Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

hoaili

Members
  • Content Count

    202
  • Joined

  • Last visited

  • Days Won

    2

Everything posted by hoaili

  1. Divider at Foyer (view from main entrance) Uploaded with ImageShack.us View from Living Room Uploaded with ImageShack.us L-shape shoe cabinets - long and big ! Uploaded with ImageShack.us Uploaded with ImageShack.us Divider between Living and Dining area, behind this divider will be full height mirror (pending installation) Uploaded with ImageShack.us
  2. 11 Oct 2012 to 12 Oct 2012 - Updates on Carpentry Work Prince's room completed Left side of the room Uploaded with ImageShack.us Reccess area at the right side of the room Uploaded with ImageShack.us Princess' room completed - Big big wardrobe with full height mirror for a 11 year-old girl ! Uploaded with ImageShack.us Study table and shelving (picture taken from the reflection of the mirror) Uploaded with ImageShack.us TV console and feature wall - love the wood grain, so natural ! Uploaded with ImageShack.us
  3. Are you referring to invisible window grilles ? If yes, not advisable. The maximum weight that this type of grilles is low and it is not as firm as aluminum grilles. To me, safely is extremely important especially we have young kids at home. I will spend a little more to get a secure and firm grilles to protect my children.
  4. There is one type that mount on walls instead of ceiling, L-shape. Can try to check on hardware shop.
  5. Going to move to new house only on 24 Oct. My ID and contractor will help me to dismantle the bed frame and bring to new house before moving for Interior fixing. Currently is a walk in wardrobe, so, no need to dismantle but got 1 normal wardrobe and 2 chest drawers cabinet which require no dismantle. I did asked Sunny will he dismantle the bed frame for me ( before my ID said she will help me dismantle the bed frame) and he said yes, but not those furniture from Ikea. He said it is difficult to assemble the furniture after dismantling due to low quality of Ikea furniture.
  6. Thanks bro Casa ! More pics coming up !
  7. Yes, this is the quote I gotten from Sunny as well, except I do not need them to dismantle bed frame and wardrobe.
  8. Kudos to the carpenters who carried the doors that covers the bomb shelter and walkway to bedrooms in 2 trips consecutively from level 1 to level 15 :bow: Wooden door for walkway Uploaded with ImageShack.us Wooden door for bomb shelter Uploaded with ImageShack.us Kitchen is the first area to be fixed ! Uploaded with ImageShack.us The painter is preparing the wall at bomb shelter area for my ID to create "special effect" personally. Can't wait to see the end result Uploaded with ImageShack.us
  9. Carpentry are all here ! Saw the truck parked at the loading bay since 8.45am. The driver told me he start driving from JB at 7am ! When the carpenters arrived, they unload the stuff and brought up to 15 floor, the process took them 2 hours. Now the house is like a battlefield, carpentry everywhere ! Uploaded with ImageShack.us Uploaded with ImageShack.us Uploaded with ImageShack.us Uploaded with ImageShack.us Uploaded with ImageShack.us
  10. 10 Oct 2012 Opennet staff came at 9am to instal the Terminal Point. The TP was installed at the Study Room instead of Living Room, pay $33 for extra 5 meter cabling. Uploaded with ImageShack.us Water closets and Instant Water Heaters for MBR Toilet and Common Toilet are up ! MBR Toilet - Roz 1 piece WC and 707 Princeton Uploaded with ImageShack.us Common Toilet - Roz 2 WC and 707 Protek Uploaded with ImageShack.us Uploaded with ImageShack.us
  11. Looks like I made the right choice by engaging The Helping Hand for my house moving on 24 Oct. Have contacted Soon Seng Transport and KNT Movers, both quoted me $650 and $680 respectively. The Helping Hand came and a quote was made by Sunny on the spot -$280 for full load of a 14ft truck. Shall comment after I moved to the new house.
  12. Hi Sygnur Thanks for dropping by ! Yap, my ID is creative ! She propose something different from others and fell in love with her ideas immediately. She is an independent Interior Designer from JB sorry that not convenient to disclose the $$$ here Love so much the marble chips flooring and riverstone at bath area! The red tiles are from JB too, cause we can't find the red that we want in Singapore. The carpentry work will be up next week, keep a look out for more pics, ya !
  13. 5 & 6 Oct 2012 Contractor and his staff are patching all the holes on the walls before proceed with painting. Forgot to take any picture of the activity. Went to Ikea on Friday (5 Oct 2012) to buy daughter's bedframe with underbed Uploaded with ImageShack.us Uploaded with ImageShack.us 7 Oct 2012 Went to new house to see see look look after lunch, first coat of painting is in the progress! Whole house now look much brighter Uploaded with ImageShack.us Uploaded with ImageShack.us Uploaded with ImageShack.us
  14. 04 Oct 2012 Install Toshiba Inverter Sys 3 by All Best. The air-con installer worked from 10am till 7.30pm. As the lights are not up yet, the installer used a tiny torch light to connect all wires to the condenser Damage $2899, good deal as all blowers and condenser are Made In Japan ! MBR - 13K BTU Uploaded with ImageShack.us Daughter's Room - 10K BTU Uploaded with ImageShack.us Son's Room - 10K BTU Uploaded with ImageShack.us Gas piping at Kitchen by City Gas Uploaded with ImageShack.us
  15. Went up to the new house at evening, welcomed by a surprise from ID - my vanity top ! Using left-over floor tiles to create this effect. Like this very much, at least it is different from the normal solid surface or granite top ! Uploaded with ImageShack.us Riverstone at MBR toilet shower area. Can have foot massage and shower at the same time ! Uploaded with ImageShack.us Re-wiring completed today. Tomorrow is air-con installation !
  16. Updates for yesterday progress Balcony was levelled up. The living room now looked spacious ! Re-wiring work commenced Uploaded with ImageShack.us Uploaded with ImageShack.us
  17. Hi there, Am moving to new place on 24 oct, still searching for movers. Was recommended by brother in-law to KNT Movers. Did anyone use their service ? Any comments is much appreciated. Thank you in advance !
  18. Today, we finally completed the marble chips flooring at foyer area ID is arranging the marble chips, while tiler is sticking the chips one by one Uploaded with ImageShack.us Uploaded with ImageShack.us Uploaded with ImageShack.us Closer look at the marble chips, aren't them beautiful ? Uploaded with ImageShack.us View from main entrance Uploaded with ImageShack.us The next schedule : Tuesday - re-wiring Thursday - aircon installation / PUB gas connection Friday till next tuesday - painting Next Wednesday - carpentry delivery Next Thursday onwards - carpentry installation ID & Contractor said, should be able to hand-over by 20 Oct, woo hoo
  19. Thanks May ! The end result is very satisfying, my kids also love the flooring very much ! Told my hubby that this flooring can treat insomnia - whenever we have sleepless night, can start counting the marble chips from foyer to the walkway instead of the sheeps
  20. Updates on Marble chips flooring at the walk way to bedrooms, which ws done on Thursday (27 Sept) ID sieved out the imperfect marble chips and arranged them one by one personally. The whole process took nearly to 4 hours ! Uploaded with ImageShack.us Uploaded with ImageShack.us Closer look at the flooring Uploaded with ImageShack.us Going to complete Uploaded with ImageShack.us Finally completed ! Uploaded with ImageShack.us So in love with the marble chips flooring We shall continue on Monday for the Foyer !
  21. Floor tiles for Bedroom 2 & 3 are done, MBR half way, Study room not yet Bedroom 2 Uploaded with ImageShack.us Bedroom 3 Uploaded with ImageShack.us MBR Uploaded with ImageShack.us According to Contractor, floor tiles for Living / Dining will be completed by this week. ID coming on Thursday to place the marble chips personally at the Walk way to bedroom and Foyer. Arranging Hoe Kee to deliver stuff on Thursday as well.
  22. Thanks for dropping by, potatoes ! Fell in love with the marble chips when ID first shown me the picture how will it look like. Can't wait to see the end result ! Will post the picture once it's done ! Stay tune ya
  23. Thanks Elvin, really enjoy the process ! Though this is the 2nd time of renovation, still very "kan cheong" about it until I go there at least 2 times a day. Whenever contractor's workers see me, automatic "report" the progress, hahaha
  24. Hi baobeimamii, thanks for dropping by ! Due to very tight budget, we are not going for blackout or day & night curtain. Good thing for my new house is no direct sunlight either in the morning or evening. So normal curtain will be sufficient, and we like the house to be bright bright bright ! All curtains are at standard length except for living room with full height. To my surprise, the price between blinds and curtain is only RM100 for bedroom 2 & study room each. So if really no choice, will get curtains only for the whole house.
×