Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Mymoonlighting

Members
  • Content Count

    37
  • Joined

  • Last visited

Everything posted by Mymoonlighting

  1. yes correct ard 5k mine I have 6data point and svc point and also N no of switches too
  2. Re-wiring for EM normally is ard 2-3k for mine is 5.5k for whole house and include electric point,whole house data point and all switches also whole house down lights and all my electricity are all conceal electricity wiring
  3. Re-wiring for EM normally is ard 2-3k for mine is 5.5k for whole house and include electric point,whole house data point and all switches also whole house down lights and all my electricity are all conceal electricity wiring
  4. Bamboo blind will not have mold if you get it paint n don get the bamboo blind from Ikea that kind of blind will sure get mold, I get my bamboo blind done by my curtain guy who did all my curtain n get paint in white look very nice,Btw Hdb will not install FOC roller blind gor the corridor door area...
  5. I install the bamboo blind to blocking the rain & sun,It's really work and not that costly
  6. It's depend if you are just doing simple overhaul then maybe it can be done
  7. stainless steel railings,just saw 1 unit at bedok reservoir EM Val 560K selling at 1.1K so COV is 550K the selling must be crazy!!!
  8. Mine 5K is include solid teak wooden steps n hacking n redo all my stairs.
  9. My staircase is like the HUDC staircase which land facing the kitchen so I changing it face the living room instead
  10. My Em is still at reno Good news is I got HDB approve for changing of the staircase landing...Which normally HDB will not approve..
  11. My quotation was ard 60k for overhual.And my main con is very good now just waiting for my reno to be complete.
  12. Wow looks like EM cov went up again,actually we wanted to wait n see if cov will drop, luckily we bought our Em at cheap cov at april
  13. Hi potatoes, Can share how much ah wei charge you for your MBR build in wardrobe?
  14. Hi salseraritz, Looks like we are having the same type of kitchen cabinet glass doors...ur hubby got the rite choice glass door are more durable & easy to maintain den laminate...
  15. I am using main con & yes 14K for my carpentry work and now I 'm waiting for my 3D drawingfrom my main con & was quote fm them 30K for major overhaul(hacking, change all toilet wall & floor tiles,kitchen wall & floor tiles,brand new staircase with glass railing,all PCW window & gills,glass roof & glass sliding door for balconcy & kitchen,false ceiling & cove lighting for whole include kitchen & toilet.change all new rm doors,painting. except for the living & bedroom flooring teak wood by my hubby company & rewiring cos ard 4k by my hubby cousin.urs 72K for overhaul since quite ok but must also see what you do.
  16. Hi salseraritz, When u will be taking your keys??Are you doing major overhaul?As for mine I'm doing major overhaul.....everything goin to be brand new... Just confirm my carpentry works today for Tv console,Tv wall feature,shoe & dinning area cabinet,my MBR 9ft WIW ,Kitchen cabinet optical door all come with blum hinges plus 1 island cabinet & 2 toilet vanity cabinets.... I was quoted for 14k
  17. Hi salseraritz, how much COV you paid for your EM?Me taking my keys next mth....
  18. Hi aron pls quotes MIT inverter System 3 (12k,9k X2) Tks
  19. Hi aron pls quotes MIT inverter System 3(12btu,9btuX2) Tks
×