Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

hoaili

Members
  • Content Count

    202
  • Joined

  • Last visited

  • Days Won

    2

Everything posted by hoaili

  1. Uploaded with ImageShack.us Uploaded with ImageShack.us Uploaded with ImageShack.us Uploaded with ImageShack.us TV details My link Home Theatre System details My link Bought this set 3 years ago for $3,000+, sorry can't remember exact amount paid. There are some minor scratches on TV which are not obviously seen. Selling as a set for $1,000. Self collect at Sengkang. Please pm me if interested or whatsapp 8127 8819.
  2. ID has confirmed the floor tiles to be slightly darker for the Common Toilet. Tiles were delivered this morning, tiler is laying the tiles, so no picture for Common Toilet yet. MBR toilet floor tiles yesterday ! Uploaded with ImageShack.us Kitchen floor tiles up too ! Uploaded with ImageShack.us
  3. hoaili

    Curtains Help

    Met the curtain maker who came from JB, was quoted estimated S$1.1k for 1 set of curtain for living room with aluminum railings 1 set of curtain at MBR & bedroom 3 each with aluminum railings 1 set of blind for bedroom 2 & study room each 1 set of blind for MBR She is the first curtain maker I met, and think will just go with her coz her pricing is reasonable. And fabric quality is quit good too !
  4. Met the curtain maker who came from JB, was quoted estimated S$1.1k for 1 set of curtain for living room with aluminum railings 1 set of curtain at MBR & bedroom 3 each with aluminum railings 1 set of blind for bedroom 2 & study room each 1 set of blind for MBR She is the first curtain maker I met, and think will just go with her coz her pricing is reasonable. Today not free to check on the progress, but Was informed by the contractor, MBR toilet floor tiles was up Will take picture tomorrow !
  5. You can try to contact my contractor, Mr Chew at 9009 9039. Currently renovating my EA, tiling workmanship is good ! No complaint so far
  6. Ta-da..... My red kitchen wall tiles are up finally ! Tiles on the other side of the kitchen done too ! Never regretted to get 60x60 wall tiles, as it has less grout lines and make the ktchen look bigger ID & carpenter came from JB to see the progress of the reno work. ID's remark for electrician where to place the powerpoints for Living Hall. Uploaded with ImageShack.us ID is checking on the marble chips delivered from JB. She will be arranging and laying the marble chips personally for the foyer area next week. Uploaded with ImageShack.us
  7. Last layer of water-proofing done at Common Toilet Uploaded with ImageShack.us Tilers are working hard on kitchen tiles Uploaded with ImageShack.us Uploaded with ImageShack.us Uploaded with ImageShack.us
  8. Wall tiles for both toilets are up too ! MBR Toilet - no feature wall Uploaded with ImageShack.us Common Toilet - with feature wall Uploaded with ImageShack.us
  9. Windows are up ! Balcony Uploaded with ImageShack.us Sorry for the following pictures being a litlle bit dark due to lacking source of light MBR Uploaded with ImageShack.us Kitchen Uploaded with ImageShack.us Service Balcony Uploaded with ImageShack.us
  10. Check with HDB first before you confirm with ID. If I am not wrong, HDB will do the screeding for free for the first time. I was dumb enough 12 years ago for not checking with HDb for free screeding for my existing house, end up kena "cheated" by my ID for $1,000+, cannot remember the exact amount le.
  11. Some updates : All wires were taken down yesterday. Uploaded with ImageShack.us Uploaded with ImageShack.us Windows will be installed today ! Mr Chew, the Contractor do all the co-ordination work for me without complain though I engaged few group of people doing different things Uploaded with ImageShack.us Uploaded with ImageShack.us Uploaded with ImageShack.us
  12. Hi Remy I got the lights from VIP Lighting NO 57,59 Jalan Meranti Merah Taman Melodies 80250 Johor Bahru Johor, West Malaysia Tel : +607 333 7339 Yes they do deliver to Singapore but 7% GST is chargeable. You may also want to visit this shop which offers lots of lightings at a much lower price than VIP. A bit regretted not visiting BLE first before go to Chan Huat at Balestier. can save a lot if you choose basic lightings, like for toilet, kitchen and storeroom. They do have wide range of living and dining lightings but VIP offer more sophisticated / designer replica lightings Best Light Electrical Sdn Bhd No. 15-17 Jalan Ros Merah 2/10 Taman Johor Jaya 81100 Johor Bahru Tel : +6019 7550681 Ms Cindy Chong
  13. Also bought the Four Star Single size mattress for our princess, sofa and TV console for our Study cum entertainment room from Furnitures and Furnishing located at Suntec. 3-seater recliner sofa Uploaded with ImageShack.us TV console Uploaded with ImageShack.us Four Star Single size mattress Uploaded with ImageShack.us TOTAL DAMAGE $1392
  14. Today is the shopping day ! Went to Harvey Norman at Suntec, bought the fridge, hood and hob ! Samsung Fridge Uploaded with ImageShack.us Turbo Hob and Hood Uploaded with ImageShack.us Uploaded with ImageShack.us TOTAL DAMAGE $1928
  15. Went to JB on last Friday to collect the lightings for Foyer, Dining and MBR. We use track light for Foyer, cost RM263, sorry that I forgot to take the picture of it. For Dining - 7 legged octopus, cost RM400 (equivalent to SGD161, based on exchange rate 2.48), so much cheaper than in Singapore ! Uploaded with ImageShack.us For MBR - cannot afford crystal lighting as it's too expensive. This one only cost us RM480 (equivalent to SGD193, based on exchange rate 2.48) Uploaded with ImageShack.us TOTAL DAMAGE FOR LIGHTINGS IN JB - RM 1143, (equivalent to SGD461) Other lightings are from Chan Huat, Balestier.
  16. No updates for the last 2 days, but the tiles are delivered ! Marble chips from JB Uploaded with ImageShack.us Kitchen Red tiles from JB (can't find the desired red that I want, so went to JB to source for it ) Uploaded with ImageShack.us Living/all bedrooms floor tiles Uploaded with ImageShack.us
  17. Received call from Contractor, minor hiccup from LSH that they forgot to reserve the floor tiles for Common Toilet, it is now out of stock! How can this happen ? Was told to choose either a slightly darker or lighter tone, now waiting for ID's reply on the tiles colour
  18. Hi MamaO, Indeed they are very fast. Just went up to inspect the progress this morning, hacking was 100% done as promised by the Contractor. Kudos to the workers, hacking only took 1 day to complete. The workers started work at 9am sharp, within an hour, they have cleared the debris in Living and study room, and transporting the sands up to the unit. Uploaded with ImageShack.us Uploaded with ImageShack.us
  19. Somehow I agree with Bro Elvin, furthermore I am that kind of person NEVER got luck in 4D or Toto
  20. Went up to new place at 1pm, guess what ? The hacking was 70% done! Only took 1 pic of the hacked Living. According to Contractor, they are going to remove the debris tomorrow! Progress is satisfying Cement was delivered Uploaded with ImageShack.us
  21. Bedroom 3 Uploaded with ImageShack.us MBR Uploaded with ImageShack.us
  22. Got up at 6am and had "Open Door" ceremony before 7am. Took this chance to take pre-reno pics. Contractor and his workers came at 8.30am, gone through what are the things need to do for the next few days. Dining Uploaded with ImageShack.us Living Uploaded with ImageShack.us Kitchen Uploaded with ImageShack.us Study Room Uploaded with ImageShack.us Bedroom 2
  23. Thank you very much, May ! Reno started this morning 9am sharp.
×