Dear all, We will be doing our reno for the first time and appreciate any advice on the quote below... Thanks!! Demolition works 1. Hack & remove whole house unwanted build-in furniture $800.00 2. Hack & remove 02 bathrooms wall tiles, floor tiles & all fixtures $600.00 3. Hack partial wall @ master bathroom to create vanity area $100.00 4. Haulage loading of sand, cement & material to unit $500.00 Masonary Works 1. Construct 63 mm hollow block wall @ master bathroom $480.00 2. Supply & lay heavy duty ceramic wall tiles with mosaic @ common bathroom $1,900.00 3. Supply & lay heavy duty ceramic floor tiles with cement screeding & waterproofing @ common bathroom $550.00 4. Supply & lay heavy duty ceramic wall tiles with mosaic @ master bathroom $1,900.00 5. Supply & lay heavy duty ceramic floor tiles with cement screeding & waterproofing @ master bathroom $550.00 6. Hack & repair damage timber strip flooring @ master bedroom (include repair damage skirting) $680.00 7. Supply labour & material to gain & varnish 03 bedrooms parquet strip flooring $800.00 Plumbing Works 1. Change whole unit cold water piping to stainless steel pipes $500.00 2. Change whole unit hot water piping to stainless steel pipes (4 hotwater points) $320.00 3. Connect inlet & outlet piping for 02nos of basin FOC 4. Connect inlet & outlet piping for kitchen sinks & washing machine FOC 5. Supply labour to install 02 nos of basin & pedestal WC $400.00 6. Supply labour to install 01 no of central heater FOC 7. Supply labour to install accessories @ both bathrooms FOC Ceiling Work 1. Supply & install light box @ bedroom 02 $360.00 Painting Works 1. Supply & apply 03 coats of ICI / Nippon pentalite paints to walls, ceilings (max. 8 colors) $1,100.00 2. Supply & apply ICI gloss paint to all water piping, gates, doors, door frames & sewage pipes $300.00 Box-up piping work 1. Supply & construct cement board box up sewage piping @ both bathrooms $400.00 Glass works 1. Supply & install 03 panels sliding door shower screen with tempered glass @ common bathroom $560.00 2. Supply & install slim line tempered glass shower screen @ master bathroom $680.00 Miscellaneous 1. Supply & lay protection sheet before starting of renovation work FOC 2. Cleaning up whole unit with chemical $200.00 3. Clearing off debris on site FOC Custom Made build-in furnitures 1. Supply labour to varnish exisiting foyer shoe's cabinet & change exisiting seater cushion fabric $520.00 2. Design & fabricate feature wall cum bathroom entrance door @ master bedroom (max 3500mm L) $2,400.00 3. Design & fabricate dressing console @ master bedroom (max 900mm L) $880.00 4. Design & fabricate headboard panelling design with 02 nos of bedside console @ master bedroom (max 3000mm L) $2,800.00 5. Design & fabricate 02 panel wooden door @ common bathroom $580.00 6. Design & fabricate vanity cabinet with build-in mirror & solid surface top @ master bathroom (max 1200mm L) $1,400.00 7. Design & fabricate vanity cabinet with build-in mirror & solid surface top @ common bathroom $1,050.00 8. Supply & change existing wardrobe door panels @ bedroom 03 $850.00 Total $24160.00