  1. after the wardrobe is done they move on to the bed wall follow by the bed. love the color- 50 shades darker than grey- lol under the bed are the storage... drawer at the front and the sides as well as acces from the top.
  2. recap on my earlier drawing on the master bedroom with wardrobe dividing the bath room. actual on site installation installation of the walkin wardrobe the front side and the cabinet access from bathroom due to the space... have to sliding foor
  3. the whole lot Tap, fittings, shower set... WC corner basin for master bathroom kitchen sink
  4. the 6th day the order from Hoe Kee came... lucky about to catch it just after my lunch.
  5. never even borther to site measurement..... thats really too much allowance from the beam to the cabinet. is that your existing toilet...// I must say workmanship is really bad... look at the gap between tile.... so uneven. really sorry i see in this state. how did you get this guy??? what is the scope of work? and how much he quoted? just post his name and company big big can leow. you over the tiles?
  6. Fifth day.... completed all walls at the kitchen bathroom. and started the master bathroom... I guess due to the size of the bath room... anytime only one person can work. one man show....
  7. What to do...... old flat bathroom is really tiny... got to squeeze every space. at least the kitchen bath room is little bigger. yes I am puting mirror at the 90 corner both side of the corner wall.. No set back. tiles from Lian Seng Hin.
  8. fourth day of bathroom work.... today is slow... chop off all the ugly air vent. laid the other side of the wall... love the feature wall
  9. enough la... to brush teeth only/ cos i one person using only... looks something like this hahahahahaha u have same big tummy like me>?
  10. hang in there..... be cool. i understand how u feel....
  11. as of today.... the 3rd day the floor has been waterproofed, and screed and prepare of laying of the tiles.... one side of the kitchen wall is up too
  12. kitchen bathroom also hacked and cleared at 4pm even the tiles and cement have also bought up on the first date.
  13. and at the carpenter side.... done the bed frames..... but did wrong on the inner wall color.... as I want all grey as mention to them earlier...
  14. the cement stuff and the tiles has landed the works still continue up stairs
  15. This morning starts to hack.... Before hacking,,,, they layout protection sheet to the floor.. update more later
  16. ha ha ha i guess I have a fat tummy ... the depth of the front sink cant fit in front of the WC.... end up to fit a corner sink....
  17. keep the picture coming..... love the grey wall and the tiles.....
×