Sorry and pai sey arh... My hubby add up wrongly... Total is 40K. The uncle give a lump quote... No carpentry for all bedrooms.. only master. The dresser also in there. 1. To hack & remove floor tiles to living, dining, store and balcony and lay new homogenous/ceramic tiles and skirting L.S. $ 3,700.00 2. To supply and lay parquet 12mm * 50 *250 (from Burma) to all bedrooms (4 Nos) with matching skirting. L.S. $ 3,600.00 3. To plaster over existing rock-tone to smooth finish to wall/floor L.S. $ 3,650.00 4. To supply and lay floor & wall tiles to kitchen & bathrooms (include waterproofing) L.S. $ 6,650.00 5. To supply & install molded main door, aluminum/acrylic bi-fold (2 Nos) & shower screen (2 Nos). L.S. $ 2,000.00 6. To supply and install aluminium grilles(balcony) & W.I. gates L.S. $ 900.00 7. To change electrical wiring and power and SSO (Light Fitting excluded) L.S. $ 2,300.00 8. To change all plumbing & sanitary fittings. (Sanitary ware & fitting excluded) L.S. $ 3,200.00 9. To construct plinth and sink top of granite /marble L.S. $ 1,400.00 10. To paint whole house; one sealer and 2 finishing coat Nippon Vinilex L.S. $ 2,000.00 11 To supply and install kitchen cabinet of Melamine Top 22 ft run and wardrobe 15 ft runs L.S. $ 9,120.00 12 To raise balcony level and to alter door openings, And to dispose rubbish. L. S. $1,550.00 I still feel a bit expensive but what to do... Me machiam got no say like that. I want downlight he says no need this and that. Argh!