Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

od00bo

Members
  • Content Count

    29
  • Joined

  • Last visited

Everything posted by od00bo

  1. Thanks all. But most of the ID we went don't get back to us with quote when we told them we are not getting the keys yet. Even after we spent more than an hr going though the floorplan and etc...
  2. I'm new to reno and the ID quote us $48k+ for our new 4room (90sqm) which is way over my budget. We have some hacking and etc but still i believed it shouldn't exceed 40k... Maybe i will paste the full quote here and you guys can advise me thanks. A DESIGN SERVICE/ MISCELLANEOUS 1 Job site co-ordination and supervision $ 1,250.00 2 Designer's 3D computerized drawing on the carpentry works inclusive 3 Provide chemical washing for whole house flooring inclusive 4 Submission for HDB Approval inclusive 5 Letter of warranty for 3 years sent upon completion inclusive B HACKING & DISMANTLING WORK subject to HDB approval 1 Hacking of existing wall of bedroom 3 facing living c/w edges smoothern $ 900.00 2 Provide Sand, Haulage service & debris removal $ 700.00 3 Provide dismantling of existing master basin $ 150.00 C MANSORY WORK subject to HDB approval 1 Supply/ lay homogenous floor tiles c/w skirting for living/dining $ 3,500.00 2 Supply/ lay homogenous floor tiles c/w skirting for bedrooms $ 4,200.00 (60cm by 60cm homogenous tiles range $2.50- $3@ below) 3 Construct kitchen cabinet base with tiles skirting $ 300.00 4 Construct washing machine & fridge base with tiles finish $ 180.00 5 Erect & Construct hollow block sink support at kitchen sink support area $ 650.00 (Item 5 is optional to prolong the cabinet lifespan due to water condensation in due time) D CEILING WORKS 1 Supply / install cove L-box plus false ceiling @ living area $ 1,150.00 2 Supply / install fibre plaster false ceiling @ living passageway to bedrooms $ 600.00 3 Supply / install cove L-box plus false ceiling @ master bedroom $ 550.00 E PLUMBING WORK 1 Extend Stainless Steel pipe for whole house (Cold Only) $ 350.00 4 Supply / install imported colour Wash Basin at M/ toilet c/w basin tap $ 205.00 (range $100@, installation $50@, basin tap $55@ ) PER UNIT E-NT LT-2025 4 To lay inlet / outlet pipe for kitchen sink $ 120.00 5 Provide labour for installing bathroom accessories for both toilets $ 100.00 6 Supply and install 1no of instant heater for master toilet toilet c/w 2 way tap $ 235.00 7 Supply and install 1no of instant heater for common toilet toilet c/w 2 way tap $ 235.00 (range $140@ and 2way tap $50@ with installation $45) Ariston EC-3023 8 Supply / install Stainless Steel double bowl sink and sink tap $ 350.00 (range $200@ and kitchen tap $80@ with installation) Rubine/G.Ferretti LP3215 F PAINTING WORK 1 ICI/ Nippon paint for internal wall & ceiling $ 1,350.00 2 Additional top up, to add sealer to whole house wall before commence paint $ 300.00 G TOILETS 1 Supply / install tempered glass shower screen (Fixed + swing) master toilet $ 550.00 H CARPENTRY WORKS (Max ht 2.4m/<600mm) above ht or dpt will be 15% additional (Carpentry works may varies upon site, owner discreet & will validate accordingly) Kitchen (est 34ft top & bott ++) 1 To design and fabricate 16ft Top Kitchen L-Cabinet c/w 1 set of drawers, $ 2,040.00 ABS trimming & Laminate finish 2 To design and fabricate 16ft Bott Kitchen Cabinet c/w laminate doors $ 2,040.00 3 To supply / install additional est 6ft solid surface for kitchen work top $ 840.00 4 Supply & to install tempered black glass top cooker hood (3 burner) $ 867.00 (Rinnai RB-7503D-GBSM 3 burner / Rinnai RH-S239-SSR Slim) 5 To supply / install silent hinges to all kitchen cabinet doors $ 320.00 Foyer 6 To supply & fabricate est 3ft half ht shoe cabinet in laminate finishes $ 875.00 7 To supply & install vertical beams as divder est 4nos $ 800.00 8 To design & fabricate est 4.5ft low ht setee at both sides $ 1,350.00 Living 7 To design & fabricate est 6ft Full/Ht TV feature wall in laminate/glass finishes $ 1,820.00 8 To design & fabricate est 6ft suspended TV console in laminate finishes $ 1,050.00 9 To design & fabricate est 10.5ft Full/Ht tempered tinted glass in frame feature $ 2,450.00 Master bathroom 10 To design & fabricate suspended laminate vanity cabinet $ 600.00 11 To design & fabricate solid surface top $ 480.00 Bedroom 3 12 To design & fabricate est 5ft foldable bracket c/w ply shelf in laminate finishes $ 700.00 13 To supply & install top hung sliding tempered clear glass est 10ft door $ 2,400.00 Master bedroom 14 To design & fabricate est 12ft L-shape sliding door wardrobe in laminate finish $ 3,375.00 15 To design & fabricate 2nos of suspended bedside table c/w drawers $ 650.00 16 To design & fabricate est 2ft of suspended dresser table c/w drawer $ 650.00 I ELECTRICAL WORKS Owner to purchase fixtures (Electrical works may varies upon site, owner discreet & will validate accordingly) Kitchen 1 To supply materials & install hob point at kitchen $ 70.00 2 To supply materials & install additional 1no double power pt to work station $ 60.00 Living 3 To supply wiring & install est 11nos light points c/w installation ****/dining $ 440.00 4 To supply wiring & install 1nos ceiling fan point **** $ 80.00 5 To supply wiring est 4nos light points to cove L-box $ 160.00 5a To supply loop points est 9nos looping includes T5 Flourscent (13nos T5) $ 511.00 6 To relocate SCV point to TV feature c/w console area $ 120.00 7 To relocate 2nos double power point to TV feature c/w console area $ 120.00 8 To supply wiring est 3nos light points to cove L-box $ 120.00 8a To supply loop points est 4nos looping includes T5 Flourscent (13nos T5) $ 210.00 Bedrooms/ Kitchen/ Bathroom/ HS/ Service yard 9 To install owner purchase light fixtures to HDB original statings est 8nos $ 96.00 J DOORS (Non fire-rated) 1 Supply & install of bedroom doors cum lever locksets 2 $ 900.00 K WINDOW / GRILLS WORKS (HT-1.3m/sgl panel) - tinted blue/green/clear glass 1 To supply & install Service yard aluminimum sliding windows $ 900.00 2 To supply & install whole house WPC aluminimum windows grills $ 1,500.00 TOTAL AMOUNT $ 46,519.00 F.O.C ITEMS 1 Rebate of $888 upon sign contract 2 To supply & install FOC 10ft solid surface *Asuka work top for kitchen Total Amount $ 46,519.00 Further Discount $ (888.00) TOTAL AMOUNT $ 45,631.00 7% GST $ 3,194.17 FINAL GRAND TOTAL AMOUNT : $48,825.17
  3. Is the below reasonable? Job site co-ordination and supervision $ 1,250.00 Thanks
  4. Hi all, I'm new to this forum and hope to get some feedback. Been browsing this forum or this thread and saw good review about SDS esp like William, Nicholas and etc... Therefore last week, my wife & me dropped by to take a look. It's Nicholas(ID) who served us and he gave us a good impression. A very detailed guy and sound very sincere. Anyone uses Nicholas as your ID before? He mentioned he's quite new just joined SDS so i'm abit unsure but i feel that if i can get some positive feedback, he should be ok.
×