Hi fellow RT members, Pls comment whether if this quotation is considered reasonable. Appreciate your help. Thanks. Hacking Works - Hacking of wall & floor tiles at bathroom $500 - Dismantling of existing WC and basin $100 - Dismantling of door $50 - Haulage of materials and clearing of debris $100 Plumbering Works - Stainless steel water piping $300 - installation of WC and basin (provided by owner) $150 - installation of 1 nos 2 way tap (provided by owner)$40 - installation of heater (provided by owner) $70 Wet Works - Homogenous floor tiles ($3 psf) $380 - Ceramic/Homogenous wall tiles ($3 psf) $1850 - Water proofing $200 - Construction of shower kerb $100 Capentry Works - installation of ABS laminated vanity cabinet $550 - installation of solid surface vanity top $270 - installation of ABS laminated top shelvings w mirror $330 Others - 1 nos PD door $400 - 1 nos shower screen $550 Total: $5940