Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Easter

Members
  • Content Count

    102
  • Joined

  • Last visited

Everything posted by Easter

  1. haha. I think you should LOL , I think he will also appreciate it la you recommend customers for him. that's great ! thanks beng, will give him a call to discuss about the curtain and blinds
  2. wow, ok , sure will keep a lookout
  3. thank you beng, it took us quite some time before we take the plunge to do it too haha, ya lo budget is everyone concern when comes to renovation. We keep reviewing our costs so not to burst our pocket because still have to spend on furnishing too. Thankfully we got quite a good and reasonable rate. Will update once there are more changes ya, honeykitty. I saw your 3D drawing, I think your turn out effect is gonna be good too, looking forward to see more updates from you
  4. nice light ya, went around shops to find, don't have much design we like if have the price is quite ridiculous, haha taobao really let you find treasures
  5. haha, reading your thread always so interesting.. nice blind there look great! I also intend to get blind from Ryan , does he do day and night curtain too? or just purely blinds? Because maybe will be intending to do curtains for the living room but blinds for other 3 rooms
  6. An exciting day for us as carpentry work is up today. Went down to look at the workmanship as this is the area we spend bulk of our $$ in the reno so DIE DIE must double check haha. When we went in, the carpenter was taking picture of our feature wall, he was quite pleased with the turn out effect and so do us. Love the mosaic feel black laminate for the TV feature wall and shoe cabinet, and the TV console shape. Because we can't really visualise from the 3D drawing initially. But the after effect is very good. Now the pictures will do the talking The black lines on the feature wall are actually black tinted mirror stripes. Our half height shoe cabinet with settee, we will be getting a mat to place below to place our common wear shoes / slippers Master bedroom wardrobe design with our customised accessories installed We chose black and white leather type laminate for the exterior colours and luckily it turns out quite up to our expectation Our study table and cabinet. Quite like the effect it turn out With carpentry done up, house reno is considered at least 70 percent done finally, left light installation, plumbling works and painting
  7. congrats beng your whole passageway have a good ambience nice
  8. Quality wise, condition is quite good. well packaged and in good condition, but I haven't installed it yet so can comment only after I switch it on and see the brightness. Only got one issue with my crystal hanging light, one of the light metal piece was broken maybe to transportation. But Peeka was very nice, they liased with the seller and send me a new one without charging me extra and shipping, so a thumbs up to their service haha, ya going to taobao is to find good bargain mah I think we learn from every members here, looking to find good deals ya quite looking forward to see the carpet too there you goes honeykitty, ottoman carpet
  9. Will be sharing links for the taobao lights that I bought Square LED downlights 5 inch 12 W : Link here 3 pieces crystal hanging lights : Link here Glass cube light I bought for my MBR foyer : Link here Ceiling lights for all my bedrooms (I got the 18W one) : Link here My toilet, bomb shelter lights: Link here Hope it helps, all this help me save on quite a lot of $$ on lighting TB is just too addictive, I still have a batch on items arriving on the 20th. I'm using peeka by the way thanks to Bengologist's recommendation, no hassle and good service
  10. Some minor updates on ceiling works : A very neat job of box up to conceal the air con piping that is running through the common corrider, almost didn't realise it till I see closely. My L shape false ceiling is up, now is awaiting the downlight and covelight installation My main carpentry work will be next Tuesday, together will be fixing up the lights.
  11. ya, it's very nice. Can't wait to see it up Hi juxstapose, the lightings are not up yet. Looking at exterior side all is looking good, but can only comment only all is been fix up. Will update again on Tuesday when everything is up
  12. nice, haha ya we got the same ice cube lights, its very nice no regrets the tap is very nice too, good choice I got the same lights for my toilets , bomb shelter, kitchen too. haha, happy shopping on taobao, super addictive
  13. wow, nice now your reno is too fast too furious everything looking good anw, very nice sink there ! and so many accessories with it look very elegant, nice buy moving in soon bro?
  14. the divider idea is really , very sleek and nice
  15. Air con piping was completed, I choose to do it at the outside of the room instead of behind the carpentry work in the 2 rooms. So my ID suggested that I can hide it with a boxup later. All my lightings from taobao consolidated and ready for light fitting. Waiting for one more batch of taobao purchase to arrive on the 20th some preview of the ceiling lights(left) and MBR foyer light(right). Can't wait to see all the carpentry and ceiling up soon, will update soon
  16. Omg, then how for the sink? Maybe just do some measurement adjustment not possible ?
  17. Wah, congrats man on your new member to your family I see, ya, can understand since we also rushing to move in. Meanwhile maybe can start to pack your stuffs so when Reno ready can chop chop curry pok move in liao haha.
  18. ya, bound to have some gap. Because 3D drawing normally tend to stretch further, giving us the illusion that we got more space. Especially the kitchen area haha I saw on our sengkang rivervale FB group, one of our neighbour have this shoe cabinet cum divider, quite nice and seem that there are still quite some space behind, so is depending on individual.
  19. welcome to RT, haha now all BTO floorplan all look so similar. Good luck to your reno
  20. haha, ok la.. as long on track can liao but now really very gan chiong, because lunar 7th month is on 7th Aug 2013. According to schedule, my handover should be 20th July. So have to pack and move in before the 7th month, how about you? you will be moving before the 7th month or in September period ?
  21. Minor updates, didn't really have the time to dropped by our new place due to hectic work schedule. Only managed to went up today and saw that the electrical work and gas piping is done, now so looking forward to our L-shape false ceiling design in the living room, hopefully it will turns out good Gas piping done up with electrical point for hood Living room wiring done up for downlights and cove lights, I think it looks kinda funny here because the false ceiling is not up yet. The wiring done up for the passageway as there are going to be 2 downlights there as well. My study room wiring work, I realise there is consealed wiring done up, and my ID is so nice to help me install a switch for my study table lights. I think that's all for now, next progress should be air con piping followed by false ceiling installation.
  22. hi honeykitty, sorry I'm not sure on this part, have no experience as I did not change my rain shower, maybe can check with your ID before you buy? I see, I think lights most important if your ceiling work is starting. Others still ok, haha true abit abit add up a lot lei lol
  23. ouch! beng, was about to say that your chandelier is beautiful then saw your post on the incident, luckily no one is injured. Ya, must ask them ensure that the replacement set is secure properly, so dangerous! luckily your ID and electrician take responsibility for it, if not really very heart pain.
  24. Congrats your new place is so cosy. I love your shower area, it's so unique, enjoy your lovely nest
×