Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

lth3388

Members
  • Content Count

    35
  • Joined

  • Last visited

Everything posted by lth3388

  1. Hi, do you mind to tell me width of the strike?
  2. Hi, it is white in colour.
  3. hi, yes. laminated wood.
  4. I see, finally got you. This will be difficult.
  5. That's what my OC insisted.
  6. Backsplash and dinning mirror installed.
  7. Day 31 Gate installed plus delivery of some iKea furnitures and electrical items. We are almost done.
  8. Day 30 All room doors installed Also installed some racks and roller blinds I bought from Qoo10 Shoe cabinet done
  9. Day 29 More activities. Balcony sliding door installed Another bedroom wardrobe Kitchen cabinet completed Kitchen entrance and 2 bathroom doors MBR wardrobe done
  10. Day 28 MBR bathroom, just short of shower screen and mirror Living hall
  11. Day 27, I'll skip air con installation, nothing special, a Panasonic system 4. Kitchen facet from TB, but it seems that our sink is too big.
  12. Cool, may be you can share with me the results when you decide to do that. I do notise the difference in height but maybe the contractor can level it later should I decide to laminate wood/vinyl or paint or even lay tiles on it. Another thing to worry is that it will be higher than the room floor.
  13. That is just a thought, may not be doing that. Hopefully it can last for several years from now.
  14. Yes, I understand that. I intend to paint or laminate wood later if we really can't tolerate it. Now, we are trying to endure the powdery feel.
  15. Day 26, more things done. kitchen cabinet solid top. (cement wall by the way) All 4 rooms laminate flooring done MBR platform bed MBR wall hung shelving for TV Kitchen view from service balcony. A small bar top
  16. Day 25, both toilets almost done.
  17. Day 23, kitchen cabinet WIP. Balcony tiles done
  18. It has very dirty look, water mark... Contractor polished it and it looks much better now.
  19. Bedroom MBR Living Dinning
  20. Lightings up. Service balcony (MIC but not from TB, given as gift) Kitchen (from TB)
  21. HDB officer was very responsive and came down twice to inspect and visited unit on top of us and finally determined that we could just solved it in our house. It was done in less than a week and he did it himself with the help of my contractor to hack the beam, and patched it back later. Hopefully, no more leaking.
  22. Day 19, electrical done but found new problem. Balcony beam (near to roof) leaking.
  23. I forgot to take photos when they were waterproofing kitchen and laying tiles there so I have to jump to day 18 when the cement floor in our hall is done. But the results were bad. Apparently, you need some one with good experience to do such job.
  24. Hi jnashville, sorry if I misled you. Actually, we couldn't find this from TB or locally so we ended up asking our contractor who is also making carpentry in house to custom made for us. I do not have the unit cost as it was lump with another mirror (same design but smaller), dinning hall mirror and shelves as well as a shelving for MBR. But it should not be too costly to ask your contractor to make it if you are still renovating your house.
  25. Just a sneak preview of how our MBR bathroom ended up with our researches and copying of ideas from this forum. We have in fact, placed our second order with TB.
×