Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

triton

Members
  • Content Count

    27
  • Joined

  • Last visited

Everything posted by triton

  1. Hi fellow talk member, I am been a follower of renotalk. Recently we have chat with ID. I think the design said that using mirror and glass will make the design more expensive. Our is a 4 room standard flat Based On WET WORKS LIVING / DINING ROOM Supply Labour & Materials To Lay 600mm x 600mm Homogeneous Floor Tiles 436 sqft 3,270.00 > Selection of Tiles: Up to $3.50 psf > Includes: Skirting using Cut Tiles 3x BEDROOMS Supply Labour & Materials To Lay 800mm x 800mm Homogeneous Floor Tiles 524 sqft 3,930.00 > Selection of Tiles: Up to $3.50 psf > Includes: Skirting using Cut Tiles KITCHEN / YARD Construct Tiled Cement Base (Sides Only) for Kitchen Cabinets 1 unit 180.00 Construct Tiled Cement Base for Refrigerator 1 unit 100.00 Construct Tiled Cement Base for Washing Machine 1 unit 100.00 COMMON TOILET Supply Labour & Materials To Over-Lay Homogeneous Wall Tiles 1 area 850.00 > Selection of Tiles: Up to $2.50 psf > Excludes: Border/Special Tiles Construct Tiled Cement Shower Kerb 1 area 150.00 MASTER TOILET Supply Labour & Materials To Over-Lay Homogeneous Wall Tiles 1 area 850.00 > Selection of Tiles: Up to $2.50 psf > Excludes: Border/Special Tiles Construct Tiled Cement Shower Kerb 1 area 150.00 CEILING WORKS Construct False Ceiling/Light Boxes/ Light Holders **** Room, Dinning Room & Passage Way Area 3 areas 1,200.00 Construct False Ceiling/Light Boxes/ Light Holders At Master Bedroom Area 1 area 950.00 Construct Curtain Pelmet **** Room (Window Areas) 1 unit 150.00 Construct Curtain Pelmet At Master Bedroom (Window Areas) 1 unit 150.00 CARPENTRY WORKS NOTE: Unless otherwise stated, all Carpentry Works quoted herein are constructed using Solid Plywood w/ Laminate/Veneer Finishes only. Where design/specifications include materials other than Solid Plywood w/ Laminate/Veneer Finishes, relevant charges will apply subject to further quotation(s) & confirmation. BOMB SHELTHER (STORE ROOM) Supply Labour & Materials To Install Designed Feature Door c/w Tea Mirror Finishing As Per Design Proposed 8 feet 2,360.00 LIVING ROOM Supply Labour & Materials To Install Designed Feature Wall c/w Laminate & Tea Mirror Finishing As Per Design Proposed 9 feet 2,250.00 Supply Labour & Materials To Install Designed TV Console c/w Laminate & Tea Mirror Clad With Drawers As Per Design Proposed 8 feet 960.00 KITCHEN Supply Labour & Materials To Install Built-In Kitchen Cabinets - High-Quality Laminate Doors w/ ABS Trimmings (Internal: Colour Polykern)39 ft run 4,290.00 > Includes: Choice from FULL RANGE of LAMITAK 2008/09 Laminates (Latest) (Excludes: Metallic Laminates) > Includes: Selected Designer Handles/Knobs > Includes: 1 Pc Aluminium-Framed Frosted Glass Door > Includes: 1 Set Drip-Dry Dish Rack Supply Labour & Materials To Install Built-In Tall Unit Kitchen Cabinet - High-Quality Laminate Doors w/ ABS Trimmings (Internal: Colour Polykern) 2 feet 540.00 Supply Labour & Materials To Install Granite Surface Top 17 ft run 1,870.00 > Includes: Standard Back-Splash & Front-Edge Profiling Add-On: Undermounting of Kitchen Sink 1 unit 80.00 MASTER BEDROOM Supply Labour & Materials To Install Built-In Full-Height Wardrobe w/ Laminate & Aluminum-Frame Frosted Glass/Mirror Silding Doors As Per Design Proposed (Interior: White Polykem) 12 feet 3,240.00 Supply Labour & Materials To Install Designed TV Console c/w Laminate & Tea Mirror Clad With Drawers As Per Design Proposed 5 feet 600.00 Supply Labour & Materials To Install Designed Full-Height Feature Wall Cum Bed-Head c/w Imported Fabric Or PVC Cushion Finishing As Per Design Proposed 9 feet 2,655.00 Supply Labour & Materials To Install Bedside Table 2 units 500.00 BEDROOM 2 Supply Labour & Materials To Install Built-In Full-Height Wardrobe w/ Laminate & Aluminum-Frame Frosted Glass/Mirror Silding Doors As Per Design Proposed (Interior: White Polykem) 7 feet 1,890.00 BEDROOM 3 Supply Labour & Materials To Install Built-In Full-Height Wardrobe w/ Laminate & Aluminum-Frame Frosted Glass/Mirror Silding Doors As Per Design Proposed (Interior: White Polykem) 7 feet 1,890.00 MASTER TOILET Supply Labour & Materials To Install Suspended Bottom Vanity Cabinets, Full-Length Mirror & Top Cabinets w/ Light Pelmet (Excludes: Light Fittings) 4 feet 720.00 Supply Labour & Materials To Install CRESTO Solid Surface Top (for Vanity Top) (Includes: Additional Height for Back-Splash & Front-Edge Profiling) 4 feet 340.00 COMMON TOILET Supply Labour & Materials To Install Suspended Bottom Vanity Cabinets 4 feet 560.00 Supply Labour & Materials To Install CRESTO Solid Surface Top (for Vanity Top) (Includes: Additional Height for Back-Splash & Front-Edge Profiling) 4 feet 340.00 LAMINATE FLOORING Supply Labour & Materials To Install BERRY Laminate Flooring At Master Bedroom As Per Design Proposed (Includes: Skirting) 91 sqft 720.00 Construct Raised 6 inch Platform w/ Timber Structure At Master Bedroom (Subject to Min. 100 sq feet) 91 sqft 720.00 GLASS WORKS Supply Labour & Materials To Install SandBlast Tempered Glass Swing Door (10mm) At Kitchen Entrance 1 unit 850.00 Supply Labour & Materials To Install SandBlast Tempered Glass Backing At Kitchen Wall Area 1 unit 650.00 DOORS, SCREENS & WINDOWS ROOM DOORS / PD DOORS Supply Labour & Materials To Install Venner Door C/w Lock Set For 3x Bedrooms & 2x Toilet Entrance Areas 5 nos. 1,500.00 SHOWER SCREENS Supply Labour & Materials To Install Frameless Tempered Glass Sliding Shower Screen (Includes: Tower/Hand-Rail) At Common Toilet Area 1 unit 850.00 Supply Labour & Materials To Install Frameless Tempered Glass Shower Screen (Includes: Tower/Hand-Rail) At Master Toilet Area 1 unit 580.00 WINDOWS / GRILLS Supply Labour & Materials To Install Aluminium Sliding Windows Grills (Powder-Coated) **** Room, 3x Bedrooms, Kitchen Yard Window & Grills 4 areas 2,500.00 PLUMBING WORKS Labour to Install Shower Mixer & Shower Set 2 nos. 140.00 Labour to Install Toilet Wash Basin & Mixer 2 nos. 240.00 Labour to Install Bathroom Accessories (5 pcs) 2 nos. 160.00 Labour to Install Central Water Heater 1 nos. 150.00 Labour to Install Kitchen Sink & Mixer 1 nos. 120.00 PAINTING WORKS Painting Works for Whole House 1 area 1,200.00 > FULL RANGE of Paints from DULUX/NIPPON > Note: Painting Works is Subject to Max. of 2-3 Coats. Any additional coat(s) OR surface preparation required due to condition of wall(s) will be charged based on On-Site Assessment. OTHER WORKS Supply & Laying of Floor Protection w/ Corrugated Paper (Single Layer) 1 area 300.00 Washing of Whole House (General Cleaning) 1 area 250.00 Haulage of New & Raw Materials 1 area 300.00 Clearing of Debris 1 area 300.00 Any renotalk member care to comment ?
  2. Dear Sir, I am about to renovate my 4 room in ponggol .I wanted a comfortable place. I am quite comfortable with ID designer. Now my ID have give me a quote. But I am not sure it is too expensive. Based On WET WORKS LIVING / DINING ROOM Supply Labour & Materials To Lay 600mm x 600mm Homogeneous Floor Tiles 436 sqft 3,270.00 > Selection of Tiles: Up to $3.50 psf > Includes: Skirting using Cut Tiles 3x BEDROOMS Supply Labour & Materials To Lay 800mm x 800mm Homogeneous Floor Tiles 524 sqft 3,930.00 > Selection of Tiles: Up to $3.50 psf > Includes: Skirting using Cut Tiles KITCHEN / YARD Construct Tiled Cement Base (Sides Only) for Kitchen Cabinets 1 unit 180.00 Construct Tiled Cement Base for Refrigerator 1 unit 100.00 Construct Tiled Cement Base for Washing Machine 1 unit 100.00 COMMON TOILET Supply Labour & Materials To Over-Lay Homogeneous Wall Tiles 1 area 850.00 > Selection of Tiles: Up to $2.50 psf > Excludes: Border/Special Tiles Construct Tiled Cement Shower Kerb 1 area 150.00 MASTER TOILET Supply Labour & Materials To Over-Lay Homogeneous Wall Tiles 1 area 850.00 > Selection of Tiles: Up to $2.50 psf > Excludes: Border/Special Tiles Construct Tiled Cement Shower Kerb 1 area 150.00 CEILING WORKS Construct False Ceiling/Light Boxes/ Light Holders **** Room, Dinning Room & Passage Way Area 3 areas 1,200.00 Construct False Ceiling/Light Boxes/ Light Holders At Master Bedroom Area 1 area 950.00 Construct Curtain Pelmet **** Room (Window Areas) 1 unit 150.00 Construct Curtain Pelmet At Master Bedroom (Window Areas) 1 unit 150.00 CARPENTRY WORKS NOTE: Unless otherwise stated, all Carpentry Works quoted herein are constructed using Solid Plywood w/ Laminate/Veneer Finishes only. Where design/specifications include materials other than Solid Plywood w/ Laminate/Veneer Finishes, relevant charges will apply subject to further quotation(s) & confirmation. BOMB SHELTHER (STORE ROOM) Supply Labour & Materials To Install Designed Feature Door c/w Tea Mirror Finishing As Per Design Proposed 8 feet 2,360.00 LIVING ROOM Supply Labour & Materials To Install Designed Feature Wall c/w Laminate & Tea Mirror Finishing As Per Design Proposed 9 feet 2,250.00 Supply Labour & Materials To Install Designed TV Console c/w Laminate & Tea Mirror Clad With Drawers As Per Design Proposed 8 feet 960.00 KITCHEN Supply Labour & Materials To Install Built-In Kitchen Cabinets - High-Quality Laminate Doors w/ ABS Trimmings (Internal: Colour Polykern) 39 ft run 4,290.00 > Includes: Choice from FULL RANGE of LAMITAK 2008/09 Laminates (Latest) (Excludes: Metallic Laminates) > Includes: Selected Designer Handles/Knobs > Includes: 1 Pc Aluminium-Framed Frosted Glass Door > Includes: 1 Set Drip-Dry Dish Rack Supply Labour & Materials To Install Built-In Tall Unit Kitchen Cabinet - High-Quality Laminate Doors w/ ABS Trimmings (Internal: Colour Polykern) 2 feet 540.00 Supply Labour & Materials To Install Granite Surface Top 17 ft run 1,870.00 > Includes: Standard Back-Splash & Front-Edge Profiling Add-On: Undermounting of Kitchen Sink 1 unit 80.00 MASTER BEDROOM Supply Labour & Materials To Install Built-In Full-Height Wardrobe w/ Laminate & Aluminum-Frame Frosted Glass/Mirror Silding Doors As Per Design Proposed (Interior: White Polykem) 12 feet 3,240.00 Supply Labour & Materials To Install Designed TV Console c/w Laminate & Tea Mirror Clad With Drawers As Per Design Proposed 5 feet 600.00 Supply Labour & Materials To Install Designed Full-Height Feature Wall Cum Bed-Head c/w Imported Fabric Or PVC Cushion Finishing As Per Design Proposed 9 feet 2,655.00 Supply Labour & Materials To Install Bedside Table 2 units 500.00 BEDROOM 2 Supply Labour & Materials To Install Built-In Full-Height Wardrobe w/ Laminate & Aluminum-Frame Frosted Glass/Mirror Silding Doors As Per Design Proposed (Interior: White Polykem) 7 feet 1,890.00 BEDROOM 3 Supply Labour & Materials To Install Built-In Full-Height Wardrobe w/ Laminate & Aluminum-Frame Frosted Glass/Mirror Silding Doors As Per Design Proposed (Interior: White Polykem) 7 feet 1,890.00 MASTER TOILET Supply Labour & Materials To Install Suspended Bottom Vanity Cabinets, Full-Length Mirror & Top Cabinets w/ Light Pelmet (Excludes: Light Fittings) 4 feet 720.00 Supply Labour & Materials To Install CRESTO Solid Surface Top (for Vanity Top) (Includes: Additional Height for Back-Splash & Front-Edge Profiling) 4 feet 340.00 COMMON TOILET Supply Labour & Materials To Install Suspended Bottom Vanity Cabinets 4 feet 560.00 Supply Labour & Materials To Install CRESTO Solid Surface Top (for Vanity Top) (Includes: Additional Height for Back-Splash & Front-Edge Profiling) 4 feet 340.00 LAMINATE FLOORING Supply Labour & Materials To Install BERRY Laminate Flooring At Master Bedroom As Per Design Proposed (Includes: Skirting) 91 sqft 720.00 Construct Raised 6 inch Platform w/ Timber Structure At Master Bedroom (Subject to Min. 100 sq feet) 91 sqft 720.00 GLASS WORKS Supply Labour & Materials To Install SandBlast Tempered Glass Swing Door (10mm) At Kitchen Entrance 1 unit 850.00 Supply Labour & Materials To Install SandBlast Tempered Glass Backing At Kitchen Wall Area 1 unit 650.00 DOORS, SCREENS & WINDOWS ROOM DOORS / PD DOORS Supply Labour & Materials To Install Venner Door C/w Lock Set For 3x Bedrooms & 2x Toilet Entrance Areas 5 nos. 1,500.00 SHOWER SCREENS Supply Labour & Materials To Install Frameless Tempered Glass Sliding Shower Screen (Includes: Tower/Hand-Rail) At Common Toilet Area 1 unit 850.00 Supply Labour & Materials To Install Frameless Tempered Glass Shower Screen (Includes: Tower/Hand-Rail) At Master Toilet Area 1 unit 580.00 WINDOWS / GRILLS Supply Labour & Materials To Install Aluminium Sliding Windows Grills (Powder-Coated) **** Room, 3x Bedrooms, Kitchen Yard Window & Grills 4 areas 2,500.00 PLUMBING WORKS Labour to Install Shower Mixer & Shower Set 2 nos. 140.00 Labour to Install Toilet Wash Basin & Mixer 2 nos. 240.00 Labour to Install Bathroom Accessories (5 pcs) 2 nos. 160.00 Labour to Install Central Water Heater 1 nos. 150.00 Labour to Install Kitchen Sink & Mixer 1 nos. 120.00 PAINTING WORKS Painting Works for Whole House 1 area 1,200.00 > FULL RANGE of Paints from DULUX/NIPPON > Note: Painting Works is Subject to Max. of 2-3 Coats. Any additional coat(s) OR surface preparation required due to condition of wall(s) will be charged based on On-Site Assessment. OTHER WORKS Supply & Laying of Floor Protection w/ Corrugated Paper (Single Layer) 1 area 300.00 Washing of Whole House (General Cleaning) 1 area 250.00 Haulage of New & Raw Materials 1 area 300.00 Clearing of Debris 1 area 300.00 Thank you fellow renotalk member . Care to comment
×