Feniz
Members-
Content Count
31 -
Joined
-
Last visited
Community Reputation
0 NeutralAbout Feniz
-
Rank
Bronze Member
Previous Fields
-
Gender
Male
-
I have been staying at my new place for ard 1 week after my Reno is complete. Everything g is good. I'm glad I engage Ronald as he had promptly arrange everythin thru out the process. Happy smooth Reno for those who had engage him.
-
Everythin is done now. Just waiting for the door man to paint the door n fix the lock n tats it. My Reno process have been quite smooth going thanks to Ronald coordination n supervision .It's been a good time working with him these few weeks.
-
Hi,Yes the contractor is tiler seng from the designer house u mention. Happy reno
-
Hi, his contact is 82008901Ronald
-
Kitchen cabinet up.Manage to source 2 banga painter @ $350 to paint the whole house. Use my paint.1 coat sealer 2 coat paint. Not a bad deal I think. Start tmr. Alrdy Reply those who pm me for the contractor nos.I leave his nos here as I dun log in tat much Liao. 82008901Ronald
-
Can I have ur painter contact? Thks!
-
Hi..can send ur painter contact pls. Thks
-
Rewiring n plumber all done! AIrcon up too. Next come the kitchen cabinet. So far so good!Waiting for plaster to dry then DIY painting . (siong Liao)
-
Gonna start painting in 2 wks time, can any1 intro any painter where I supply the paint. Thanks!
-
Just mosiac tile above the kitchen cabinet as backsplash, maybe 1/3 of the wall only as I seldom cook.Cement screed kitchen the rest of the house plaster. I dunno how to put pics here n I didn't take much pic.If u wan to see u can go up my place tmr as I be there for the electrical n plumping.
-
Plastering n cement skimming all done....next comes rewiring n change pipes.
-
Hacking complete, tiling for both rooms r done.Kitchen cement skimming halfway thru...