warderz
Members-
Content Count
62 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by warderz
-
That's why i did not purchased ur unit as I will be in a messy situation if my wifey and I decides to have a debating session. My mom and dad will be the first person to know about our debate. Secondly, just came back from viewing the latest progress of my home and decided to stop by at ur place to kaypoh kaypoh lah at abt 6pm. All the hackings have been completed and the only part of ur house which I adore is ur squarish balcony. Cool view of the playground and human traffic from there. So you are going to redo ur MBR toilet and the balcony yeah. I can see that the kitchen has also been hacked to give way for ur new cabinet and kitchen tiles. I asked the contractor who was present and he said that they did not do much today, dismantling, hacking and more to unloading of ur tiles and cement. Wah, now I am like a secret agent pulak. Anyway judging from ur tiles that I saw, ur style is more to modern living is it? Correct me if I am wrong. If u & ur hubby are dropping by to view ur unit, feel free to view mine on the 6 floor k.
-
Ah bro, I saw one at novena sungei kadut. And trust me there are so may varieties of furniture and there are so many warehouses there, prices are also much more cheaper than furniture mall. Alamak bro, if you still have ear plugs for range, just use it lah. ha ha ha. Just joking, anyway are you also a northener? Yeah bro, my air con contractor was also talking about this LG cheapo thing. He recommended me either the Mitsubishi or Daikin. Bought my place @ 290k. If you're wondering the size, its 125sqm. How bout urs, is it the one on the 4th floor? And how much u got it for. SQm?
-
Bro before you proceed further don't forget to get hold of an entertainment license. Just joking, anyway the idea is way cool man to have a pool table in ur place. Only if my wife will allow me to do so.
-
Went down to Sungei Kadut in the afternoon and settled all the purchasing for the furnitures and the children bedroom sets. 1. 5ft dining table - $1158/- bought @ Red Apple Interior furniture 2. Full Leather 3 seater sofa - $1188/- @ red apple interior furniture 3.Coffee table - $ 398/- @ Red apple interior furniture 4. King size mattress - $800/- @ Red apple interior furniture 5. 2 super single mattress & 2 single mattress - $135 each/- @ Novena 6. 3 egg stools - $49/- each @ Novena 7. Bunk bed for my 2 boys - 8. Super single bed for my princess - 9. 2dr wardrobe for her - 10. Study table for her - 11. Night table for her - 12. TV sideboard for the boys - Items 7 to 12 - $ 2397/- @ Novena Phew....
-
Went down to check what is the latest on my flat today, and was glad to see the entrance to my walk in wardrobe being completed. Oh yeah, Lynzi ur reno werks is going just fine and noisy, all the hackings can be heard from my hall. HA HA HA If u r viewing ur reno progress, pls feel free to just walk to the blk which is facing ur hall and view the reno werks on the 6th floor corner unit. BTW just out of curiousity, ur place is on the 4th floor rite? Cause I've actually went for a viewing session with my agent to that unit somewhere last yr, but I think its too near to my mom's place which is also on the 4th floor of the opposite blk (683c). To make things worse her balcony is facing the unit's bedrooms. Aiyoh if there is a debate session with my wife, confirm my mom will be the first person to know abt it. Maybe one of this day I'll just drop in and kaypoh kaypoh see on ur reno if u don't mind. HA HA HA Yeah, u've got it rite, there will be no changing of tiles, most of it will be carpentry werks. The living hall will be overlayed with a laminated platform and above it there'll be another platform or what u call a setty. Anyway the previous owner was using a window unit a/c for the mbr, so decided to change the air con to a system 3 (Mitsubishi) @ $1950 from Ricool.
-
Hello Autumnzy, need ur guidance on how to post pictures like yours. Thank you.
-
Ha ha ha, I'm quite impressed by the rate they are werkin. 1.Last Thursday they started with the hackings. 2.Friday, completed with the wiring for the house. 3.Saturday, completed fixing L box and false ceiling. 4.Monday completed backing for tv console and partition between the living rm and the dining area. Will keep you guys updated on the latest.
-
WOW!! That's really a fast reply. Anyway Autumzy if u dun mind, how much did u pay for ur new place and what is the sq metres?
-
Wow, all of us r neighbours and will be doing reno works around the same time. Anyway do you guys think that our new place is a bit quiet at night? Regarding bethroom acessories, have you checked the prices at SIM SIANG CHOON? 5yrs ago I bought my lightings and bathroom acessories there as it seems that the prices there are quite reasonable.
-
Hi neighbour, just to check with you regarding the place where you purchased the dining set and the rest. Where is it actually located? Like ur dining set a lot as it suits the concept of my flat.
-
My block is 682b, and its my pleasure to inform that the reno works have officially started today. Anyway if any of u guys, fellow bloggers are wondering how much is the cost of the reno, its 30k++. My reno will just be a simple one. Anyway for lynzi and autumnzy which block are yours? And what are the concepts for ur homes?
-
Thanks to all well wishes, the quotes are as below, Hacking/Demolition works 1.Dismantle kitchen top & shelves 2.Dismantle 2 toilet bowls 3.Labour to clear all debris & uploading of goods & materials Masonry works 1.Supply and install laminate flooring @ living 2.Supply and install 10mm tempered glass shower screen @ toilets Gates / Doors 1.Supply & install 1 wrought iron gate Electrical/Plumbing & sanitary ware 1.Supply & install 2 shower sets 2.Supply & install 2 wc @ 2 toilets 3.Supply & install sink & tap Painting /plastering 1.Supply labour to paint whole house using ICI paint 2.Supply labour to paint door/door frames/pipes Ceiling & partition works and cornices 1.Supply & install L-box @ living area 2.Supply & install false ceiling @ dining area 3.Supply & install, false ceiling & L-box @ master bedrm 4.Supply & install false ceiling at bedrm passage 5.Supply & install false ceiling @ foyer area Carpentry works 1.Design & fabricate 5ft laminate shoe rack @ entrance 2.Design & fabricate 8ft feature wall in gypsum board 3.Design & fabricate 2 nos of 2 ft laminate bedside table 4.Supply & install 4ft full height mirror 5.Design & fabricate 10ft headboard in laminate c/w cushion 6.Supply & install glass door c/w gypsum board Kids Bedroom 1design & fabricate 7 ft casemwnt wardrobe Master toilet 1.Design & fabricate 6ft laminate vanity cabinet 2.Supply & install 1 nos full height mirror Common toilet 1.Supply & install 1 nos full height mirror Others/remarks 1.Supply labour to acid wash whole house 2.Supply labour to install sink & shower set 3.Supply labour & material to rewire whole house