that the new shower head was not good, either the internal design sucks or something cloaked it!! I even took video clips of the different. Everything was oredi installed, so alternatives was to use the original shower head that came with the water heater. But i couldn't find it in the boxes in the living room. So i called my contractor and after he checked his office, it was not there either. I called the sanitary shop and they said they will send it together with the tap that i order tomorrow. Sigh.... this few problems really brings down my day.... Of all the things to install wrongly, it had to be in the toilets. I dun mind if it is in the wall, coz can just plastered and paint over easily, but toilets have wall tiles and once drilled, the hole is there liao, unless replace the tiles... Also, if they is any slight doubt, they should consult the owner before drilling anything mah... if not once drill wrongly, the damage it done and not easiy rectify lor.... So for those who are starting the renovation, please do let the ID/Contractor know that if they have any doubt about the placement of water heater or toilet accessories, to call u and verify first before drilling... else will be too late after u went to see.... The best will be to be there to over see the installation... sigh..............
  5. eR1c

    My New Home

    OKie... the photos of wat went wrong.... Lets start with Master Bedroom toilet. When i reached there and saw that everything was up except the toilet bowl which is outside, i was so happy. But going in to see, found that they have used the wrong tap on my basin!! That tap was supposed to be my Kitchen Sink Tap!!! and becoz they used this tap in here, due to the tap height, the glass shelf and mirror was push higher than normal. The glass shelf was oredi my chest level (i am 1.77m) and the mirror was also higher! i was like !!????!????!!, i quickly went to the common toilet and see.. and there it is, the tap that is meant for the master bedroom toilet was in the common toilet basin! i was like #@!*&^ liao.... Common sense will tell that the tap in the Master Bedroom basin is a kitchen sink tap, becoz it is too hight and also the tap can be swivel left and right. Went back to the Master bedroom toilet and found another problem! The piping and water trap of the basin was supposed to be chrome in color!! The Sanitary Wares shop that i purchase it said he will throw in the chrome water trap for free and also, he will inform Bobby about it so that they will use chrome piping! Common sense again will tell that this design should go with chrome piping and water trap mah!! if not, if looks **** ugly lor!!
  6. a 2mp camera, if blow up to 5R still ok, but blow up to 8R, will lose the sharpness liao... but it also depends on the printer... but there is still a limit to it...
  7. wow... the top 3 got people taken liao... hahaha so fast... look like another total makeover renovation.. kekeke
  8. eR1c

    My New Home

    its my mum command to have that.. hahaha but i find it useful too. at least i can still enjoy the cold air when raining and won't worry about getting the place wet... but the sliding window pane is smaller lor... well, things is not good today... felt so sianz.... a small part of the renovation is not good... will post the picture later after i edit it...
  9. eR1c

    My New Home

    The new windows. All sliding and with top hung panels Living Room Balcony Kitchen Common Toilet Master Bedroom Master Bedroom Toilet Mum's Room Study Room
  10. If the power is trip, then the TV will not have any pictures, not even sound lor... Unless it has something to do with SCV cable point... Check with the rest of the neighbours and ask them if they had the same happening or not? if yes hor, call the town councils lor.. dats wat they are paid for mah.
  11. seems like Singapore Features... kekeke
  12. eR1c

    My New Home

    Got my Hood & Hob from the same shop as i got my sanitary wares. The brand is Cuizino. Hood Hob Some of Hob features
  13. then we will help to call ambulance to whoever faint lor...
  14. eR1c

    My New Home

    yup, coz i dun like to keep running around to buy lor, and also the renovation is tight and plus i working, so dun have time to run around also..
  15. eR1c

    My New Home

    This are the sanitary wares that i bought at the supplier of my contractor.. Kitchen Sink (Length abt 52cm, Width abt 44cm, Depth abt 24cm) made from one piece of material, not wielded together, and with some anti-condensation coating underneath The sink tap to go with it i dun have the pics of the wc that i bought. the brand is Velin with delay close action. The master bedroom will be sky blue in color. The common toilet will be almond in color, which the basin is the same brand and same color. When i got the pics, will post it here. The basin tap for common toilet This is the basin for master bedroom, but instead of the green color bowl, it will be blue color glass bowl. kekeke. And the basin tap to go with it The mirror and glass shelf (for putting cups, toothbrush... etc) for both toilet. This is the Instant water heater that i have bought for both toilet. As the master bedroom toilet is blue, and the heater is white, i am going to spray the cover of the heater to blue color myself... kekeke And the shower spray for master bedroom toilet. Dun want to use the original spray coz it is white in color. The master bedroom toilet is blue and the accessories is chrome, and so, dun want white color in there lor.. so change to the chrome type. hahaha The common toilet will use the original spray, coz it is white in color. This is the 2 way tap for connecting to the water heater and a rubber hose. This is the 2 bidet spray i got for each toilet.
  16. eR1c

    My New Home

    The Balcony design... (day time) (nite time with flash) the pebble wash dun look dark, think becoz they haven't clean/wash up after the works yet...
  17. eR1c

    My New Home

    Wat is 'FIL'? When did ur reno started?? My schedule is abit tight, coz my current house also handling over around mid Aug lor... My buyer is not bantang and not in the rush, so even for them, ghost fest, they also can ****, My reno handover date is 21/07 and shifting in is set on 09/08 liao... that gives me around 3 weeks to get my furniture from IKEA, set it up, and also to slowly shift my boxes over... the day of official shifting will be the heavier stuffs, which i engage shifting companies to do. My Renovation Company also have ID services, but since i doing designing myself.. i engage them more as contractor. nevertheless, they are good at co-ordinating... Everyday, there is people working lor... Last Sat, they are doing the plastering and i also marked out the electrical points with my contractor and the electrician liao. Also the windows are changed and this week, they will start on the plumbing, sanitary wares installation, as well as running the electrical wirings liao... Also, the they have their own carpentry workshop opposite their office/showroom, my carpentry are also being done up simultaneously liao.. The stoneheage ar... hmmm... my guess is maybe to add weights to press the tiles firmly down? will have to ask my contractor about it liao... but polished tiles is slippery when wet lor... dangerous to have it in the toilet.. especially with old folks...
  18. hey, ur coffee table is from IKEA right? i saw it and will be getting the same too, but will be getting the black-brown color...
  19. eR1c

    My New Home

    Some more tilings photos... The master bedroom toilet is almost done liao.. all blue blue... kekeke The base for the washing machine, as well as a small base for the cabinet that will hide the rubbish chute.. The low wall which where my kitchen sink is and where behind is my washing machine..
  20. eR1c

    My New Home

    Hi snowpear, thanx. well. i would said that this is all thanks to my contractor, and also, resale house are given 1 month to do renovation only lor... (got this from HDB Website). But according to my contractor, those renovation part that requires lots of heavy knocking, heavy drilling..etc have to finish by 1 month... those small small stuffs, can do it after 1 month... as long dun do it at odd hours. My contractor is quite on schedule or even faster... but without compromising the work quality. That's why i choose them mah...
  21. eR1c

    My New Home

    More Tiling photos The kitchen wall tiles are also up liao... Master Bedroom Toilet Floor The area for my washing machine.. the base is not constructed yet. And my new rubbish chute... Common Toilet is almost done The design for my balcony The pebble wash that i have to choose.. One is mixed with cement, the other is some white cement or something like that.
  22. eR1c

    My New Home

    actually, i also dunno... hahaha never ask them when i was there....
  23. eR1c

    My New Home

    The Big Pile of Sands for mixing with cements... The tiling started... Nothing was done on the balcony yet, coz i have yet to do the design...
  24. eR1c

    My New Home

    becoz the house here is **** expensive lor... nope, i am not one of them.. mine current house is only 4 rm, 91sqm... cannot command such high price, further more, it face the sunrise and sunset. and i sold it before the craze went super craze... But the one dat sold at sky-high price is near my place... hahaha but at very high level... i took to the ideas of the rough tiles after going to my fren house, he had this rough tiles. cleaning is not a big problem, just have to put in more effort.. hahaha but it is not slippery when wet, that is my main concern, not good for old folks if too slippery. anyway, the tiles have been laid liao.. hahaha
×