rolex
Members-
Content Count
30 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by rolex
-
Reconstruction/a&a Quotation Inter-Terrace House
rolex replied to Muddlehead2014's topic in Renovation Packages
Be sure to check out this thread first: http://www.renotalk.com/forum/topic/60544-builders-to-avoid/- 9 replies
-
- reconstructionA&A
- Quotation
-
(and 4 more)
Tagged with:
-
I also bought Simplehuman stuff from Amazon cos getting it in S'pore is cut throat. I actually shipped a dustbin over
-
Builder Vs Contractor For A&a
rolex replied to MBev's topic in Landed & Condo Private Properties Renovation Discussion
U might want to consider contractors or builders directly which they will work with a QP (Qualified Person) to submit the plans for u. But most impt is to take a look at the Builders to Avoid thread to watch out for the conman in the market. -
Will the gaps between the wood surface again shortly just by using wood filler?
-
Hi all folks, Is doing A&A currently and thinking to install the open net fibre in my house. Would like to seek those who are already using the broadband fibre in your home for some advice. The open net guys told me that installing the termination point at my level 1 tv console area might result in weak signals for places like level 3. He told me to install in my storeroom which then I can run LAN points to level 2 and 3 so that I will not have signal problems. Problem is I have trouble running the wires up due to the hacking job that will be involved. Is it true that the signal is really weak if the termination point is at level 1? Would appreciate any advices from users.
-
Hi all, I like the effect of cove light but is always hesitating for I know it will be a paradise for all insects and lizards. Owners who have installed cove lights at home, pls share on the maintainence. Thanks.
-
To The East We Go!
rolex replied to shmj's topic in Reno t-Blog Chat - Condo Interior Design and Landed Renovation
Knock... knock... Awaiting updates from u Envy yr fast work progress, now mine still hacking stage... delayed from scheduled. I think I am always too soft with the contractors, accepting their crapped excuses. Work will always speed up after hubby make noise. -
Ok gotta my final bill for cargo and freight. It's really a killer paying the cargo in Singapore. Warehouse charges alone is $550... Which I really wonder omg why it could it so high???!!! Calculations confirmed that if I buy fr SG might only cost a bit more as quoted earlier.
-
I have also order quite a number of furnitures and lights from Bangkok. Now cargo in Singapore and awaiting the last part which I hope that will not give me a scare. Will update again.
-
Not a guru myself but I have to admit that items that invovles the structural changes will be costly. Seriously u might want to reconsider not shifting the stairs, might help u save a little. The golden rule is always get at least 3 quotes to compare. I think I did more sutff than u but my damages was around $450k, inculding carpentry and fittings.
-
To The East We Go!
rolex replied to shmj's topic in Reno t-Blog Chat - Condo Interior Design and Landed Renovation
Wow that's fast! Can see a big area gain too! -
Taking Wall Mirror Away
rolex replied to Brylina's topic in Landed & Condo Private Properties Renovation Discussion
Hung but not glued on right? Yes, I also think can remove cos my ex owner also took away anything that can be removed which also includes a mirror ( but not as big as the one u mentioned). Check with yr agent if in doubt. -
To The East We Go!
rolex replied to shmj's topic in Reno t-Blog Chat - Condo Interior Design and Landed Renovation
Not the same contractor. I have no choice to get 1 and 2 levels ready as the top works will be installing a roof terrace that no way it can be ready in such as short time frame.... -
To The East We Go!
rolex replied to shmj's topic in Reno t-Blog Chat - Condo Interior Design and Landed Renovation
Really shake hands and hi five to you also! Our story is about the same, but I managed to nego and stay on till Dec since selling off last week. But yrs level 3 and 4 ready, by mine is level 1 & 2 ready, level 3 and 4 still ongoing. And I also plan to install digital lock for my main door. Yes...I cannont imagine living with dirt and dust but gotta no choice... Do not want to go thru shifting to temp rented place and shift again when ready. -
To The East We Go!
rolex replied to shmj's topic in Reno t-Blog Chat - Condo Interior Design and Landed Renovation
Hey we are in the same shoes! I have in shift in mid Ded but only my level one and two is ready . Works will be ongoing cos I also need to handover my hdb in Dec. Full completion might be Feb or so. -
To The East We Go!
rolex replied to shmj's topic in Reno t-Blog Chat - Condo Interior Design and Landed Renovation
Like to see the mess...cos it means work in progress!!! After that will be swee swee. When will all be comppleted? I am starting my works this Fri, seems to be near yr place too!