Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

kelsam

Members
  • Content Count

    51
  • Joined

  • Last visited

Everything posted by kelsam

  1. Plumber and electrician are guys doing for industrial/factories. For plumbing, i paid about 500 for materials, already planned for him how to run the pipes etc, paid him 500 for 1 days work. electrician about 400 for materials, 200 per day for 3 days work.
  2. they heat up very evenly. I experiment with cooking quite frequently
  3. mmm how to explain. I went through about 12 id around sg. Some better known ones some not so popular ones. All went exactly same specs except kitchen (original idea was a very simple kitchen) I have a total budget of about 80k for this reno. Without appliances and the modular wardrobes, the quotes ranges from 55k to 80k, as there is quite a fair bit of work to be done. Bear in mind its all the same design specified by me. I already know what i want. Everything was hacked away including windows and doors + door frames. I did it all the above including a much upgraded kitchen at about 40k including wardrobe. breakdown in costs as follows : Approximate costs Hacking, tiling, plastering of walls : $15k Kitchen $11k wardrobe $6k Pipping $1500 Electricity $1000 toilet doors : $700 windows : $2800 doors : $3000 +/- about 40k but i get a much better kitchen and wardrobe system So balance budget goes into buy better things I am strong believer of paying for what the family uses often.
  4. Sorry was busy for the last few weeks will update more once settled down
  5. Save on id so can spend more on stuffs we use..really don't see a point in id for hdb
  6. Hehe ordered these reaching me on Friday http://www.amazon.com/gp/product/B00005AL1P/ref=oh_details_o00_s00_i00?ie=UTF8&psc=1 http://www.amazon.com/gp/product/B00005AL1E/ref=oh_details_o00_s00_i01?ie=UTF8&psc=1 http://www.amazon.com/gp/product/B00005AL7U/ref=oh_details_o00_s00_i02?ie=UTF8&psc=1
  7. Kitchen wise look for fam at opsh..young chap. His carpenter workman ship is good
  8. Final payment for contractor today..nice guy saw me drill some wrong holes n I patched with plaster and one corner I chipped it with heavy tools..say sharp later cut kids..changing tiles for me foc after cny
  9. cable tubing can ask your electrician, pipe can just tell ur plumber u want copper pipes instead of stainless steel, but cost more though.
  10. sorry they are not keen to do single units
  11. i got it from here http://trade.taobao.com/trade/detail/tradeSnap.htm?spm=a1z09.2.9.8.3AJlRL&tradeID=445272127952406
  12. system wardrobe have been installed
  13. Hi sorry for late reply was extremely busy last 2 weeks i realised i mixed up the door prices room doors are $300 each, main door is fire rated at $800 getting the guy to fix door is about 100 per door locks and handle about total $150 forgot name of name of company need to find invoice need to self laquer though finished product of my ugly painting need to do some touching up lol
  14. Got them from hk..they have nice household stuffs
  15. love my doors..very solid feel going to paint the frame dark brown, sand the door smooth and apply clear lacquer
  16. gas pipe and heater installation kinda like the raw copper look leaving it unpainted
×