linakua
Members-
Content Count
75 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by linakua
-
Nothing happen on Day 3. Day 4 - installation of my Aircon from Gain City!! Aircon **** Room We choose to run the trunking along the passageway for the ease of future maintenance. Aircon at Bedroom 3 Air con at Bedroom 2 - Kids bedroom And finally air con at MBR. See the vertical trunking? Going to get Gain city guys to modified it. It is ugly Beside this vertical trunking, I am impressed by the workmanship!!
-
Day 2 - Start of Electrical Work. They are fast, complete all electrical work within 1 day with only 1 electrician. I am quite impressed!!
-
Ya, Its a "premium" BTO. Alots of defects, if we do not close 1 eye, shut 1 eye, the rectification will just goes on and on.... LOL.
-
Day 1 - nothing Done.... just layed the protection cardboard before electrical work start
-
Really a small nest to work on Living Room http://renotalk.com/forum/uploads/gallery_56494_161_33288.jpg MBR Bedroom 2 Bedroom 3
-
a bit confuse on how to upload photo.... bigger photo
-
Collected my key actually early Aug 2013, and due to ghost month, And I tot we can start our renovation early Sept 2013. BUT, my darling ID was being called back to serve our country for 3 weeks, and so while waiting for my ID to release from his "jail term", we rectify defects slowly, and finally we start our reno only on 1st Oct. It is a simple BTO 4 rooms flat, big enough to build a comfortable nest for my 2 little monsters and my old doggy.... Hmmm.... because both me and my hubby have no design sense.... so we rely on our ID for the design. This is the floorplan