Xiej0007
Members-
Content Count
357 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by Xiej0007
-
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
No problem. for my quotation, it is foc, It just states "included" It is under demolition and wetwork category, same category for fridge and washing machine base Hope above will help -
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
Haulage and disposal fee is stated as "included" in my quotation. Think it is not really fair to do a like for like comparison for the items individually. Maybe u can look at the quotation as a whole. -
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
Hi stitch85, creation of these bases are included in the quotation. The quotation doesn't have a separate costing for tiles of these bases. However the ID didn't request for additional money for tiles. -
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
False ceiling is halfway done! And kitchen window grills are up. -
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
Pmed! -
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
Met up with ID at our place to finalize the paintings for the house. After that he gave us a ride back home. So shiok! Haha The fridge base tiling is done! The tiling for the MBR toilet edge After the kerb is constructed at both toilets, we realized that the common toilet has a ponding issue. So asked the ID to drill a small opening at the kerb to allow the water to flow to the drainage hole. Like the kitchen, the tiler also sealed the entrance to the toilet. Coming week, the false ceiling will be up follow by painting. -
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
The smooth progress is mainly cos of seeing your T-blog and you introducing the ID to us. Thanks again. For your reno, at least everything is quite smooth and goes well. How's your furnishing going? That's another exciting part cos it will really add character to the place. -
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
Went to see tonight in anticipation. The tiles are up and we are pretty satisfied. Heng ar, things turn out well. Thanks to the tiler. Haha The false ceiling materials are here! So far things are keep moving. Shiok! -
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
Met up with tiler today as he wants to brief me on the issue of placing the wood-alike tiles in the "gong" style (Stairs/step style) As the "plank" has a curve profile (the edge near the ends are thinner while the middle portion is thicker), if he place it in the "gong" style, there may be a risk of the planks being uneven. Furthermore, the floor of the kitchen has a slight gradient to assist the drainage of water, therefore the floor itself is not level. As a demo, he placed the planks on the living room floor and the unevenness is not so prominent. Having seen his workmanship in the living room, and he gives me a gut feel that he's meticulous, I decided to take the risk and ask him to go ahead. Today the tiler just remove the previous tiling work on the washing machine/fridge base/skirting and also apply the glue on the floor. Tmr he will finish the overlay. Will see how it turn out tmr.