Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

lookaround

Members
  • Content Count

    266
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by lookaround

  1. lookaround

    lvrm1

    From the album: Budget Home

  2. Day 2(Sat) reno pictures, went back to the flat to meet electrician and id to finalize the materials and dicuss about the electrical works. Also did receive the 1st draft of the 3d drawings. As per the work schedule, today is basically wet works, nothing much to update. Took a few snaps of the house reno when the workers went for their lunch break. Bathroom Pic Service yard Kitchen wetworks Before we left, a group of workers delivered the materials for building our partition. Day 3 (Mon) - Aircon installation SO took leave to coordinate with the id on aircon installation. Meanwhile also took some pics of the state of our reno Kitchen wetworks Service yard wetworks seems to have completed. Arrival of our aircon Day 4 - Vesak Day PH (No progress)
  3. lookaround

    IMG 2925

    From the album: Budget Home

  4. lookaround

    IMG 2924

    From the album: Budget Home

  5. lookaround

    IMG 2923

    From the album: Budget Home

  6. lookaround

    IMG 2915

    From the album: Budget Home

  7. lookaround

    IMG 2913

    From the album: Budget Home

  8. lookaround

    IMG 2912

    From the album: Budget Home

  9. lookaround

    IMG 2842

    From the album: Budget Home

  10. lookaround

    IMG 2830

    From the album: Budget Home

  11. Not sure what sort of freelance if u are looking for ? Those that are doing on a adhoc project basis or as a job. But to share with my experience, I was quoted abt 3 k by a freelance id for services which will be on top of whatever charges his contractor charges.
  12. Will share all mine ID/Contractor reviews in another post once i have the time. Anyway to cut the story short, after the signing of the contract, our ID arranged for work to be done on last friday. Thus, decided to make surprise visit to the flat to view the progress. Day 1 Attached are the work that have been done on the 1st day of the renovation. Basically the entire flat has been wrapped with corrugulated paper. The delivery of sand and hdb tiles already arrived on that same day. Kitchen Living room with some offering Bedroom Bedroom Bedroom What can i do with the remaining bundle of corruglated paper ?
  13. lookaround

    Store room

    From the album: Budget Home

  14. lookaround

    IMG 2906

    From the album: Budget Home

  15. lookaround

    Toilet 1

    From the album: Budget Home

  16. lookaround

    BR 2

    From the album: Budget Home

  17. lookaround

    BR 1

    From the album: Budget Home

  18. lookaround

    Main BR

    From the album: Budget Home

  19. lookaround

    Kitchen & Service Yard

    From the album: Budget Home

  20. Hi Songz, This is the floorplan of the flat and it is about 90sqm. Hi 11finger, i check for defects on my own as i actually took about half a year searching and confirming my ID after i collected the keys.
  21. lookaround

    4 Room Apartment

    From the album: Budget Home

  22. Somehow not able to logged on to renotalk for the last few days. Anyway reno works have begun and the cost for haulage disposal is $600. Breakdown as below. Haulage fees $350 Lay Corrugulated paper to entire flat $50 Purchase of additional tiles for service yard and kitchen 200. Total cost of renovation=13700++ (currently still negotitating on the final electrical works that could potentially be a low 200 or additional 600)
  23. Comparing your quote with my quote, your item 5-7 seems much expensive then what i was quoted for. i was quote about 110 for item 5, 90 for relocation of CAT 6 network point and 40 for installation of cooking hood point
  24. Hi, i believe your renovator will bill you accordingly to what Town Council charges until some ID/contractor who will charge a premium amount. http://www.hdb.gov.sg/fi10/fi10324p.nsf/w/HomeRenoRemoval?OpenDocument
  25. Got my keys in late Dec 2013 and finally after months and months, weeks and weeks of meeting IDs, contractors of all shapes and kinds. When most of the neighbours in the same estate have already moved in.(Sometimes, do feel abit awkward when the neighbours have already moved in for months and we are at still at the prospecting stage of the renovation, meeting IDs,contractor at our flat for dicussion.) After countless of meeting, we finally managed to commission a ID to do up our BTO flat and the works will be starting on friday. Our ID have also drafted a plan for the delivery of the work. Friday- Haulage work Saturday-Tiling and meeting the electrician (Will consider to get my contact if the price is too steep). Monday-Build partition, Aircon installation, Aluminium work measurement Tuesday - Vesak Day(No work) Wednesday - Electrical work, Glass works measurement Thursday - Painting of flat Friday - Painting of flat Saturday - Painting of flat( Delivery of items required for renovation items, lights, storage heater,kitchen sink,tap,mini spray, spray valve, miscellaneous accessories, cooker hood and hob ) Monday - Lights installations
×