Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

*magmag*

Members
  • Content Count

    51
  • Joined

  • Last visited

Everything posted by *magmag*

  1. Hi Mafiawife, thanks for yr compliments!!. I love my dry kitchen too, it's perfect for baking!! But i had to knock a room down to house the 3M dining table
  2. Bedroom walkway Bedroom Toilet My Precious Moments
  3. Bedroom walkway Bedroom Toilet My Precious Moments
  4. Hi, the renovation cost is about 80K, this is apart from the design fee riston quote. Kindly check it with him as every individual home differs. Hi Junkay! yes, thats actually roman blinds.. It's for my hubby projector as he wants the house to be pitch dark when he watches his projector in the day... Mine wet kitchen is using tiles. Only the dry kitchen has the rubber laminates. Some long overdue photos... My neater bedroom the wall clock Hubby's corner My corner Bedroom TV
  5. The prices is ridiculous!! The electrical quote is 6800, which is crazy!! i had my place hack totally and rewire with lots of point for about 4K which i thot was very expensive! The tiles laying is also crazy, it comes to about 15K gosh... Do u mind PM-ing who is this crazy contractor that quoted u?
  6. Hi, thanks! Yes, it's painted by white emulsion by brush.. but due to the high absorbing ability of the hollow block, the painter had to paint at at 7-8 times before the color is even. Even so, 1 mth after painting, he did another touchup. Yes, the tiles are from China, it's 800 X 800 and if i remember correctly, it's abt $3.20 from SBH. But this are all decided by my ID and the exact cost i do not know. The dry kitchen are rubber tiles, it;s brown in color, am not sure where my ID got them from.
  7. Bonsai compliments from my god-father The dining n gallery area My bedroom(keke, lazy to tidy) My shoe racks but not enough My Kitchen Alrighty, thats all for now.. the house is in a huge mess now as we are re-packing for the new year.. Storage spaces are running out! Shall update with nice photos... Happy New Year Everyone.
  8. Hi, i didnt paint my fridge, this is the Original color.. Oh ya.. i have the same problem too.. i just leave it to cold and turn the top node to 2-3
  9. Havent been updating for a long time.. some pics... TV Console n Feature Wall Sofa & Coffee Table Dry Kitchen FRidge + Wine Chiller Study Room
  10. Hi all! Thanks for yr nice compliments. We are delighted that the house turn out well!
  11. Hi,it's almost done with some defects to rectify. I got no idea is the wallpaper from goodrich but those wallpaper installer will from goodrich.. It's Clipsal the C-Metro 3000 series. Yes, sure, will update again when everything is up...
  12. Hi all, sorry for the long delay... we were travelling almost the whole mth of Nov... Alrighty, the hse is finally abt 95% done with some minor touch up and some caparentary we did some last min changes. View of dry kitchen and living room
  13. Hi JUnkay, if it does appear, shall post it up to share... That's 1 of the consideration me n my hubby had before renovating the hse... And we concluded that within 5-10 yrs chances of moving is not high.. Reason being, my PIL stays upstairs of me and my parents staying a few blks away.. Unless the 3 families all move together, else chances not high that we will move.. Our parents been staying at their current flat for like 25 yrs. The renovation works is soooooooo slow.. contractors are all so busy.... project has been delay for like 8 weeks!! eeks, gave them a final deadline, 18.11.07 must hand over!!
  14. hi, 110k is including all the furnitures, electricals, gagdets etc etc... as mine is a resale flat, the condition is pretty bad... so have to redo everyhtning.... thats y the high cost...
  15. I took some pics but pls pardon the mess... Living Room whole view Wet & Dry Kitchen Wet Kitchen Study Room Masterbed room waredrobe (walk way to Toliet) Waredrobe outside toliet MBR Toliet the hole in the feature wall = TV console Bench along the window (covered with canvas)
  16. Thanks! My ID Is Whiz Concept - Riston Foo. haha, to paint yr room yrself is not a easy task. Conceptually and actual painting might differ alot.
  17. Hi, now at carpentary stage and whole house in a mess, once they finish the carpentary shall update more pics... Thats my TV console..
  18. Hi gingerbread, u got a very nice hse.. We went to Gplan to look for Kelvin too but too bad he was very busy so didnt go ahead with him.. Urs will turn out very well!
  19. Wow! The 3Ds sooo nice! Your MBR is very very big!
  20. Some pics... Living room Masterbed room MBR Toliet Study Room
  21. Yup, that's the study. From the main entrance when we enter, when we look to the right we can look all the way to the kitchen.
  22. Some updates... At the very last min, we change our cement screed to be floor tiles as there were no stock of the white cement and it would need 6 weeks arrive. As we do not want to wait longer, we decide to go for 800 X 800 homogenous white tiles. It will take another 3 weeks or so for the hse to be ready. Shall post some photos when the floor's up!
  23. Hi, welcome to renotalk! Realise we have the same black leather alike looking tiles. It's a very good choice! turn out to be very nice in my guest toliet!
×