Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Haleary

Members
  • Content Count

    60
  • Joined

  • Last visited

Everything posted by Haleary

  1. Hi star70' We got it online, and got the supplier to DHL to Singapore. The hammock can take the weight up to 100kg. The rest of the things like the rope, hooks are purchased locally in hardware shop. Jaime
  2. Yeah! My Republic has been installed. Can now work properly at home le! No more slow connection using mobile broadband
  3. After the reno headache from buying stuff etc, now comes the bodyache. It's a tiring but satisfying process where we finally have our own home. Really want to thank our ID Jimmy from 3D innovation for his effort and good work. From the start, our initial meeting with Jimmy, he had shown us confidently his existing project, without hesitation even when it's already late at night ard 11pm. We were very comfortable with him from the first meeting onwards. Moving along, we work towards our goal, while keeping our budget in mind. Out of the entire quotation, we did not encounter any 'hidden cost'. His quotation is more or less 100% accurate. Really glad that we had engaged Jimmy for this reno as we really wanted to make this home as perfect as possible. Haha, not sure if our ID read this blog, We want to say 'Thank You!' to you and your hardworking team for the good job done.
  4. Cos Audio House fly us aeroplane, We demanded them to do refund, and went to Courts AMK and get another set of TV. Got a 52' & 40' Sharp 3D LED TV. The 3D glasses that came with the 2 TV. We get 4 pairs in total.
  5. Audio house is now telling me they can only refund me partial of my payment $699, as our purchase was done separately at the expo sale on 27 May ($729) and at Liang court, $699 on 14 June. The remaining $729 has to wait for up to one month cos they need to manually process the refund as the amount was charged to my card using 'another machine'. Lol, this is really crap. Take money so fast, refund need 1 month?
  6. Just received a call from Audio House regarding our order of 2 units of Panasonic TV that comes with free wall mounting, 7" tablet and HDMI cable. We have scheduled the delivery of the 2 Panasonic 42' LCD TV, Internet ready for tomorrow where we shift in, together with all new furniture and electrical goods on the same day. However, on the day before delivery, they call us up to inform no stock. And that they ask us to accept replacement of another Panasonic 40' LED TV with no free tablet and not Internet ready. We ordered the TV in end may, with full payment. Shouldnt they reserve stocks? Very bad experience with them. Leaving us no choice, expecting us to accept. Asked for refund and was told we need to personally go down and get our refund thru credit card. Waste our time n petrol. Will never consider buying from Audio House again.
  7. Carpentry work Master bedroom wardrobe Our girls bedroom wardrobe Shoe Cabinet at Balcony
  8. Light effects - corridor to bedroom Light effects - dinning room
  9. Today electrican finally connect the cables, and we can turn on the light. It's really bright, even during daytime, I notice a huge diff in terms of brightness. Hehe good la, make up also easier...
  10. Hi Pinkydot, You have a very nice place!! It's really a transformation.
  11. Openet contractor working alongside with my contractor. Haha at first insist to do it his way, which makes our living room look messy with the trucking around all over. Then I kept saying 'No lah, Cannot lah' then I use their trucking to show them it can fit at the side of our main door. As our contractor is around, he also show them our preferred routing. End up they no choice they listen and do what we want. Kept borrowing tools from my contractor. Haha I end up have to ask my contractor did he take back all those borrowed tools.
  12. We went to premplus and they are one of the short listed firm for our Reno. The guy who attended to us, a young chap, by far, is someone who do cater to our needs by asking us, and listen to what we had in mind and can visualize our new home, based on floor plan. The main drawback in my opinion is they are slow in quotation, and always provided us with lump sum when we already specify it. I had to chase for quotation until I give up. Another thing at that point, we requested to visited their current project, they told us they dun have any to show us, unless we visit their sister company which they had a part in - their carpentry. We decided to sign up another company as we find the other one more sincere, very responsive although they are slight more ex then premplus. But it's the rapport and confidence level that counts.
  13. Wow! Ur WIW got light means big le la. Our wardrobe no light
  14. Hi, Just pm u the contacts where we got the slimline. Reno so far so good. We're on track. At the moment, we have agreed to some VOs that's ard 1.7k. And that should be all for any additional we need to pay. Cos we added plastering during the Reno process.
  15. Did a small project for the girls to hang their clothes in the bedroom. Waiting for them to decorate it themself in the white space. Hope the girls will like it.
  16. Pub send some city gas technician today, and confirm no gas leakage from the gas riser pipe. We can proceed to cabinet installation in the kitchen. Parquet vanish, chemical wash will likely happen later part of this week, painting of walls and doors will be during weekend. By 25th June, house will be more or less done up. Next week should be Installation works for fittings etc. we appeared to be quite on target with the timeline. All furniture delivery push to end of the month. Yeah!
  17. Update: We have by far purchase all essential electrical appliance. Ordered another 42' Panasonic TV for our room from audio house. That's $699 with bracket n mounting and a 7' tablet. For Internet connectivity, we're going purple. Opennet installation on 25 June, Myrepublic coming down for installation on 2 July. Monthly $59 with free installation and activation, include a wireless router and a free repeater as we opt out of home voice service. Haha hope that after that I can go 'green' by not wasting petrol to roll into office. Lol.
  18. Yeah! Another good buy. 2 units of Mistral Slimline heater MSH909 at $129 per unit. Outside selling at $168
  19. Hmm, was told that the kitchen window grille won't be able to fit back. Need to replace a new one. But our ID is telling us dun worry cos he will help us to absorb the cost of it.
  20. Today we went to Lucky Khoon this morning. It was recommended by my ID. We though of buying there, to save some hassle in case we need to do exchange, our ID can assist if need be. But pricing isn't attractive, so we drop the idea and went shopping elsewhere. Our next destination was suppose to be Universal Union, but on the way walking from the carpark, we passed by Heritage Bathroom Gallery and went in to have a look. Service from the shop is quite good and friendly. So we ended up buying there instead and proceed to Singapore Expo when we bought another item which we didn't plan to buy so early (again) haha
  21. Day is the 3rd day. Laying tiles starting. Yesterday our ID suggested we do plastering for the whole house. And we went ahead after some bargaining. It was a Sales vs Sales talk yesterday and I think he also sweat when he see me with the original quote in hand, and hubby has his measuring tape in his. For each extra item, we will counter with 2 items reduction. Either remove, or reduce. On the other hand, I kept asking him to confirm anymore 'surprise' for us better put upfront.
  22. Hi Tim, Please quote me Starmex system 3, invertor. Please advise are the material used. Armaflex, G22? Kindly break down the price for system / installation, and any additional/foreseeable costing as well. Do indicate if the price includes GST. Existing, the hse has system 3, Fujitsu, any trade in price?
×