Hi All, I just got my quotation from my ID,is these reasonable Preliminaries Application of MCST permit (Renovation deposit & non refundable fees to be borne by Owner) F.O.C Project weekly report including photo taken & project co-coordinating & supervision. F.O.C Designing: 2D floor plan layout, elevation & 3D perspective. F.O.C General Works To provide labour, tools and material: Site protection: cardboard & plastic sheet $400 Cleaning service for whole house $500 Ceiling Works To supply labour, tools and materials:- Plaster fiber board L box cornice light holder in dining and living hall $600 Plaster fiber board false ceiling in 9mm thickness for foyer area 80 sqft $400 Painting Works To supply labour, tools and materials:- Whole house Nippon/ICI emulsion painting include painting of store room door & frame and oil sealer. $1700 Carpentry Works To supply labour, tools and materials:- Top & bottom kitchen cabinet finishing in laminate c/w internal melamine ply, ABS trimming, soft closing hinges, stainless steel dish rack & ironmongery. 36ft $4680 Top: 5700mmL x 350mmD x 95OmmH. Bottom: 5100mmL x 600mmD x 850mmH 5100mmL x 600mmD x 20mm thickness Quartz worktop. 17ft $2210 1500mmL x 1000mmH storage cabinet cum settee finishing in laminate & PVC cushion. $1500 2100mmL x 2600mmH TV console cum feature wall finishing with in laminate. 7 ft $1800 2700mmL x 300mmD x 2600mmH display glass cabinet c/w ironmongery in bedroom 3 9ft $3150 1500mmL x 600mmD x 2600mmH wardrobe finishing in laminate c/w internal melamine ply, ABS trimming, soft closing hinges & ironmongery in bedroom 2. 5ft $1200 3300mmL x 600mmD x 2600mmH 'L' shape wardrobe finishing in laminate c/w internal melamine ply, ABS trimming, soft closing hinges & ironmongery. 11ft $2640 1800mmt x 75mmD x 1000mmH headboard finishing in PVC cushion. 6ft $1080 Air Con Works To supply labour, tools and materials: Dakin inverter system 1 to 2 c/w class 1 insulation & fire rated cable. Model: 4MKD75 (compressor) FTKD25 x 3 unit 9,000BTU (fan coil) FTKD35 x 1 unit 12,000BTLI (fan coil) $4600 Electrical Works To supply labour, tools and materials: Relocate of lighting points. $200 Lighting point in 1.5mm cable $200 Labour to install light fittings (light fittings by owner). $210 Glazing/Plumbing WorksTo supply labour, tools and materials: Ozcreen' tempered glass shower screen in 6ft height c/w swing door, handle & ironmongery in both bathrooms. 2 sets $1200 Connection of sink & tap with extension of stainless steel pipe & PVC oulet. $250 Total: $28,570 7% GST:$1999.90 Grand Total : $30,569