Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Peanut888

Members
  • Content Count

    70
  • Joined

  • Last visited

Everything posted by Peanut888

  1. See the number of defects (and these are the few of the many..). The BSC took about 3 weeks to rectify and there were still some small ones i chose to ignore..
  2. Went down to blum showroom today. Address below: Showroom S.E.A. #02-00 Ubi Biz-Hub 150 Ubi Avenue 4 SINGAPORE 408825 Was served by a lady called Caroline. A very experienced and nice lady! She took time to look through my carpentry drawings and advice me on the different fittings. Look for her there if you are interested in blum products!
  3. Hi snowdew, replied you at my thread using mobile but realised your post wasnt quoted. For the record i bought the 30in undermount single kraus sink. Havent open coz i need to settle other reno stuffs 1st. Anyway to help you and the rest of renotalk forumers here, here's the steps i took for free shipping to singapore (provided the promo is still valid) 1. Find the item and seive it out with amazon global eligible (make sure the item has this!! if not there is no foc shipping!) 2. purchase item on amazon 3. chat with the operator on the free shipping *remember to save chat log just in case* 4. give them maybe say 1-2days to process and follow up in case they forgot about it. If you are not able to get free shipping for whatever reasons, you can still cancel the order within that day. hope it helps any1 who is looking to purchase from amazon. Wanna thank me can treat me bubble tea~~
  4. Here is my quick review for the different IDs that i have met: 1. Studio Q: Recommended by a friend. Met a few times, ID was quite young, nice and accomdating.. Pricing wise is ID pricing lor.. BUT ID has left the firm! 2. English of 北西: Met the ID only once, recommended by a friend. He was generally friendly but... we couldnt stand his bad breath (not trying to be mean but even the spouse cannot tahan!). ID left out some stuffs i asked him to quote, not sure if he 4got or it was intentional. 3. Waiseng: Recommended by a friend. Met once. ID was young, nice.. Have ideas but personally to me, not experienced on potential problems. Pricing some average ID pricing and some high.. BUT ID has left the firm also.. 4. Exquisite: Recommended by a colleague. Pricing is ID pricing, but the ID is pretty experienced and took time to explain to us on the kitchen door as our wall is not in a straight line. Followed up with 2 calls, very friendly. I think i would have gone with them if we were engaging ID. Her name is nicol. (if any1 want to google) For those who wants the contact, please PM me. The rest of the IDs that we spoke at expo, i'm not too keen as they are generally sales pinch.
  5. Oh genesis89, i am engaging a contractor. And in fact, i dont think i'll be getting any 3D as the carpentry is a different contractor.. But i have done some raw layman drawing on the design and dimension of my kitchen. Will post it up soon. Meaning... i have engaged different ppls for different job scope. And i have no renovation experienced ah! So fingers cross! Hopefully everything turns out okay! After my renovation is more or less complete, i will post out the different contacts if they are good.
  6. oh dear! So did u pay a deposit to them? It's very infuriating how some IDs are like that! I have a few friends who warned me about signing package with IDs and paying them deposit, especially small reno companies that may collapse.. So i didnt sign with any.
  7. Hi snowdew, I bought the Kraus 30 inch Undermount Single Bowl and paid about s$530. You are getting it too?
  8. @kstoh: I no scanner.. Had the impression that I can get from Hdb.. Wasn't expecting it to be so... Not so direct. Yes! I will! I'm still waiting for the retification works to be completed.. Zzz I'll be posting my taobao lighting loots and my kraus kitchen sink once I have chance to open and check~~
  9. Thanks all for the warm welcome! My renovation haven't started but I'm experiencing some hiccups already. 1. Rectification works is still on going for 2nd week.. And going into 3rd week... 2. Floor plan: PE needed the floor plan in PDF and I only have the hard copy. Made 5-6 phone calls to HDB and finally 1 person managed to have me the simplest solution. Just pay $5 to get the PDF version online. 3. Last min one contractor at night inform me that they won't be taking up my project as my case is too SMALL when I have confirmed almost everything!! Even more gek sim as it is a friend. Those who wants to know which to avoid firm just PM me. But I won't post here coz I do not wish to break his rice bowl.. 4. Singpost (wat's new..) delayed the shipment of some of my lights for additional 3 weeks without a proper explanation. They claimed my parcel was damaged but we finally receive it, it was not. Pray hard the rest of the Reno will go smoothly! Po pi po pi
  10. For my budget, i aim to keep it below $25k for all reno works including electrical. wish me luck! Here's a list of what i need to get done: Kitchen white/cream granite top cabinet top and bottom on one side hacking of service yard build in oven in tall unit White powder coated window grills Sliding kitchen windows Clear tempered glass kitchen door (frameless) Living room Tv + computer console White powder coated window grills shoe rack beneath openet Install aircon sys 3 L box for whole of living and dining area 2 ceiling fans with light kit MBR + bed room Floor to ceiling cabinet, wall mount fan White powder coated window grills Toilet vanity set in both toilets mirror cabinet in both toilets shower curb in both toilet
  11. Peanut888

    3room floor plan

  12. Peanut888

    3rm floorplan

    From the album: 3room floor plan

    typical 3 room hdb bto floor plan
  13. Thanks to renotalk forum people and many bloggers to have posted their renovation adventure online, i have learnt so much over the past year and i would like to share my experience with you as i go along. Currently my unit is under going retification works since 5th may as there are alot to be done.. My theme is modern scandinavian theme.
  14. ah... icic. But my concern is how long will hdb take to approve. Mostly i read, PE is needed though.
  15. thanks @kangeroo168! Funny thing is different ppls tell me different things. Some tell me PE is not needed coz is non load bearing?? Some tell me that PE is necessary. So who is right?
  16. hi hi! Your layout looks very much like the one i have, except mine is 3 room and my kitchen is alot smaller. Where's ur location? I see you should have space for sink and hob and oven for one side. (oven in tall unit in about 600mm, hob abt 900mm, sink depending on you but i'm assuming 900mm) but the space between them will be small (approx 450mm). But if you choose to have the oven below the hob you will have more space! So it depends on what you want actually. Anyway, for space planning, i'm planning on 2 sides for my own coz my kitchen is only a pathetic 2.6m, can only fit sink and hob on one side and the oven on the other. hope it helps!
  17. hi! I'm a new owner of a new hdb, and i've seen some blogs regarding hacking of service yards. Just wondering if HDB approve this still? (or if any1 have been rejected by HDB) What will be the cost of hacking? Make good? TIA! [^_^]
×