Wala43
Members-
Content Count
12 -
Joined
-
Last visited
Community Reputation
0 NeutralAbout Wala43
-
Rank
Bronze Member
Previous Fields
-
Gender
Male
Recent Profile Visitors
The recent visitors block is disabled and is not being shown to other users.
-
Hi bro, can u recommend me ceiling fan with light? Need it for my MBR & LR...TIA
- 1,959 replies
-
- led light
- chandelier
-
(and 5 more)
Tagged with:
-
Hi jerome, can u qoute for me kitchen sinks Rubine MODEL : ELX 610-85-BP? Is this undermount or top mount type of sinks?
- 2,319 replies
-
Bro can u qoute kitchen sink (ELKAY) EC-22105(single bowl) price?
- 2,319 replies
-
Ceiling Fans & Downlights...etc - Trusted Supplier Since 2011
Wala43 replied to bro's topic in Electronics & Electricals
Bro can qoute for me 7 plc downlight & T5 4feet 9pcs & T5 3feet 1pcs- 2,867 replies
-
- onsite visit
- installation
- (and 8 more)
-
Anyone know how much the price for elmark retractable?
-
Hi bro can share with me his package?
-
Ceiling Fans & Downlights...etc - Trusted Supplier Since 2011
Wala43 replied to bro's topic in Electronics & Electricals
Hi bro, can u qoute for me vento ceiling fan....- 2,867 replies
-
- onsite visit
- installation
- (and 8 more)
-
Hi zero, can u qoute for me Hob&hood (is ur promotion package still available $765)? Rinnai RB-712N(G) Rinnai RH-991CT Fridge (2 Door) Samsung RT45TSGL (dark blue glass) Washer Samsung WD0804 (washer & dryer) Samsung WF8692NEC Joven storage tank 25L Thanks
- 2,319 replies
-
Hi aron can u qoute for me any good brand system 1 for my mbr with installation...thanks
-
1 Design & Services: 1.1 Interior Design & Space planning. 1.2 Consultation of selecting home furnishing. 1.3 Perspective 3D computer drawings. 1.4 Decoration Advice. 1.5 Materials & Colours proposal & Selection 1.6 Site co-ordination & supervision 1.7 Application of HDB renovation permit 1.8 Application of Renovation Loan (all inluded) 2 Hacking & Demolition Works: 2.1 Supply labour and tool to hack away the following :- a) existing wrought iron door frame & vinyl door at bedroom 3 b) existing aluminium bi-fold door between kitchen & service balcony 2.2 Provide labour and tool to hack & demolish the following:- a) wall between master bedroom and bedroom 2 b) wall between kitchen and service balcony 2.3 Supply labour to haulage raw material(concrete & plaster sands,cements,tiles & corrugated paper)of mansory work upon completion respectively 2.4 Supply labour to debris removal raw material (concrete sand,cement,tiles & corrugated paper) of mansory work upon completion respectively TOTAL : $1500 3 Masonary & Tiling Works: 3.1 Supply labour,tool & material to make good cemented affected areas for the following:- a) between master bedroom and bedroom 3 (refer to item 2.2a) $300 b) between kitchen area and service balcony with wall & floor tiles replacement after hacking work (refer to 2.2b) $450 3.2 Supply labour,tool & material to construct 2ft full height concrete wall using 63mm hollow block & wire mesh c/w smooth plastering & wall tiles finishing for the following:- a) between kitchen area and service balcony $500 3.3 Supply labour,tool & material to lay heavy duty polished homogenous floor tile (600mm x 600mm) include skirting for the following:- a) living & dining Halls (approx.284sqft) $2250 b) main entrance foyer area (approx.30sqft) $240 c) passengeway to bedrooms (approx.22sqft) $180 3.4 Supply labour,tool & material to construct H50mm motar base with tiles finish on exposed area for the following:- a) kitchen cabinet (approx.10ft) $200 b) fridge $100 c) washing machine $100 d) shower area (common & master bathroom) $180 4 Plumbing Work: 4.1 Supply labour,tool & material to extend stainless steel pipe for kitchen sink $110 4.2 Supply labour & tool to install sanitary items for the followings:- a) kitchen sink & tap $100 b) 1 nos. storage heater $80 c)) 2 nos. shower accessories sets $60 d) 2 nos. bidet sprays & valves $50 5 Ceiling & Cornice Partition Works: 5.1 Supply labour,tool & material to install plaster fibre false ceiling with galvanised steel support for the following:- a) living & dining Halls (approx.284sqft) $820 b) main entrance foyer area (approx.30sqft) $90 c) passengeway to bedrooms (approx.22sqft) $70 5.2 Supply labour,tool & material to install fibre L-Box with light cove holder & galvanised steel support for the following:- a) living area (appox.24 per foot run) $280 5.3 Supply labour,tool & material to install gysum plaster partition board with galvanised steel support for the following:- a) master bedroom (approx.32sqft) (1sided surface) $300 b) bedroom 3 entrance (approx.21sqft) (2 sided surface) $400 6 Glass Work: 6.1 Supply labour,tool & material to install frameless tempered glass shower screen c/w 01 fix and 01 casement clear glass door for the following:- a) master bathroom $440 b) common bathroom $440 6.2 Supply labour,tool & material to fabricate & install 5mm(Thk) glass mirror backing (clear,black,tea) for the following:- a) living area (approx.48sqft) $680 7 Aluminium Work: 7.1 Supply labour,tool & material to install 3-way track silver color aluminium window grilles for the following:- a) living area (approx.34sqft) $240 b) master bedroom (approx.34sqft) $240 c) bedroom 2 (approx.26sqft) $180 d) bedroom 3 (approx.26sqft) $180 e) service balcony (approx.34sqft) $240 7.2 Supply labour,tool & material to install 3-way track beige color aluminium slliding window c/w clear glass for the following:- a) service balcony (approx.37sqft) $650 7.3 Supply labour,tool & material to install aluminium frame powder-coated Swing & Slide PD door with acrylic panel for the following:- a) master bathroom $390 b) common bathroom $390 8 Timber Floor Work: 8.1 Supply labour,tool & material to lay AC-5 high resistance water proof vinyl floor board for the following:- a) 3 bedrooms (approx.355sqft) $2500 9 Carpentry Work: Kitchen Area 9.1 Supply labour,tool & material to fabricate & install 18.5ft top hung & low kitchen cabinet c/w ABS edging for doors & drawers include the following:- a) stainless steel frame dishrack b) PVC cultery tray c) designer's handles d) 1 nos. of glass doors $2150 9.2 Supply labour,tool & material to install 8.5ft Solid Surface work-top c/w back-splash include opening of holes for cooker hob and kitchen sink for kitchen $680 Living Area 9.3 Supply labour,tool & material to fabricate & install (L)7.5ft full height built-in feature wall c/w access door to household shelter in combination of solid plywood laminate and stainless steel in-lay finishes $1440 9.4 Supply labour,tool & material to fabricate & install (L)7ft x (H)7ft height built-in T.V feature wall in combination of solid plywood laminate and stainless steel in-lay finishes $1200 9.5 Supply labour,tool & material to fabricate & install 6ft low built-in suspended console in combination of solid plywood laminate finishes $760 Dining Area 9.6 Supply labour,tool & material to fabricate & install approx.52 sqft 4" low height built-in platform in solid plywood laminate finishes $1000 Bedroom 3 Area 9.7 Supply labour,tool & material to fabricate & install 19.5ft full height walk-in wardrobe in solid plywood laminate finish c/w internal color polyken include the following:- a) hanging rods b) shelves c) 06 nos of drawers $4000 10 General Work 10.1 Supply labour,tool & material to chemical wash & general cleaning after mansory work & upon completion respectively $300 11 Electrical Work 11.1 Living/Dining,Main Foyer & Passengeway to bedroom area - Supply labour & tool to lay 09 nos.of New lighting points for down lightings on false ceiling $270 - Supply labour & tool to lay 08 nos.of New lighting points for L-Box light cove on false ceiling $240 - Supply labour & tool to install 17 nos.of light fittings points $170 - Supply labour,tool & lay 01 nos.of double power point (in conceal trunking) $100 - Supply labour,tool to install 01 nos of chandlier light fittings $60 - Supply labour,tool to install 01 nos of ceiling fan fittings $60 - Supply labour & tool to shift & relay location 01 nos of SCV point (in conceal trunking) $70 - Supply labour & tool to shift & relay location 01 nos of double point (in conceal trunking) $40 11.2 Kitchen & Service Balcony area - Supply labour,tool & install 03 nos.of light fittings points $30 11.3 Common Bathroom - Supply labour,tool & install 01 nos.of storage heater point $40 - Supply labour,tool & install 02 nos.of light fittings points $20 11.4 Master Bathroom - Supply labour,tool & install 02 nos of light fittings points $20 11.5 Master Bedroom - Supply labour & tool to shift & relay location 02 nos of lighting point (in conceal trunking) $120 - Supply labour,tool & install 03 nos.of light fittings points $30 11.6 Bedroom 2 - Supply labour,tool & install 01 nos.of light fittings points $10 11.7 Bedroom 3 - Supply labour & tool to shift & relay location 02 nos of lighting point (in conceal trunking) $120 - Supply labour,tool & install 02 nos.of light fittings points $20 11.8 Bomb shelter area - Supply labour,tool & install 01 nos.of light fittings points $10 GRAND TOTAL :$ 27,000