Bro, need the following quote: 4A HDB 1) Labour for retile (overlay) of master bathroom wall and floor tiles - i will buy the tiles 2) Conceal all the pipes at master bathroom 3) Lay new pipes to allow for sink/shower points/wc 4) Remove old wc and reinstall new wc Kitchen 1) to build a old style tile kitchen top approx. 3 meters to house stove and sink (not sure if anyone does that anymore) Thanks! Lawrence