Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

gui99

Members
  • Content Count

    136
  • Joined

  • Last visited

Everything posted by gui99

  1. thanks for the pics meowie49. The pictures are really nice... think i will try to sneak in also in the next visit to TPY....hehe
  2. sianzzzz...mine still Q1/2008... I am keeping my finger cross too... hopefully can get earlier... Mine is quite near to the block A side one..
  3. wow that's very good news!! hopefullly it will be our turns soon. just saw block A from amk here.... think the crown is coming up !!
  4. Hi newbiee... my flat is 90 sqm... very small niah.... four room flat... Maybe i will tell them that my budget is about 25k so that I have some room for buffer.... yup i read all the reviews on how responsible and solid they are, that's why very keen to engage them..
  5. yup yup ...go down and have a look yourself... it is quite nice actually i din know can sneak into the block C lift lobby area to have a look..
  6. Hi ah wai Thanks for the reassurance. Think I better start to approach Intra to get quotes At least can find out how much to save up before reno starts
  7. Hehe will go try the fish and chips the next time i go there
  8. Mine Kitchen is on the right hand side when you enter from the main entrance. Redhat, how does the supplied door and gates look like?? you got pic of them?
  9. Hi ah wai, thanks for the info! Wah... that's very good for you if it is less than 20k with lightings. Hopefully I can make it below 30K. my new place is a non-premium one, hence got to include floor files as well. I hope to overlay the HDB standard tiles also cos they look kind of ugly. Can I also check how long before can we discuss with them. My flat will come most prob Q1/2008. Not too sure if it is too early now too approach an ID for quotes.
  10. Apologise for the poor picture quality. Was taken with my O2 mini. The RC and the road behind our blocks are ready!! Shot at 2007-08-05 View of the carpark sky garden Shot at 2007-08-05 The foyer area in front of block C Shot at 2007-08-05
  11. Hi Jule thanks for your advise. I am thinking of doing the entire flat including kitchen cabinet, study, bedrooms and both toilets. Was thinking of hacking one wall down to join the master bedroom and one of the bedroom as well. Read through all the post and it seems quite ex to engage them. Was thinking with a budget of max 30k, whether it is still possible for intra to do the reno or not.
  12. Hi all It is very nice to hear all the good comments for intra design. I am interested to engage them as my house id. Can I check if anyone has to done it btw 25k - 30k (including lightings) for a new flat? Facing a bit of a budget constraint on my side
  13. welcome janicezuzu and will&pet to our forum Thanks Ikoice for the photos. I went down to our place yesterday. Can go into the place meh??? Anyway i took some photos too. Will upload it later once my phone finish charging.. haha Just check my HDB status.... still showing Q1/2008...sianzz
  14. Sigh....mine is still Q1 2008 too... sian ah...............
  15. Hi almonddust Mine is a four room flat. To-be Newly Weds like me haven thought about plans for kids yet. Intending to combine one bedroom and the master bedroom together for bigger room space and turning the other room into a study. I dun think our toilet space have sufficient space for a bathtub leh... I also hope I can do something about the ugly tiles in both toilets... Hi Derrick, that is good news to hear. Guess Block C people will get to move into the new place at a much earlier date. Just a small update also... i think there is only one tower crane left when I see the place from far on PIE this morning.
  16. Hi Bethel Thanks for the info. I will discuss with her again before deciding whether wanna go or not. Understood from your point how beneficial to attend this prep course. Haiz seems a bit ex for me....prob will need to count my piggy bank. and decide when it is closer to my wedding date. Mostly likely will go attend... cos my gf really really keen... Haha we should start a poll to find out who is already married and who is not
  17. Hi almonddust You are not alone. I am feeling the same way too. My AD is in Jan 08 and the house shd be coming around that time also. It feels very xiong on both our pockets for the wedding and the upcoming reno. Moreover we just paid for a bulk of the payment for our Bridal studio. Part of me hopes that the completion of our flats is earlier, part of me hope that it is later
  18. Hi Bethel My gf has been nagging me to attending this MPC. Seems like the course is quite ex right?? It is very seminar like where an instructor will lecture a group or there is activities to participate and stuff?? Sorry if i ask too much questions Hi almonddust, I heard that it is quite easy to convince the HDB officer in delaying to show the cert, so you dun have to worry
  19. hahaha you can see it from the higher floors if you look across the bishan depot that side. My gf lives around there... so i can see our new place from far whenever i go her house
  20. Hi almonddust welcome to the forum! Kakaka.... from AMK here i can also see from far that blk A is at the 40th floor already....hopefully the water tank crown will be up soon!
  21. Hi bonkitty You can check the status of your flat here https://services.hdb.gov.sg/webapp/BF02SPIN...app/FI10PPORTAL
  22. wahaha its ok... no worries... ok next time i try to take bus and pass by to peep in
  23. Just manage to walk pass our place yesterday... They remove the netting between Blk A and B liaozz...I think prob will start to paint soon... Can see the food court structure upz liao also
  24. wah....carelinwen....where you view the flats from?? I can't seem to see what's inside the rooms...
  25. yeah i thinking of overlaying my toilet also... saw some pictures in the forum before for HDB tiles.... they are really really really ugly.... too bad we dun have the choice to opt out to have those tiles...sigh...
×