Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

shannie

Members
  • Content Count

    23
  • Joined

  • Last visited

Everything posted by shannie

  1. Left side of kitchen Walkway MBR toilet MBR wardrobe Hubby is currently away on biz trip, will share after we take more photos this weekend!
  2. Didn't have time to update t-blog regularly. Reno is almost completed! Really happy to see everything come together.. It looks and feels more like a home now. We haven't shop for appliances and furniture yet. Some photos to share... Divider at the entrance Shoe cabinet Kitchen door
  3. Thanks for the advice! I just assumed they will send me photo updates of the progress but none so far. Now I know it is not the norm. We try to visit the house on one weekday but can only see what has been done but not check on workmanship as the house is in total darkness. Haha.
  4. ID just informed us that they will be doing the carpentry measurements tomorrow and ask us to confirm no further changes required. Asked for revised 3D drawings and they will only send them to me tonight. So far works have been ongoing and we have not received any progress updates from our ID at all, is this the norm? Reno is moving too fast too furious and we are not even aware of what is happening as we can only visit the site on weekends.
  5. Visited the site today. Here are some photos of the progress so far. The photos aren't very clear as it was taken by my hubby's phone camera. Our brick wall! Bases for kitchen cabinets Common bathroom overlay Master bathroom - preparing for overlay
  6. Thanks! Our wardrobe and bed will be placed against the 4445mm wall, have to compromise wardrobe space as we didn't want to hack any walls.
  7. Reno works to be done Living room Overlay floor with HERF Craftbrick wall Full height divider Full height shoe cabinet Kitchen Overlay floor with HERF Tall unit for built-in microwave & oven 1 top mount cabinet 2 floor standing cabinets with Kompacplus worktop Clear glass swing door with solid wood frame Common Bathroom Overlay wall tiles Framed mirror in laminate finish Aluminium louvre bi-fold door Master Bathroom Overlay wall tiles Fixed shower panel Framed mirror in laminate finish Vanity cabinet with solid top Aluminium louvre bi-fold door Master Bedroom Full height casement door wardrobe Chest of drawers with pigeon holes & clear glass top Mirror above the drawers Solid nyatoh door Common Bedrooms Full height casement door wardrobe Solid nyatoh doors
  8. Hi all, Have been hesitating and finally decided to start a t-blog to document our first renovation journey. We collected our keys back in April 2014 and spent 3 months meeting close to 10 IDs/contractor. We confirmed the last ID we met as we were too tired of the process and we thought they have the qualities and experience that we needed. We confirmed our ID on 13 July and works officially started on 1 Sep. Here's our floor plan. It is a 4-room premium BTO in the north east.
  9. Your completed home looks great! Waiting for you to reveal your ID. Sounds pretty much like mine. That is why I'm hesitating if I should start a T-blog.
  10. May I ask how much you spent on your electrical works? Thanks!
  11. May I know where you got your dining light? If it is from TB, can share link? Many thanks!
  12. Sorry to ride on this thread. May I know how to get free shipping for the Kraus sink?
  13. is your tv console laminated or just raw plywood? are the edges sharp?
  14. Hi, may I know if you engage Krono directly or through your ID? Can I have the contact pls? Thanks!
  15. Hi, could you please PM me the contacts of your contractor / ID firm? Thanks!
  16. Hi there, I tried to PM you but your mailbox is full. Could you please send me your reno quote from Mr K for reference? My email is simplyshannie@yahoo.com Many thanks!
  17. Hi g0mug0mu, can you please email me your quote from 3D Conceptwerke for reference? Collecting my keys soon and I've shortlisted them as well. Thanks!! simplyshannie@yahoo.com
×