Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Wala43

Members
  • Content Count

    12
  • Joined

  • Last visited

Community Reputation

0 Neutral

About Wala43

  • Rank
    Bronze Member

Previous Fields

  • Gender
    Male

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

  1. Hi bro, can u recommend me ceiling fan with light? Need it for my MBR & LR...TIA
  2. Hi jerome, can u qoute for me kitchen sinks Rubine MODEL : ELX 610-85-BP? Is this undermount or top mount type of sinks?
  3. Anyone know how much the price for elmark retractable?
  4. Hi bro can share with me his package?
  5. Hi zero, can u qoute for me Hob&hood (is ur promotion package still available $765)? Rinnai RB-712N(G) Rinnai RH-991CT Fridge (2 Door) Samsung RT45TSGL (dark blue glass) Washer Samsung WD0804 (washer & dryer) Samsung WF8692NEC Joven storage tank 25L Thanks
  6. Hi aron can u qoute for me any good brand system 1 for my mbr with installation...thanks
  7. Hi everyone, anyone using Icon interior design or any feedback or review abt this id?
  8. 1 Design & Services: 1.1 Interior Design & Space planning. 1.2 Consultation of selecting home furnishing. 1.3 Perspective 3D computer drawings. 1.4 Decoration Advice. 1.5 Materials & Colours proposal & Selection 1.6 Site co-ordination & supervision 1.7 Application of HDB renovation permit 1.8 Application of Renovation Loan (all inluded) 2 Hacking & Demolition Works: 2.1 Supply labour and tool to hack away the following :- a) existing wrought iron door frame & vinyl door at bedroom 3 b) existing aluminium bi-fold door between kitchen & service balcony 2.2 Provide labour and tool to hack & demolish the following:- a) wall between master bedroom and bedroom 2 b) wall between kitchen and service balcony 2.3 Supply labour to haulage raw material(concrete & plaster sands,cements,tiles & corrugated paper)of mansory work upon completion respectively 2.4 Supply labour to debris removal raw material (concrete sand,cement,tiles & corrugated paper) of mansory work upon completion respectively TOTAL : $1500 3 Masonary & Tiling Works: 3.1 Supply labour,tool & material to make good cemented affected areas for the following:- a) between master bedroom and bedroom 3 (refer to item 2.2a) $300 b) between kitchen area and service balcony with wall & floor tiles replacement after hacking work (refer to 2.2b) $450 3.2 Supply labour,tool & material to construct 2ft full height concrete wall using 63mm hollow block & wire mesh c/w smooth plastering & wall tiles finishing for the following:- a) between kitchen area and service balcony $500 3.3 Supply labour,tool & material to lay heavy duty polished homogenous floor tile (600mm x 600mm) include skirting for the following:- a) living & dining Halls (approx.284sqft) $2250 b) main entrance foyer area (approx.30sqft) $240 c) passengeway to bedrooms (approx.22sqft) $180 3.4 Supply labour,tool & material to construct H50mm motar base with tiles finish on exposed area for the following:- a) kitchen cabinet (approx.10ft) $200 b) fridge $100 c) washing machine $100 d) shower area (common & master bathroom) $180 4 Plumbing Work: 4.1 Supply labour,tool & material to extend stainless steel pipe for kitchen sink $110 4.2 Supply labour & tool to install sanitary items for the followings:- a) kitchen sink & tap $100 b) 1 nos. storage heater $80 c)) 2 nos. shower accessories sets $60 d) 2 nos. bidet sprays & valves $50 5 Ceiling & Cornice Partition Works: 5.1 Supply labour,tool & material to install plaster fibre false ceiling with galvanised steel support for the following:- a) living & dining Halls (approx.284sqft) $820 b) main entrance foyer area (approx.30sqft) $90 c) passengeway to bedrooms (approx.22sqft) $70 5.2 Supply labour,tool & material to install fibre L-Box with light cove holder & galvanised steel support for the following:- a) living area (appox.24 per foot run) $280 5.3 Supply labour,tool & material to install gysum plaster partition board with galvanised steel support for the following:- a) master bedroom (approx.32sqft) (1sided surface) $300 b) bedroom 3 entrance (approx.21sqft) (2 sided surface) $400 6 Glass Work: 6.1 Supply labour,tool & material to install frameless tempered glass shower screen c/w 01 fix and 01 casement clear glass door for the following:- a) master bathroom $440 b) common bathroom $440 6.2 Supply labour,tool & material to fabricate & install 5mm(Thk) glass mirror backing (clear,black,tea) for the following:- a) living area (approx.48sqft) $680 7 Aluminium Work: 7.1 Supply labour,tool & material to install 3-way track silver color aluminium window grilles for the following:- a) living area (approx.34sqft) $240 b) master bedroom (approx.34sqft) $240 c) bedroom 2 (approx.26sqft) $180 d) bedroom 3 (approx.26sqft) $180 e) service balcony (approx.34sqft) $240 7.2 Supply labour,tool & material to install 3-way track beige color aluminium slliding window c/w clear glass for the following:- a) service balcony (approx.37sqft) $650 7.3 Supply labour,tool & material to install aluminium frame powder-coated Swing & Slide PD door with acrylic panel for the following:- a) master bathroom $390 b) common bathroom $390 8 Timber Floor Work: 8.1 Supply labour,tool & material to lay AC-5 high resistance water proof vinyl floor board for the following:- a) 3 bedrooms (approx.355sqft) $2500 9 Carpentry Work: Kitchen Area 9.1 Supply labour,tool & material to fabricate & install 18.5ft top hung & low kitchen cabinet c/w ABS edging for doors & drawers include the following:- a) stainless steel frame dishrack b) PVC cultery tray c) designer's handles d) 1 nos. of glass doors $2150 9.2 Supply labour,tool & material to install 8.5ft Solid Surface work-top c/w back-splash include opening of holes for cooker hob and kitchen sink for kitchen $680 Living Area 9.3 Supply labour,tool & material to fabricate & install (L)7.5ft full height built-in feature wall c/w access door to household shelter in combination of solid plywood laminate and stainless steel in-lay finishes $1440 9.4 Supply labour,tool & material to fabricate & install (L)7ft x (H)7ft height built-in T.V feature wall in combination of solid plywood laminate and stainless steel in-lay finishes $1200 9.5 Supply labour,tool & material to fabricate & install 6ft low built-in suspended console in combination of solid plywood laminate finishes $760 Dining Area 9.6 Supply labour,tool & material to fabricate & install approx.52 sqft 4" low height built-in platform in solid plywood laminate finishes $1000 Bedroom 3 Area 9.7 Supply labour,tool & material to fabricate & install 19.5ft full height walk-in wardrobe in solid plywood laminate finish c/w internal color polyken include the following:- a) hanging rods b) shelves c) 06 nos of drawers $4000 10 General Work 10.1 Supply labour,tool & material to chemical wash & general cleaning after mansory work & upon completion respectively $300 11 Electrical Work 11.1 Living/Dining,Main Foyer & Passengeway to bedroom area - Supply labour & tool to lay 09 nos.of New lighting points for down lightings on false ceiling $270 - Supply labour & tool to lay 08 nos.of New lighting points for L-Box light cove on false ceiling $240 - Supply labour & tool to install 17 nos.of light fittings points $170 - Supply labour,tool & lay 01 nos.of double power point (in conceal trunking) $100 - Supply labour,tool to install 01 nos of chandlier light fittings $60 - Supply labour,tool to install 01 nos of ceiling fan fittings $60 - Supply labour & tool to shift & relay location 01 nos of SCV point (in conceal trunking) $70 - Supply labour & tool to shift & relay location 01 nos of double point (in conceal trunking) $40 11.2 Kitchen & Service Balcony area - Supply labour,tool & install 03 nos.of light fittings points $30 11.3 Common Bathroom - Supply labour,tool & install 01 nos.of storage heater point $40 - Supply labour,tool & install 02 nos.of light fittings points $20 11.4 Master Bathroom - Supply labour,tool & install 02 nos of light fittings points $20 11.5 Master Bedroom - Supply labour & tool to shift & relay location 02 nos of lighting point (in conceal trunking) $120 - Supply labour,tool & install 03 nos.of light fittings points $30 11.6 Bedroom 2 - Supply labour,tool & install 01 nos.of light fittings points $10 11.7 Bedroom 3 - Supply labour & tool to shift & relay location 02 nos of lighting point (in conceal trunking) $120 - Supply labour,tool & install 02 nos.of light fittings points $20 11.8 Bomb shelter area - Supply labour,tool & install 01 nos.of light fittings points $10 GRAND TOTAL :$ 27,000
×