Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Xiej0007

Members
  • Content Count

    357
  • Joined

  • Last visited

Everything posted by Xiej0007

  1. Xiej0007

    1

  2. Hopefully this will prevent leaking. My wife is quite worried about building carpentry over the trunks. Thanks!
  3. The aircons system 4 costs 3.9k, is part of the quotation from ID. Think if u get from mega discount store, around same price Our house fixed the aircons first then paint. Cos need to do false ceiling and also paint the trunking You gg to coordinate the subcons yourself?
  4. Meet up with ID just now at my house downstairs from 9pm plus till 10pm plus. Didn't want to discuss at my house cos preferred to have a controlled discussion without too many opinions from my family. Then we realized that there is no table downstairs, so we just place the laptop and material at the small bench, squatted down infront of it and discussed. Haha... Finalized the kitchen carpentry laminate and the configuration. Didn't know that the discussion will take one hour plus. Was surprised that time can pass so fast. The ID also advised us not to get the toilet accessories package as the outer layer can peel off quite easily. Just spend more on toilet accessories to get decent stainless steel stuff. Seems like everything is finalized and the ID can just proceed to finish most of the work. Thumbz up!
  5. The aircon is done within half a day. Quite fast! The aircon in living room Connect to bedroom 1 Bedroom 2 Connection to MBR MBR trunking to outside. The common bedrooms carpentry will be built to cover the aircon trunking. Finger crossed that there wont be leaking within next 15 years.
  6. Xiej0007

    5

  7. Xiej0007

    4

  8. Xiej0007

    3

  9. Xiej0007

    2

  10. Xiej0007

    1

  11. I just pmed you the ID contact. Will be so cool to hang own painting.
  12. Bought 2 items from taobao 2 days back. Hopefully it will come in one piece 1. http://detail.tmall.com/item.htm?id=14473749844 2. http://detail.tmall.com/item.htm?id=38031578224&ali_refid=a3_420434_1006:1109124379:6:%B5%C6%BE%DF:64675b2e764831e2d49005565a1569cc&ali_trackid=1_64675b2e764831e2d49005565a1569cc&spm=a230r.1.17.35.KYw095
  13. The set above is based on promo price of 1505 inclusive of the 55 bucks delivery charge
  14. Think it is more as buying an xin. Realized that in another two units of my friends' houses, they didn't use concrete base and the sink and stove area still working fine after 10 plus years
  15. It cost us around 900 to top up to make that cement support. Don't know if that is expensive.
  16. Hi Songz, Sadly we are not. Trying to save money. Anyway, we're glad the bathroom tiles are dark in colour.
  17. The kitchen halfwall has been smoothened Ledge for common bathroom Ledge for MBR bathroom
  18. Went up just now around 8pm plus to check on the work progress. Sink and stove surface are up!
×