Xiej0007
Members-
Content Count
357 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by Xiej0007
-
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
Hi ecolour11, The LAN provided by Developers within the wall should be cat 6. Information is taken from the link below https://www.ida.gov.sg/About-Us/Newsroom/Media-Releases/2013/Code-of-Practice-for-Info-communication-Facilities-in-Buildings -
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
It didn't cost us extra to do that. I think the ID was going to do the U-turn anyway. And no worries about the hijack! We're here to share in renotalk. -
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
Hi blackie, Yup we are doing U-turn for the gas piping. Gas piping will be hidden behind the cabinets cos we don't want gas pipes behind the refrigerator so ID suggested to do U-turn and this allows the gas pipes to be hidden. -
Possible to pm me the curtain contacts too? Gonna start looking for curtains. thanks
-
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
Pmed -
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
Pmed -
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
Went up to see see look look tonight. Pleasant surprise that the glass panel and shower screen are up. Felt that our half wall abit low. But we insisted on it, so the responsibility lies on us. Feels abit like fish tank. Lol. Overall, we still quite like our half wall with the glass. Upz. The parquet is done. Skirting almost done. Left the lighting, study platform, tv console, and carpentry -
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
Hi singamas, pmed -
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
Pmed -
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
Bedroom 2: Cool Mint MBR: Putty (Main Wall)/ Maldives Sand (False Ceiling) Parquet material is here! Next week will be able to see the bedroom flooring get done! Shiok -
Our Yishun Greenwalk 5-Room Simple Simple Reno Journey
Xiej0007 replied to Xiej0007's topic in Reno t-Blog Chat
False ceiling and painting done! So far we are quite satisfied with the false ceiling and painting. The only thing we are abit apprehensive is that the living room main wall colour looks too white even though it is off-white brown. However we decided to stick to it as there is no better alternative colour and that the furniture which are mainly darker in colour tone will balance the whole feel. Let the pictures do the talking! Painting for the whole house Living room: Swansdown (Main wall and ceiling)/ Oyster Grey (False Ceiling) Bedroom 1: Ivory