

ekrose
Members-
Content Count
17 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by ekrose
-
The clear glass used to be the door entrance to my master bedroom but I have hacked down the door and replaced it to be a display area. Kitchen: Decided not to do top shelves for the kitchen cabinets on the both sides as didnt want to make the kitchen feel too cramp. Dunno if will regret cos u can never have too much storage space!
-
Some pics of the house. Shoe cabinet: Entrance of the house: Bedroom 2 (when laminates were installed) Study + Masterbedroom (with the wall hacked) Masterbedroom
-
Hi! sorry for the delay. My com was down so didnt had the chance to update the blog. The tiles are homogenous and the price quoted was around $3.20. Hope this helps.
-
Tiles are up: Living Room Hallway Skirting in progress: Wanted to choose even whiter tiles, but due to budget constraint had to choose these. Nevertheless, my fhb thought these were quite white already.....
-
nope...but i guess its due to the design of the architects who designed the building... Maybe they felt it is nicer... Btw, really like the design of your house! Your home is very nice!
-
Thanks!Yup. combining the MBR and BR3 to have the WIW as i wanted to have one....the MBR is not big enough to have the WIW, so had to hack down the wall. -------------------------------------- ID: Fuse Concept (Jacqueline Ek) Our Humble Abode : Tanglin Halt
-
Just to share with you some pics that we've taken during the reno process... Doorway (before): In progress: Bedroom 2 to be converted to study (before): In progress (wall hacked): Master bedroom (in progress): Kitchen (in progress): Bedrooms' ugly ledge to be boxed-up: Cant see any purpose for the ledge to be 45 degree sloping......
-
Not doin TV console. Decided to buy off the rack to keep costs down as recommended by my id
-
hi, i'm from blk 91. how about u?
-
Here are some 3D pics: Study room + wardrobe: Master Bedroom: Kitchen: Shoe Cabinet: Hihi started work in end oct already.. still in the midst of the renovation.. now 3/4 done.. hee.. Have done up the layout using floorplanner.com. Found it quite useful when trying to come up with the layout. http://www.floorplanner.com/
-
Hi all, I have received the keys to my new Home at Tanglin Halt and have finally decided to join in the fun and start a blog of our new 4rm flat at Tanglin Halt (Commonwealth). I will be doing a modern concept for our home. Below is our floor plan. -------------------------------------- ID: Fuse Concept (Jacquline Ek) Our Humble Abode : Tanglin Halt
-
Has anyone bought recently from them? Thinking of getting their furniture as i quite like what they displayed at the fair at expo 2 weeks ago....
-
Hi Cantona, ya, i've got 3 quotations so far.. but one is way above my budget, and the other budget seems ok.. but felt tt the id was not really gd... design wise not really practical.... am waiting for another quotation from another id but till now still no news from him... will call him again to ask for quotation... as for the one who quoted me the quotation in this post... he seems to be able to 'click' with us and understands what we want in the designs... n he seems quite earnest n sincere n knows what he is doing... i havent sign the contract with him yet..as in the official one.. but i've paid a deposit of 200 for his 3-d drawings though.. i paid the deposit at one of those fairs at expo,... cos got promotion package... i still havent meet him for further discussion on the materials n cost, but guess if he's still not really upfront with the materials, i am prepared to forefeit the deposit and find another whos better... actually i hope to sign up before the gst hike... so i paid the deposit first.. but out of the 3 ids i've talked to.. this one seems to be the 'right' person... sigh..
-
Hi applefreak & devilaz.. thanks for your comments/advice... hmm.. most of the things you guys commented.. my id did not really specify them... as for the laminated flooring.. he said tt he'll be using his own company's laminated flooring.. he showed the sample to me when i met him for appointment the other time.. the name is alsapan flooring..do u know of this brand? is it good? if i remember correctly, the price quoted on the sample is somewhere ard $6.50... i guess tt's the price of the laminated flooring? but he did not tell me the price of the homogenous tiles and i had forgotten to ask him.. i'll ask him the next time though.. as for the paints, i was told there will be 3 coats (excluding the base)... hmm... guess my quotation is still v vague.. and there are still a lot of things that i needa to ask him about.. Thanks for your advices!
-
hi, sorry I am new to this forum, hence I need all of your advice/comments on my quotation. Below is my quotation for a new 4 room HDB. Please help me see if my quote is reasonable and what other stuffs are needed but are left out in this quote.. Thanks a lot for your help! Really appreciate it. Quotation: A Masonry Works 1 Supply & lay heavy duty homogeneous flooring @ living, dining hall with skirting 2 Supply & lay heavy duty homogeneous flooring @ household shelter area 3 Supply & lay laminated flooring for all bedrooms with skirting 4 Construct Cabinet, fridge and washing machine base 5 Construct shower kerbs at both bathrooms B Ceiling Works 1 Supply & install L-box cornices ****/Dining 2 Supply & install false ceiling at passageway C Carpentry Works 1 Design and Fabricate 20ft top + bottom kitchen cabinet by using postform doors 2 Design and fabricate 10ft solid surface worktop 3 Provide designer handles, double layer drainage tray and cutlery tray 4 Provide 1 pair of clear/sand blast glass panel D Plumbing Works 1 Extend copper piping for new kitchen sink area 2 Extend copper piping for new washing machine area 3 Connect inlet & outlet pipe for sink & washing machine 4 Install 1 no. of storage heater (provided by owner) 5 Install 2 sets of bathroom accessories (provided by owner) E Painting Works 1 Painting of walls and ceilings for whole house by using ICI paints F Misc: 1 Provide acid washing 2 Provide floor protection cardboard $ 12,888.00 G Additional Works 1 To supply & install 1 nos 7ft tv console by using selected laminated finishing $ 840.00 2 To supply and install 4ft kitchen cabinet by using selected laminated finishing $ 460.00 3 To supply and install 1 nos dining table by using selected laminated finishing $ 1277.00 4 To top-up 5ft wardrobe by using selected laminated flooring $ 1250.00 5 To supply and install 1 nos shower screen to master bedroom $ 600.00 H Discounted items/Free gifts 1 To supply and install 5ft wardrobe by using laminated finishing c/w 1 set of 3 tier drawers F.O.C. 2 To supply and install 2nos smart drawers (with glass panels) to wardrobe F.O.C. 3 To supply and install lock(s) to wardrobe F.O.C. 4 To supply and install 1 nos pull out mirror to wardrobe F.O.C. 5 To up-grade cabinets hinges to Irex hinge F.O.C 6 To supply and install Toshiba system 3 air-con F.O.C Total Package Cost: $17,315.00 (w/out GST) $ 18,180.75 (with GST)