About Mormor2013

  • Rank
    Bronze Member

Previous Fields

  • Gender
    Male
  1. Been busy with work lately. Reno completed, moved in for about a month. Still looks a bit bare. Don't really know how to decor the place. Will post some pictures soon.
  2. I used the wood tiles for the kitchen floor, it's rough enough. The corridor in front of my unit is super wide. Not likely it will get wet from rain.
  3. We bought the WC and some other accesories from Alan's recommended shop at AMK.Price is quite similar as those shop at Jalan Besar. So he'll arrange for the delivery for us. The auspicious date to move in for us early June. But we can still let him touch up until end of June.
  4. In the end we use the typical floor trap, stainless steel instead of the plastic one. Tiling finished on Monday. Plastering started on Tuesday, 90% done by end of today. Rewiring will start tmr after the plastering work. WC installlation & plumbing will also start tmr. Might be meeting carpenter this sat.
  5. The extra room is behind the kitchen. It has the most windows and the best view.
  6. Yes.. He and his 2 workers are good. Bought this floor trap a bit too late, as the waterproofing has been done, can't install it anymore Got it from Heritage Bathroom. It's a hidden floor trap, as shown at Sohnice's t-blog http://www.renotalk.com/forum/topic/45539-3-room-hdb/page-11 Bought it at $30 each Willing to let go at $40 for 2. Any takers?
  7. Is your tiler uncle with a moustache?
  8. Ordered a few items online Toilet accesorries set from Amazon for both toilets Grohe basin taps and kitchen faucet from Insani24
  9. Week 3 - Rewiring & Plastering work Existing air-con trunking rerouted Wiring removed
  10. Kitchen cabinet base Entrance steps - using same tiles as kitchen floor
  11. Week 2 - Tiling at Toilets and Kitchen MBR Toilet Common Toilet Kitchen Floor - Wood tiles Kitchen Wall - White tiles with "invisible" pattern
  12. Reno started in end April. Week 1 - Hacking, hacking & hacking Basically, nothing much can be salvage, almost everything is torn down. The nicest room is acutally the utility room... haha
  13. Toilets MBR Toilet - Super tiny toilet Common Toilet
  14. Utility Room Master Bedroom Common Room
×