Kitchen island and stove cabinet Selected design and laminates
-
Kitchen Selected design and laminates
-
Living room false ceiling Rough look and feel after paint colors and furniture selection
-
Common toilet Selected design and laminate
-
* 3D Drawings done by Wee Kuang. Free of Charge ! Bedroom 2 Selected design and internal compartments
-
Hi all, Finally renovation coming to an end, furniture coming in next monday 28 May 2012. Carpentry almost completed and the only major item left will be glass/mirror works. Sorry for the long delay as carpentry works have a few hiccups here and there. Really grateful for my carpenter for doing all the rectifications. Renovation is really not an easy work, really glad that it is ending soon. Pictures coming soon.
-
Hi, So sorry, been too busy with work and do not have the time to update my renovation progress. Never even realized that photos cannot be viewed. Am trying to change all my pics to imageshack site. Thanks.
-
Hi, I got it at $1.1K. No choice, wife likes it.
-
* Toilet accessories Not forgetting this big thing * Thats all for now coz not much physical work done, for the past 2 weeks are 3D confirmations. Will try to post some of the designs Wee Kuang drew for me as well as my confirmation. Crossing fingers for my actual carpentries.
-
* Lightings My favourite - Island lightings with remote control
-
* Lightings on Cove lights still need some fine tuning Foyer Kitchen
-
* Lightings Bedrooms Toilets Master toilet Master bedroom passageway
-
* All set for lights installation My downlights Kitchen Service yard Bomb shelter
-
* Next is painting and laminate floorings Master bedroom with platform
-
* Patching
-
* False ceiling on the way * Master bedroom island false ceiling * Hacked kitchen patching
-
* Completed cemend screed for bedrooms
-
* Master bedroom electrical, last minute inject for the electrician * HDB cement screed before my laminated flooring from Supreme
-
* Electrical Downlights and covelights arrangements? -
-
* Tiling
-
* Started hacking work Kitchen entrance hacked, open concept * Followed by tiling * Not forgetting my shower kerb at common toilet
-
Progress update 03 May 2012 - Day 37 * 3D finally confirmed and carpentries fabrication in progress. Hopefully can see something next week. Renovation pictures
-
Will upload the renovation progress pictures later on.