Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

ptww85

Members
  • Content Count

    9
  • Joined

  • Last visited

Community Reputation

0 Neutral

About ptww85

  • Rank
    Member

Previous Fields

  • Gender
    Male

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

  1. Hi Smurf11, I've also signed with them. starting works end-March. workmanship looks good. did you also see the bukit batok house?
  2. i showed my this below quote to Voila design pte ltd at thomson plaza, and after our short discussion , they counter-offered me $22,880 (nett, inclusive of gst) on this same quote. can anyone pls advise on my quote? : -------------------- S/No. Description Unit Price 1 Drawings and Services 1.1 Provide up to 06 no.s of 3D drawings (inclusive of 1 round of amendment per drawing) Complimentary 1.2 Site co-ordination & supervision Complimentary 2 Hacking Works 2.1 Supply labour to dismantle 01 no. basin and 01 no. mixer-tap at Toilet1 $80.00 2.2 Supply labour to dismantle 01 set shower-head and shower-bar, and 01 no. bath mixer-tap $80.00 at Shower Area of Toilet1 2.3 Supply labour to dismantle 01 no. toilet bowl at Toilet1 (HDB-supplied toilet bowl to be re- $100.00 -installed) 2.4 Supply labour to dismantle 01 no. basin and 01 no. mixer-tap at Toilet2 $80.00 3 Masonry Works (w/wall and floor tiles of up to $3.00/sqft where applicable) 3.1 Supply labour and material to construct 19.5ft L cabinet base at Kitchen $390.00 3.2 Supply labour and material to construct 01 no. refrigerator base in tiles finish at Kitchen $120.00 3.3 Supply labour and material to construct 01 no. washing machine base in tiles finish at $120.00 Kitchen 3.4 Supply labour and material to construct 02 no.s shower kerbs in tiles finish at Toilet1 and $240.00 Toilet2 3.5 Supply labour and material to over-lay with 60cm x 30cm homogeneous/ceramic wall tiles $1,800.00 at Toilet1 (250sqft) 3.6 Supply labour and material to over-lay with 30cm L x 30cm W homogeneous/ceramic $450.00 floor tiles at Toilet1 (Lump-sum) 4 Plumbing Works (Client to supply all Fittings) 4.1 Supply labour to install sink and tap at Kitchen $180.00 4.2 Supply labour to install 02 no.s basin & 02 no.s mixer-taps at Toilet1 and Toilet2 $160.00 4.3 Supply labour to install 01 no. shower head w/bar at Toilet1 $50.00 4.4 Supply labour to install 01 no. storage tank heater at Toilet2 $140.00 4.5 Supply labour to install 01 no. mixer-tap at shower area at Toilet1 $80.00 4.6 Supply labour to install 01 no. mirror at Toilet2 $40.00 4.7 Supply labour to install 02 no.s hand-sprays at Toilet1 and Toilet2 $40.00 4.8 Supply labour to install 02 sets of toilet accessories at Toilet1 and Toilet2 $60.00 4.9 Supply labour to re-install 01 no. toilet bowl at Toilet1 $100.00 5 False Ceiling Works 5.1 Supply labour and material to construct 6ft L full-height partition-board wall **** Area $360.00 5.2 Supply labour and material to construct 55ft L cove-light holder **** Area $1,100.00 5.3 Supply labour and material to construct 15ft L cove-light holder at passageway $300.00 5.4 Supply labour and material to construct 190sqft false ceiling **** Area $570.00 6 Glass Works 6.1 Supply & install 8ft L of 6mm-thick spray-painted tempered Glass Backing at Kitchen $480.00 6.2 Supply labour and material to install 01 no. max.3ft L x 4ft H clear mirror at Toilet1 $250.00 6.3 Supply labour and material to install 01 set 10mm-thick clear tempered glass shower $450.00 screen c/w swing-door at Toilet1 6.4 Supply labour and material to install 01 no. max.3.5ft L x 6ft H 10mm-thick clear $300.00 tempered glass fixed panel at Toilet2 7 Granite Top 7.1 Supply labour and material to install 8ft L granite top c/w backsplash at wall "A" at Kitchen $960.00 8 Solid Surface Top 8.1 Supply labour and material to install 6ft L solid surface top c/w backsplash at wall "B" at Kitchen $480.00 8.2 Supply labour and material to install 2.5ft L solid surface top c/w backsplash at Toilet1 (Lump-sum) $250.00 9 Painting Works 9.1 Supply labour & material to paint whole house walls & ceiling in up to 05 colors of Nippon paint $1,200.00 10 Customised Carpentry Works (All Externals in Selected Laminate; with Internal Carcass in White PVC finish) 10.1 Supply labour and material to construct 7.5ft L full-height feature wall **** Area $1,593.75 10.2 Supply labour and material to construct 6ft L suspended TV console **** Area $720.00 10,3 Supply labour and material to construct 7.5ft L full-height feature wall at Dining Area $1,912.50 10.4 Supply labour and material to construct 11ft L full-height built-in wardrobe c/w sliding doors $2,640.00 at Master Bedroom 10.5 Supply labour and material to construct 6,5ft L full-height built-in wardrobe c/w sliding doors $1,560.00 at Bedroom 2 10.6 Supply labour and material to construct 8ft L top cabinets at wall "A", at Kitchen $880.00 10.7 Supply and install Blum soft-closers for casement swing-doors at 8ft L top cabinets at wall "A" Complimentary at Kitchen 10.8 Supply labour and material to construct 8ft L bottom cabinets at wall "A" at Kitchen $880.00 10.9 Supply and install Blum soft-closers for casement swing-doors at 8ft L bottom cabinets at Complimentary wall "A" at Kitchen 10.10 Supply labour and material to construct 4ft L top cabinets at wall "B" at Kitchen $440.00 10.11 Supply and install Blum soft-closers for casement swing-doors at 4ft L top cabinets at wall "B" Complimentary at Kitchen 10.12 Supply labour and material to construct 01 no. tall cabinet c/w 01 no. cut-out for microwave $600.00 oven and 01 no. cut-out for built-in oven at wall "B" at Kitchen 10.13 Supply labour and material to construct 4ft L table-top without drawers at wall "B" at Kitchen $400.00 10.14 Supply labour and material to construct 2ft L bottom cabinets at wall "B" at Kitchen $220.00 10.15 Supply and install Blum soft-closers for casement swing-doors at 2ft L bottom cabinets at wall "B" Complimentary at Kitchen 10.16 Supply and install 01 column of 04 no.s drawers at wall "A" at Kitchen Complimentary 10.17 Supply and install 01 no. cutlery tray in 01 drawer at Kitchen Complimentary 10.18 Supply and install 01 no. stainless-steel dish rack at wall "A" at Kitchen Complimentary 10.19 Supply labour to install (excluding electrical installation) cooker hood and gas cooker/hob (both Complimentary cooker hood and gas cooker/hob to be supplied by Client) at wall "A" at Kitchen 10.20 Supply and install 01 no. dish-rack c/w aluminium-framed frosted glass door at wall "A" at Kitchen Complimentary 10.21 Supply and install 2.5ft L suspended vanity cabinet at Toilet1 $300.00 10.22 Supply and install 2.5ft L suspended vanity cabinet at Toilet2 $300.00 11 Miscellaneous Works 11.1 Supply labour to clear debris & haulage $150.00 11.2 Supply & lay corrugated paper for flooring $150.00 11.3 Supply labour to perform chemical washing (where applicable) for whole house flooring $200.00 T/Total: $23,956.25 Discount: $606.25 Grand Total: $23,350.00 -------------------- this Voila company counter-offered me $22,880 , can anyone please help review/ comment? thks in advance..
  3. saw them near united team at thomson plaza, i too hope to find some review of their latest work before deciding.
  4. hi jbooncho, is your home completed yet? how was your overall experience?
  5. casa you got good taste, Louvre has a nice island, but also way out of my budget i saw some other shops near Louvre with some decent carpentry too still thinking about it
  6. thnks for your timely update! we'ere thinking of going to their showroom to have a look. will save our effort now.
  7. Hi , anyone has their home completed by Kenneth recently? need some reviews pls
  8. was at IMM and happened to come by this Inner View company. would appreciate if anyone who had their home recently-completed by this co has any review?
×