Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

ehspro

Members
  • Content Count

    173
  • Joined

  • Last visited

Everything posted by ehspro

  1. Wah 30 DAYS into the renovation, it seemed that everything is smooth sailing and I am almost done!! Thanks to the Ninja ID LASKA ...yeah yeah... PICTURES COMING UP SOON....
  2. Yap...thanks for the heads-up..I was amazed at the speed of my reno progress..so far no hiccups and minimal supervision...one month liao...I am into carpentry liao
  3. Yes, Laska quite proactive, told me about the wooden support needed for extra fan at Level 3 within false ceiling....swee..
  4. Think your Joven kangtao cheaper than Joe's...paid $260 for 35L one.
  5. Hi...sad to hear that you contractor is not what he is perceived to be...I thought HDB has a one month renovation timeframe, how can he overrun by almost 2 months? 3 room flat only nia... :jawdrop:
  6. Ya forgot to tell you it is not EM...still think your ID quote is a bit expensive...
  7. Mine is the "Tropical" layout...wah lao...like that must check liao...I very kiasu one. Would looking at existing "Heater" switches location be a good start? Alternatively must do trait and error liao...
  8. Wah very nice lei...eh u copy my living hall argh! NICE! show a pic of your Corgi lei..
  9. Ha this one I know. I used to be engineering trained. Thanks buddy
  10. Ok I have to do trial and error when the installation are completed...thanks buddy
  11. Bro quick recap on this. I have installed a new 35L Joven Water Tank for 2nd and 1st level (Using the previous owner's configuration)and this unit will service 1st and 2nd floor toilet + dry kitchen + wet kitchen basin (newly installed) with mixers. I have one switch at 1st level toilet and another one at 2nd level toilet. I really have no idea how the pipings are layed out. Questions are 1. Do I need to turn on both switches to heat all the 4 locations? 2. Does it speed up the heating time/rate if both switches have been turned on? 3. What if I turn on one only- will it be sufficient? Please advise sifu.... :bow:
  12. Settled with Joe yesterday on outstanding items. Mid size Handbar costs me $32 Do you install handryers in any of your bathroom?
  13. Did not notice...will check at Joe's place...is Joe's stuff cheaper than Poh Joo?
  14. Ya lor, was refering those who have invested in excess units...back in 2006 I know a engineer who has 9 private properties!!
  15. Wah lao so so cheap no wonder everyone selling to reap the profits!!!
×