Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Eileen1

Members
  • Content Count

    4
  • Joined

  • Last visited

Community Reputation

0 Neutral

About Eileen1

  • Rank
    Newbie

Previous Fields

  • Renovator Engaged
    no
  • Gender
    Female
  1. I HAVE ALREADY POSTED BUT MY PASSWORD HAS CHANGED DO NOT PATRONIZE THIS RENOVATION COMPANY Both of them are irresponsible, unethical and liars! Everything is possible and smooth sailing before signing the contract is sign. They promised to provide superior workmanship and quality materials. All these are all bull****s. True colour was shown after they collected payment from owner. Poor workmanship, electrical and plumbing works were done “illegally” and not as per regulatory requirement. Materials provided were not as per contract. They provided a much lower grade materials and cheated on the owner. And, project was delayed for more than 3 months and yet still cannot complete the work. Later I found out that the delay was due to their financial difficulties and hence, tiles, doors, carpentry work were not delivered to the owner’s house. Worst of all, Fabian Tan, the in-charge, did not even bother to supervise the work. Water leaking, lights were left on for days and etc. Angeline Fong, the wife, will try to throw in design, freebies and etc to win the contract. All these are GIMMICKS!!! Do not be "con" by them http://i33.servimg.com/u/f33/12/53/66/00/p1000410.jpg http://i33.servimg.com/u/f33/12/53/66/00/p1000412.jpg
  2. hi all RT forumer, before i pen down on the deciding on which ID firm / contractors that we are going to sign, any on-going clients with this company so that we can understand more of their workmanship, pricing and stuff like these. any feedback is well come, kindly PM me. \ the area of the job scope is as follows: HACKING & HAULAGE Demolish existing wall between kitchen & dining w. clearing of debris Hack wall tile at kitchen Hack floor tile for kitchen Hack existing door frame at kitchen Remove existing kitchen cabinet with disposal Hack existing concrete sink/stove support in Kitchen with disposal Dismantle existing Kitchen Sink Remove parquet platform at master room with disposal Dismantle existing toilet bowl at both toilets Demolish existing mirror at corridor Make Good all Hacking Affected area KITCHEN Construct New Wall & Smooth with Plaster, Include: Construction of Serving Window Install painted Tempered Glass backing for exposed Kitchen Walls between Cabinets Install Top/Bottom Kitchen Cabinet with Laminate Doors, Soft Closing Hinges Include: Dish Rack/Cutlery Tray/Magic Corner Basket Install One (1) Full Hieght Kitchen Cabinet with Laminate Doors, Soft Closing Hinges Install Solid Surface Work Top Lay Matte Homogenous Floor Tile for Kitchen with Water Proofing Install Clear Tempered Glass Swing Door Construct Tiled Cement Base for Kitchen Cabinets Construct Tiled Cement Base for Refrigerator Construct Tiled Cement Base for Washng Machine LIVING ROOM Construct Full Hieght Feature Wall with Console and TV Mount Construct & Install Altar (2 feet wide with Swing door and Glass inlay) Install False Ceiling in Living Area DINING AREA Install Mirror Feature in Dining Area STUDY Install Top Hung Cabinets with Laminate Doors, Soft Closing Hinges Install Suspended Desk with Laminate finish, Pull out drawers and Flip-Top Hinge for cabling Install Mesh Racks under Suspended Desk Install Bottom Rack for placing computer equipment MASTER BEDROOM Install 4 ft. Suspended TV Console Install Headboard for King-size Bedframe Supply two wall mounted Bedside tables Install Full-Height Walk-in Wardrobe with Laminate Doors and Backing with Painted Finish Install Full-length Mirror Install False Ceiling in Walk-in area PLUMBING / ELECTRICAL Install Concealed Piping (at Kitchen) Install Hot Water point (with Copper Piping) at Kitchen Sink Water point Labour to install new Kitchen Sink Labour to install new Kitchen Hob/Hood & Oven. Install new W.C. in Master Toilet Install new W.C. in Common Toilet Install spot lighting & wall mount fan in Walk-in Wardrobe Install lighting in Corridor leading to Master Bedroom Install concealed Piping for Cat 5e cable from Living Room to Study Install additional lighting in entire Apartment (KIV) Install additional electrical points in entire Apartment (KIV) PAINTING / POLISHING Re-Grind & Re-Varnish Existing Parquet Flooring in 3 Bedrooms / 1 Study Polish Existing Marble Floor **** Hall Acid Washing + General Cleaning of entire Apartment Painting Works in entire Apartment, including all exposed piping Special painting works in Foyer Area MASONRY After removal of mirror from Corridor, smooth Corridor wall with Plaster if required. Install False Ceiling in Corridor leading to Master Bedroom
×