Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Saly

Members
  • Content Count

    8
  • Joined

  • Last visited

Everything posted by Saly

  1. He took over my tiling works for kitchen and 2 toilets and took more then a month to complete. Supplied only 1 china worker and he only came down to supervise when we went berserk and complaint. Workmanship, very bad. On the last day of completion, he did a touch up at a bottom of my sink and the next hour he did a chemical wash! The cement was washed away. Thanks to his stupidity. I cldnt say more as i want him to finish up his tile works and get lost. And i did not pay the balance $500 because he delayed more than 1 week just to do the tile works.
  2. It leaves water mark easily esp after toothbrushing. I always had my scrub sponge near my basin..
  3. Hi All, A friend got thia package for me Wc 203 A 2set, 707 heater 1set, artistic basin 1 set, basin tap 1 set, glass basin, basin waste 2 pcs, basin trap 2pcs, basin tap 1pc normal, two way tap for shower for both toilet n 150 flexible hose 2 point for the shower tap... Total $1600... All are baron brand... Install n fix and 1year warranty... Are these a good deal? On average how much does it cost to get the sanitary fittings done.. Not too branded not too cheapo just durable and yet affordable. 10q
  4. Things NEED to be done: Kitchen works- Solid work top for kitchen cabinet Repair tiles at sink area Hack wall tiles and retiling Overlay of floor tiles Piping & plumbing Toilets- Hack wall tiles and retiling Overlay of floor tiles Piping n plumbing Shower curb n screen at MBT Vanity cupboard with solid surface at MBT Accessories & sanitaries Living room- L-box with cove lightings Laminate flooring Bedrooms- L-box with cove lightings for MBR Simple cornices for common rooms Laminate flooring Build in wardrobe for MBR Rewiring n painting for whole house Estimated damage: $25k We had selected the tiles for our toilets: and for our kitchen as well: It took us 4hrs to choose the tiles as we have a budget constraint...
  5. Kitchen: Our 3 yrs old cabinet no space to place our appliances MBR
  6. We were the 3rd owner of the 4a room flat in Jurong West St 71. Back then we had not much of moolah to do what others did for their house and we don't like to have any loans either. Therefore, we have been putting up with hairline cracks forming in the kitchen and toilet wall tiles, stained kitchen flooring. No cornices in the bedrooms, the ancient greek pillars in living room, roundish faux ceiling in kitchen entrance and many other flaws.. After a deep thought and some cash we decided to do some facelifts to our tired homme...
×