Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

J0ANN3

Members
  • Content Count

    60
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by J0ANN3

  1. This is the proposed design: We changed quite a lot due to budget and because I love to do research myself and combine everything that I like. I depend a lot on my ID in regards to whether it is workable and whether the colour or design matches whether the price is within my budget, time planning, coordination, etc. In fact, other than looking for my own designs, I depend every other things on him because I trust him. I don't know why but I just do.
  2. J0ANN3

    master bedroom3

    From the album: JOANNE's Photos

  3. J0ANN3

    master bedroom2

    From the album: JOANNE's Photos

  4. J0ANN3

    master toilet

    From the album: JOANNE's Photos

  5. J0ANN3

    master bedroom1

    From the album: JOANNE's Photos

  6. J0ANN3

    kitchen1

    From the album: JOANNE's Photos

  7. J0ANN3

    dining area

    From the album: JOANNE's Photos

  8. To start off, we have come a long way since getting ROMed in February 2013, my spouse applying for PR in April 2013, held our Customary Wedding in KL and then a dinner in Singapore for my family and friends during August - September 2013 and finally, PR approved in November 2013. We started looking out for resale 4-Rm HDB around Punggol/Sengkang area initially during October 2013 but unfortunately, our budget does not allow us to do so. In the end, we settled for a resale 4A HDB in Woodlands/Admiralty (near 888 Plaza) during November 2013 which is within our budget and considering the fact that there will be future developments that might increase the estate's value. Upon completion in February 2014, we went in search for our ID. To our dismay, none of them fits the bill within our budget and comfort. Our main concern is our renovation loan. Finally in April 2014, our renovation loan got approved! We confirmed our ID and gave the green light to start our renovation immediately. We believes in a Chinese sayings "Man Gong Chu Xi Huo" which means something like slow and steady works produce good workmanship. Thus, we told our ID that we are in no hurry to move in as we can still live off my mum. LOL! Below is my Floor Plan. Our Renovation works:- Living Room Hack Floor Tiles Lay Homogeneous tiles Construct TV feature wall Construct L-BoxDining Room Hack Floor tiles Lay Homogeneous Floor Tiles Construct Dining Mirror with feature wall and lights Construct False CeilingKitchen Hack Floor Tiles and concrete cabinets/ Dismantle Built in Cabinets Lay Homogeneous Floor Tiles Plastering over Wall Tiles Construct Built in Kitchen Cabinet and Island Install Glass panel backing in between Kitchen Cabinets / accessories Hack Kitchen/Dining Wall and construct full height Sliding Glass Door Construct Fridge base Common Toilet Seal Opening to Kitchen and hack toilet wall to recreate new opening to Service Yard Hack Floor/Wall Tiles/Old Toilet bowl & Basin Lay Floor and Wall Tiles Install Toilet Bowl/ Basin / AccessoriesService Yard Hack Floor Tiles Lay Floor Tiles Construct Washer cement baseMaster Bedroom Overlay HERF Flooring / Dismantle Wardrobe & Storage under Window Construct Built in Wardrobe 6 Ft Construct Study Table Construct Storage under window Construct L-BoxMaster Bedroom Toilet Hack Wall and Floor Tiles / Old Toilet bowl / old Vanity Lay Homogeneous Floor and Wall Tiles Construct Vanity with mirror and lights Install Toilet bowl, basin, accessoriesCommon Bedroom 1 Overlay HERF FlooringCommon Bedroom 2 Overlay HERF FlooringStoreroom Hack Floor Tiles Lay Homogeneous Floor TilesThis is the proposed Layout less out the shoe cabinet due to our budget.
  9. J0ANN3

    Proposed Floor Plan

    From the album: JOANNE's Photos

  10. J0ANN3

    Floor Plan

    From the album: JOANNE's Photos

×