

MrsLoo
Members-
Content Count
385 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by MrsLoo
-
Yes. My washing machine will be in front of the rubbish chute. Mine is a front load and due to space constraint, the door will be facing out which means facing the toilet.
-
Ya lah...My husband called them, they have laid the cables but still pending loh...They said only next year then install.
-
I have been waiting for the promotion loh and luckily because Courts and Gain City can't hold stock that long, I waited till Nov then Harvey Norman got this promotion. 4 piece sets and somemore got 2 freebies, a standing mixer and electric kettle.
-
Haha. All thanks to my hubby lah. He is IT mah so he requested a tall cabinet to put all his IT stuffs like router, modem, etc etc and also a hole for future optics fibre to install in there....I also don't know. even my MBR also become digital TV loh, got composite cables, network cables, HDMI cables..... The bottom shelves will be mine, all my shoes.Hahaha
-
Hahaha....so fast tired of ur reno le huh? Actually I wanted smaller slits but I think they don't have capability to cut the laminate, anyway still acceptable lah. As for my TV console, I also think maybe 2 yrs down the road I will change to a red color one, else my living hall too white already, no life. Actually I also don't know what are the advantage of pole system but the price is double. After seeing the quotation, I nearly freaked out, that's why use the money to make other cabinets instead.
-
PM you already.
-
Here's the trick. I notice the gap on the kitchen cabinet. How they going to fill the gap huh? Or it is not important? Because I think the gap quite big leh.
-
My son's wardrobe- same as mine, only different direction. Too lazy to think of another design. This is last min add-on due to the stupid pillar at the corner, can't fit the bedframe nicely so custom-made the whole stretch instead.
-
See the crack. I think is because they change the switch due to the additional down lights
-
My wardrobe - traditional type because can't afford pole system. Initially, I only use 2 tracks but my contractor told me that the room is too romantic, so I add in another 3 LED downlights. My chest drawers to put my barang No place to put console, so we made a full height cabinet to put the SCV box and stuffs.
-
Store room. Saw the YALE lock for every doors. Electrolux hobs, hood, oven and microwave
-
Went up to unload my vacuum cleaner so that the worker can help me to tidy up the window grills. Here's the updates: Shoe Cabinet + Mini 'Server room' A little exposure on the living floor because the main door is up and Friday the digital lock guy coming to install. Ok, front view of my little TV console. A little bit regret, should make it long and slim instead.
-
Mine also paint first then install. Luckily they co-ordinate, mine the false ceiling also no need to cut one hole to fit the aircon, swee swee, the aircon just below the false ceiling. The bad thing is my TV console is up but I have not paint my Momento.
-
Our First Home At Cck
MrsLoo replied to kim76's topic in Reno t-Blog Chat - HDB Resale Renovation & Interior Design
Wau, kim, I die le, see ur posting on how to shop in Amazon, I think my pocket holes will be getting bigger. Haha. -
Ya, at least the carpentry is a bonus to me, everything in place nicely. My contractor gave all the drawings to them first then after they fabricate all then send in together at least with this kind of progress, we can get in earlier. I already told him that I need at least the bedrooms to be ready first so that I can lock when all my appliances arrive next week. And luckily, all the laminate colors turned out to be good. Because all my laminates are lines with woody texture.
-
BLUM Hinges for all the carpentry Door for bedrooms
-
Wardrobe sliding door for both bedrooms Some exposure of my Kronotex flooring. Love the planks but I feel that the workmanship can be better and they forgotten about my freebies. Must scold them already. First, forgotten about the skirting, then now forgotten about my freebies.
-
Blanco Sink - This is top mount, now the last part will be waiting for Caesarstone top to come. Rubbish Chute and IKEA shelf
-
My Kitchen - I think this is the best part of the renovation that I'm very happy with.
-
Today went up to see the renovation, at least something happy to see. Main door - Sponsored by contractor Hubby want to get the SamSung digital lock so will have that install. TV console in living room. After seeing it, then hubby said the length too short. Initially I want to stretch up to 1.8m but he don't want and insist 1.5m. Good lah, now the console look so small on a 2.4m wall. The best part is, how am I going to paint my Momento? The painter uncle already so old liao, I wonder how he going to touch up without 'damaging' the carpentry.
-
Then I must buy already. I'm lao gao. Strike already then my renovation become FOC.
-
Better buy 7788, wait later come out first prize, then heartache.
-
Y need to bring physical stuffs for measurement?? My contractor just took the dimension from the catalog and then send the drawings to the carpentry. My carpentry will come this week and hobs come tomorrow, then he said all will be fitted to the cabinet.
-
Ya, that's what my contractor told me too. He will do everything and after they lay the kitchen top then he will put the kitchen sink (mine is top mount). Hopefully everything can go smoothly as planned. This week, he said all my carpentry will go up and install my hoods, hobs, oven etc. Then wash the floor again then next week fix my towel racks etc then repaint again. My only concern is my TV, fridge n washing machine will deliver on 28th Dec, I don't by then my flooring ready or not, else headache when the worker need to wash the floor.
-
Won't the place be messy? I don't want to compromise to other color because I think I'm going to face it for long but hubby seems don't want to wait for the stock to come and Caesarstone can only install on 7th Jan, that's what I thought too, finish all the rest of the house, the most put the fridge in the living room first. Just that later I need to wash the house in a more tedious way with all the furnishing in.